Permits, inspections and a file that closes.
Permit applications, HVHZ product approvals, inspections and sign-offs across Miami-Dade and Broward, plus the unglamorous work of closing out open permits and legalizing what a previous owner never filed. Licensed general contractor, Lic. CGC1539072.
Permitting & Compliance in Miami-Dade & Broward
One code, two counties, many front desks.
Permitting is the part of a high-end project nobody puts on a mood board and everybody remembers. At this level it means a complete drawing set, sealed engineering wherever the structure changes, product approvals matched to the right openings, a permit issued in a licensed contractor's name, and a file that eventually closes. Two kinds of owners call us. The first is planning serious work and wants it legal, insurable and appraisable. The second already has a problem: an open permit from a prior owner, a failed inspection, a recertification notice, or a garage conversion nobody ever filed.
Two things make South Florida different. Miami-Dade and Broward together form the state's High-Velocity Hurricane Zone, so every window, door, skylight and roof assembly in the set has to carry a Miami-Dade Notice of Acceptance or a Florida Product Approval valid in the HVHZ, with anchor details and installation instructions attached. Near salt water the code also gets specific about corrosion-resistant fasteners and connectors. And the counties are not interchangeable: each has its own board of rules and appeals publishing the county amendments and certifying the officials who will review your job, and Miami-Dade's Product Control Section is where the NOAs themselves originate.
We scope permitting the way we scope construction, in writing and before anything moves. A walk-through first, then an honest read of what the work actually triggers, then the right professionals engaged early, architect, structural engineer and surveyor, so the application goes in complete instead of in pieces. Incomplete sets are what turn one review cycle into three. Once the permit issues, inspections are phased and a supervisor from PGX is on site to meet the inspector. The last line on our schedule is not the final coat of paint. It is the final inspection and a permit marked closed.
The rules change every few miles. A Coral Gables exterior answers to the Board of Architects, Miami Beach adds historic review, Fisher Island and the Ponce-Davis pocket file with unincorporated Miami-Dade, the Las Olas isles and Rio Vista go through Fort Lauderdale, and the barrier towns, the condo corridors and the western estate areas each run their own building department. Flood elevation and association approval matter on one street and not on the next. We serve 42 areas across the two counties. Every one of them has a page here naming the authority you will actually deal with.

Where we build
Miami-Dade County
Broward County
Every area we serve, for this service. Not listed? Call (786) 273-2524.
What's included
What we handle on the paperwork side.
Permitting is a service here, not a favor attached to a construction contract. These are the pieces we take on, together or on their own.
Permit applications and plan review
Complete submittals filed under our license, with drawings, engineering and product data assembled up front, then comments answered and resubmitted until the permit issues.
HVHZ product approvals
Windows, doors, skylights and roofing matched to a Miami-Dade NOA or an HVHZ-valid Florida Product Approval, with the anchor details and installation instructions an inspector will ask to see.
Inspections, phased and passed
Rough through final scheduled in the right sequence, with a supervisor on site to walk the inspector through the work, because a failed inspection costs a week nobody budgeted.
Closing out open permits
Reactivating expired permits, taking assignment when the original contractor is gone, correcting whatever the file is missing, and passing the final inspection that clears the way to closing.
Legalizing unpermitted work
Garage conversions, enclosed terraces, additions and impact openings that were never filed, brought back through as-built drawings, engineering and inspection against the code in force today.
Recertification and milestone repairs
Coordinating the engineer's report for building recertification or a milestone inspection, then pricing and building the structural, electrical and waterproofing repairs the report calls for.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Does my project actually need a permit?
How long does permitting take in Miami-Dade or Broward?
What does permitting cost?
Where do permit files get stuck?
Who handles this day to day?
There is an open permit on the house and we are trying to close. What now?
Contact
Send us the address and the problem
Planning work, or holding a file that never closed. Either way we look it up, tell you what it takes, and put it in writing. Ask in English o en español.