Architectural floor plans and permit drawings — permitting & compliance in Sea Ranch Lakes, Florida. Architectural rendering.

Permitting & Compliance · Sea Ranch Lakes, FL

Decades of decisions, one open file.

Permit applications, HVHZ product approvals, inspections and final sign-offs inside the Village of Sea Ranch Lakes, plus the open and expired permits a prior owner left behind. Licensed Florida general contractor, Lic. CGC1539072.

Licensed & insured Lic. CGC1539072 Sea Ranch Lakes · Broward County Hablamos español

Permitting & Compliance in Sea Ranch Lakes

Small village, long paper trail.

Most permit trouble inside this gate is inherited. Turnover is rare, so when a Sea Ranch Lakes house finally changes hands the file carries decades of other people's decisions: jalousies swapped for impact glass by a company that closed, a Florida room glassed in on Saranac Road, a garage turned into an office, a dock and lift rebuilt after a storm, a service panel upgraded on a handshake. None of it shows in the house. All of it shows in a title search, an appraisal, or a lender's file three weeks before funding.

Permits here are filed at the Village office on Gatehouse Road, where the Village Clerk takes the application in, the building official and the Village's consulting professionals review it against the Florida Building Code and the Village land development code, the Beach Club citizen board comments on anything visible from outside, and the Council acts. Behind the Village sits the county: the Broward County Board of Rules and Appeals publishes the amendments and certifies the officials and inspectors who will read your file. Broward is High-Velocity Hurricane Zone territory, so windows, doors and roofing need approved products with the anchor details attached.

PGX Builders Group has spent more than 20 years building in South Florida and delivered 150-plus remodels and additions, every one permitted and inspected, which is another way of saying we have read a great many bad files. We pull the address history before pricing anything, open up whatever has to be seen, and bring in the engineer, architect or surveyor the record requires instead of pretending to be one. Flood elevation gets checked early on the Intracoastal and lake lots, because crossing the substantial-improvement threshold changes the project. A supervisor books each inspection and meets the inspector at the gate. Nobody here is selling a shortcut.

Architectural floor plans laid out for a permit submittal — architectural rendering

Where we work in Sea Ranch Lakes

Gatehouse Road Cayuga Road Seneca Road Minnetonka Road Saranac Road Winnebago Road Oneida Lane Chippewa Lane Mendota Lane Tahoe Lane Winona Lane Lake Cayuga Lake Seneca

Elsewhere in Sea Ranch Lakes? Call us — if it's in Miami-Dade or Broward, we probably build there.

What's included

Inside the gate, on the record.

Some of this happens before a shovel moves. The rest happens because something already went sideways. Either way it starts with the record, not a phone call.

01

Open files behind the gate

Requesting the full permit history for the address, establishing what was actually built, then reactivating, correcting or re-inspecting whatever the Village needs to close each one.

02

Unpermitted work, documented

Enclosed Florida rooms, converted garages, added baths and windows swapped years ago, recorded as built, engineered where the code requires it, then inspected against today's standards.

03

Approved products, proper anchors

Impact windows, doors and roofing with current High-Velocity Hurricane Zone approvals, installed to the anchor pattern the approval specifies and documented before the inspector asks.

04

Inspections without a second trip

Trades staged so each phased inspection arrives genuinely ready, someone from PGX on site when the inspector clears the gatehouse, and the final actually called.

05

Tree, dock and flood filings

Village tree removal and replacement planting, Army Corps and county approvals on the waterway side, and the elevation certification a flood-zone lot requires.

Elevation drawings and plan set for a building permit — architectural rendering

How we work

A remodel is a promise. We keep it in writing.

20+
Years building in South Florida
150+
Remodels and additions delivered
100%
Permitted and inspected work
1
Team accountable from estimate to warranty

AFixed scope, honest pricing

A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.

BA superintendent on site, daily

Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.

CBuilt to code, warrantied in writing

HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.

How it goes

From first walk to final walk-through.

01

Walk-through & estimate

We visit, measure, listen, and come back with a real scope and a real number — not a teaser.

1–2 weeks
02

Design & permits

Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.

4–10 weeks
03

Construction

Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.

Per scope
04

Closeout & warranty

Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.

1–2 weeks

FAQ

Straight answers.

An open permit turned up on the house and the sale is moving. What now?
Start with the record. Ask the Village office for every permit ever pulled on the address, which inspections were signed off and where the file stopped. Then it becomes a diagnosis: sometimes only a final is missing, sometimes what was built no longer matches what was approved, and sometimes the permit sits under a contractor who went out of business years ago. All three have a path. None of them has a fast one, which is why the call should come now rather than the week of funding.
Which projects inside the Village actually need a permit?
More than owners expect. Anything touching structure, roofing, windows and doors, electrical, plumbing, gas or mechanical does, and so do pools, decks, driveways, docks, seawalls and fences. Taking down a tree carries its own Village permit with replacement planting set by the Council. Paint, flooring laid over an existing slab and cabinets replaced in place generally do not. The items that quietly go unfiled are the ones that cost most later: a garage converted, a porch glassed in, a panel changed, a water heater moved.
Is this a Village matter or a county matter?
Both, in different ways. The permit is issued through the Village office on Gatehouse Road, and the reviewing is done by the building official and the Village's consulting professionals, with the Beach Club citizen board commenting on exterior design and the Council taking final action. You do not file anything with Broward County, but its Board of Rules and Appeals certifies the people reviewing and inspecting and publishes the amendments they apply. A detail that cleared review in another county can still draw comments here.
Does milestone inspection or building recertification apply to my house?
Not to the houses. Florida's milestone inspection and structural integrity reserve study requirements reach condominium and cooperative buildings of three habitable stories and up, and county recertification programs are aimed at multifamily and commercial buildings rather than single-family homes. The condominium that replaced the old Sea Ranch Hotel is a different conversation than a block ranch on Mendota Lane. Where a board already has an engineer's report in hand, PGX coordinates the licensed professional who signs it and builds the repair scope that follows.
What does it cost to put unpermitted work right?
It depends on what is behind the stucco, and anyone quoting before opening it is guessing. A missing final on sound work is a small item. A room built with no engineering, or a re-roof done without approved products, can mean exposing it and rebuilding to current code. Permit fees are set by the schedule and scale with the value of the work, so they are neither ours to discount nor to mark up. What you get is a written scope, real allowances and the bad news first.

Contact

Before the gate opens for a buyer

A permit number, a title report or just the address is enough to start. We come look, then tell you in writing what it takes, in English o en español.

Office
Miami, FL
Hours
Mon–Fri, 8:00–18:00
Opens your email app — nothing is stored on this site.