
Permitting & Compliance · Lighthouse Point, FL
Clear the file before you sell.
Permits pulled, HVHZ product approvals, inspections met on site, and the open or expired permits that stop a sale, closed out through the City of Lighthouse Point Building and Zoning Department. Licensed general contractor, Lic. CGC1539072.
Permitting & Compliance in Lighthouse Point
What the address history actually says.
Half the permitting calls we take from Lighthouse Point begin with a title search. A reroof on a Venetian Isles ranch that was never signed off. A pool cage in Coral Key Villas replaced after a storm with nothing filed. A Florida room in Lighthouse Manor enclosed sometime around 1978 and still showing as a screened porch on the record. Houses here have changed hands and changed shape for sixty years, and the paperwork has not always kept pace. The rest of the calls are happier: an owner about to start something real who wants the file ahead of the work instead of chasing it later.
The permit itself is a City of Lighthouse Point matter, handled by the Building and Zoning Department through the city's online permitting portal, and contractors have to be registered with the city before they can pull one. Above that sits a layer you will never file with. The Broward County Board of Rules and Appeals is where the county's amendments to the Florida Building Code live, it certifies the plans examiners and inspectors who will handle your file, and it hears the appeal when a call needs one. Broward is High-Velocity Hurricane Zone territory, so glass, doors and roofing carry HVHZ approvals, and anything in or over the canal adds county environmental licensing.
The permit goes out under our license, CGC1539072. PGX Builders Group is a general contractor rather than a paperwork service, so accountability arrives with the signature. We read the address history before promising anything, engage the engineer, architect or surveyor a complete submittal genuinely requires, resolve plan review comments in one cycle instead of dragging the file through three, and stand on the site when the inspector arrives. Twenty-plus years of South Florida work, 150-plus remodels and additions, all of it permitted and inspected. We do not call a job finished because the punch list is. We call it finished when the city's record for your address is clear.

Where we work in Lighthouse Point
Elsewhere in Lighthouse Point? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
Getting the record clean.
Filed ahead of a remodel or opened up years after somebody else's work, these are the five fronts that decide whether a Lighthouse Point address survives a title search.
Permits left open
Every open or expired record on the address identified and sorted by what it still needs, then driven to the inspection or replacement permit that finally closes it.
Legalizing what was never filed
Florida rooms enclosed decades ago, garage conversions and unrecorded window swaps documented with as-built drawings, engineered where the structure demands it, and inspected under today's code.
Windows, doors and their NOAs
Openings and roofing specified to approvals that hold inside the High-Velocity Hurricane Zone, with anchor details and manufacturer instructions in the submittal rather than produced afterward.
Inspections met on site
Phased inspections called when the work is genuinely ready, with a supervisor present to walk the inspector through it instead of a note left on the door.
Waterfront filings, in order
Dock, lift and seawall scopes sequenced so the Broward County environmental license, the city engineering permit and the building permit land in the order the city expects.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Title turned up an open permit from a prior owner. Now what?
Does Broward County get involved, or is this all city?
Which projects in Lighthouse Point actually need a permit?
Does the 40-year style recertification apply to my house here?
We refinance in a few weeks. Is that enough time to fix this?
Contact
Read the file before you list
Tell us the address and what the title company found. We read the city file, say what is still open, and price the way out, in English o en español.