Architectural floor plans and permit drawings — permitting & compliance in Lighthouse Point, Florida. Architectural rendering.

Permitting & Compliance · Lighthouse Point, FL

Clear the file before you sell.

Permits pulled, HVHZ product approvals, inspections met on site, and the open or expired permits that stop a sale, closed out through the City of Lighthouse Point Building and Zoning Department. Licensed general contractor, Lic. CGC1539072.

Licensed & insured Lic. CGC1539072 Lighthouse Point · Broward County Hablamos español

Permitting & Compliance in Lighthouse Point

What the address history actually says.

Half the permitting calls we take from Lighthouse Point begin with a title search. A reroof on a Venetian Isles ranch that was never signed off. A pool cage in Coral Key Villas replaced after a storm with nothing filed. A Florida room in Lighthouse Manor enclosed sometime around 1978 and still showing as a screened porch on the record. Houses here have changed hands and changed shape for sixty years, and the paperwork has not always kept pace. The rest of the calls are happier: an owner about to start something real who wants the file ahead of the work instead of chasing it later.

The permit itself is a City of Lighthouse Point matter, handled by the Building and Zoning Department through the city's online permitting portal, and contractors have to be registered with the city before they can pull one. Above that sits a layer you will never file with. The Broward County Board of Rules and Appeals is where the county's amendments to the Florida Building Code live, it certifies the plans examiners and inspectors who will handle your file, and it hears the appeal when a call needs one. Broward is High-Velocity Hurricane Zone territory, so glass, doors and roofing carry HVHZ approvals, and anything in or over the canal adds county environmental licensing.

The permit goes out under our license, CGC1539072. PGX Builders Group is a general contractor rather than a paperwork service, so accountability arrives with the signature. We read the address history before promising anything, engage the engineer, architect or surveyor a complete submittal genuinely requires, resolve plan review comments in one cycle instead of dragging the file through three, and stand on the site when the inspector arrives. Twenty-plus years of South Florida work, 150-plus remodels and additions, all of it permitted and inspected. We do not call a job finished because the punch list is. We call it finished when the city's record for your address is clear.

Architectural floor plans laid out for a permit submittal — architectural rendering

Where we work in Lighthouse Point

Venetian Isles Coral Key Villas Coral Key Harbor Hillsboro Isles Lighthouse Manor Wooler Heights Pompano Waterway Estates Lake Placid Lighthouse Colony Lighthouse Harbor Lighthouse Point Estates Hillsboro Estates

Elsewhere in Lighthouse Point? Call us — if it's in Miami-Dade or Broward, we probably build there.

What's included

Getting the record clean.

Filed ahead of a remodel or opened up years after somebody else's work, these are the five fronts that decide whether a Lighthouse Point address survives a title search.

01

Permits left open

Every open or expired record on the address identified and sorted by what it still needs, then driven to the inspection or replacement permit that finally closes it.

02

Legalizing what was never filed

Florida rooms enclosed decades ago, garage conversions and unrecorded window swaps documented with as-built drawings, engineered where the structure demands it, and inspected under today's code.

03

Windows, doors and their NOAs

Openings and roofing specified to approvals that hold inside the High-Velocity Hurricane Zone, with anchor details and manufacturer instructions in the submittal rather than produced afterward.

04

Inspections met on site

Phased inspections called when the work is genuinely ready, with a supervisor present to walk the inspector through it instead of a note left on the door.

05

Waterfront filings, in order

Dock, lift and seawall scopes sequenced so the Broward County environmental license, the city engineering permit and the building permit land in the order the city expects.

Elevation drawings and plan set for a building permit — architectural rendering

How we work

A remodel is a promise. We keep it in writing.

20+
Years building in South Florida
150+
Remodels and additions delivered
100%
Permitted and inspected work
1
Team accountable from estimate to warranty

AFixed scope, honest pricing

A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.

BA superintendent on site, daily

Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.

CBuilt to code, warrantied in writing

HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.

How it goes

From first walk to final walk-through.

01

Walk-through & estimate

We visit, measure, listen, and come back with a real scope and a real number — not a teaser.

1–2 weeks
02

Design & permits

Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.

4–10 weeks
03

Construction

Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.

Per scope
04

Closeout & warranty

Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.

1–2 weeks

FAQ

Straight answers.

Title turned up an open permit from a prior owner. Now what?
We pull the record at Building and Zoning and read what each open item is genuinely missing. Some are waiting on nothing more than a final inspection nobody ever requested. Others need a revision, an engineer's letter, or a fresh permit because the original lapsed on its own. Where the work was never permitted at all, expect to apply after the fact and to expose enough of it for an inspector to verify. The city closes a permit by inspecting it, so begin the day it turns up.
Does Broward County get involved, or is this all city?
Both, in different ways. The permit lives with the City of Lighthouse Point, which reviews it, issues it and inspects it, and the application goes in through the city's portal. The Board of Rules and Appeals sits behind the city's building official rather than in front of the homeowner, so you never file anything there. What does take a separate county application is work in or over the waterway, a dock, a lift, a seawall, and that approval runs on its own clock.
Which projects in Lighthouse Point actually need a permit?
More than most owners assume. Cosmetic finishes such as paint, carpet and tile generally do not need one. Nearly everything else does: plumbing and electrical changes, structural openings, window and door replacement, roofing, patios, pool decks, fences, driveways, generators and accessory structures. Working without one risks a stop work order and a penalty on top of the ordinary fee, and it leaves a gap in the record that a buyer's inspector or a title search eventually finds.
Does the 40-year style recertification apply to my house here?
Not to a single-family house. Broward County requires building safety inspections on older buildings above a size threshold, administered here by the city's Building Department, and single-family homes and duplexes are exempt, which covers most of Lighthouse Point. Where it does apply, on older multi-family and commercial buildings, the obligation belongs to the association or building owner rather than an individual. Florida's milestone inspection and reserve study rules apply separately to condominium and cooperative buildings of three habitable stories or more. Repairs a report calls for are work we take on.
We refinance in a few weeks. Is that enough time to fix this?
Sometimes, and it depends entirely on what the file is short of. A permit waiting only on its final inspection can move quickly. Anything needing sealed engineering, a revision, a new survey or waterway review counts in weeks, not days, because those approvals run one after another instead of side by side. Fee schedules belong to the city and rise with the declared value of the work, so we put real numbers against your actual scope rather than guess at one here.

Contact

Read the file before you list

Tell us the address and what the title company found. We read the city file, say what is still open, and price the way out, in English o en español.

Office
Miami, FL
Hours
Mon–Fri, 8:00–18:00
Opens your email app — nothing is stored on this site.