Renovated kitchen with marble island and custom cabinetry — kitchen remodeling in Sea Ranch Lakes, Florida. Architectural rendering.

Kitchen Remodeling · Sea Ranch Lakes, FL

A kitchen that faces the lake.

Custom cabinetry, stone counters and structural openings for Sea Ranch Lakes kitchens, including the block wall standing between you and the water, permitted through the Village office and supervised daily by a licensed general contractor.

Licensed & insured Lic. CGC1539072 Sea Ranch Lakes · Broward County Hablamos español

Kitchen Remodeling in Sea Ranch Lakes

Where the 1958 galley used to be.

Houses on Cayuga Road and Seneca Road were built when a kitchen was a galley with a pass-through, tucked at the back beside the carport and walled off from the Florida room. The lake is on the far side of that wall. So a kitchen project in Sea Ranch Lakes is usually the same story in different finishes: take out the partition, absorb the old utility room or breakfast nook, set an island where the pass-through was, and let whoever is cooking look at the water like everybody else in the house.

Kitchen work touching plumbing, electrical, mechanical or structure gets permitted through the Village office on Gatehouse Road, where the Village's building official reviews plans against the Florida Building Code as administered in Broward County. If the scope stays inside the walls, the path is short. Enlarge the window over the sink or cut a new opening to the terrace and you are changing the exterior, which brings design comment from the Beach Club citizen board and action by the Village Council. Older houses here also tend to need an electrical service upgrade before a modern appliance package is legal.

Structure and rough-ins go first, then boxes set and leveled, then stone templated off the actual cabinets rather than off a drawing. Selections are locked before demolition so nothing sits waiting on a backordered hood. Adjacent rooms get papered, taped and protected, because in a house this size the dust has nowhere else to go. Fixed written scope, one supervisor on site daily, one accountable team from estimate to warranty. Licensed and insured under Lic. CGC1539072, with 20-plus years of South Florida work behind it.

Marble backsplash and brass fittings in a renovated kitchen — architectural rendering

Where we work in Sea Ranch Lakes

Gatehouse Road Cayuga Road Seneca Road Minnetonka Road Saranac Road Winnebago Road Oneida Lane Chippewa Lane Mendota Lane Tahoe Lane Winona Lane Lake Cayuga Lake Seneca

Elsewhere in Sea Ranch Lakes? Call us — if it's in Miami-Dade or Broward, we probably build there.

What's included

The new kitchen, piece by piece.

Every line is priced before a single cabinet is ordered. These are the elements that appear in nearly every village kitchen we build.

01

Cabinetry built to fit

Made-to-order boxes and doors scaled to eight-foot ceilings, finished for coastal humidity, with interiors specified around how you actually store things.

02

The wall to the lake

Load path calculated, beam engineered and permitted, then the block partition between the old galley and the water view comes out for good.

03

Islands templated in place

Stone templated in place once the cabinets are set, with island framing engineered for the weight of the slab actually chosen and any seating overhang carried on steel brackets rather than on the substrate.

04

Appliances relocated and vented

Relocated ranges, hoods, refrigeration and wine storage on dedicated circuits, with permitted gas runs and exterior venting detailed so nothing whistles in a squall.

05

Power the house lacks

Panel and service upgrades coordinated with the underground feeds, plus layered lighting on separate controls instead of one glaring fixture in the ceiling.

Stone island and seating in a remodelled kitchen — architectural rendering

How we work

A remodel is a promise. We keep it in writing.

20+
Years building in South Florida
150+
Remodels and additions delivered
100%
Permitted and inspected work
1
Team accountable from estimate to warranty

AFixed scope, honest pricing

A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.

BA superintendent on site, daily

Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.

CBuilt to code, warrantied in writing

HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.

How it goes

From first walk to final walk-through.

01

Walk-through & estimate

We visit, measure, listen, and come back with a real scope and a real number — not a teaser.

1–2 weeks
02

Design & permits

Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.

4–10 weeks
03

Construction

Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.

Per scope
04

Closeout & warranty

Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.

1–2 weeks

FAQ

Straight answers.

Does a kitchen remodel here have to go past the Village Clerk?
If it touches plumbing, electrical, mechanical or structure, and a real kitchen touches all four, then yes. The application moves through the Village office and gets inspected as work proceeds. Cosmetic swaps into existing hookups do not. Unpermitted work has a habit of surfacing in a village where two hundred owners talk to each other and every resale gets read closely, and retroactive permitting is the expensive route.
Can the wall between the kitchen and the Florida room come out?
Usually. These are concrete block houses with cast tie beams, so an interior partition often carries less than owners fear, but only an engineer can answer it honestly. We open a small inspection area, get the load path calculated and sealed, then permit the beam. Occasionally the wall is doing real work and the answer is a beam and column pair rather than a clean opening. Either way, you see the drawing before you see a price.
Will a proper island even fit in a house this size?
More often than the original floor plan suggests, because the square footage already exists. It is simply divided into a galley, a utility room and a breakfast nook nobody uses. Combining those usually yields a room that takes a real island with seating. What we will not do is force one in that leaves you sidling past an open dishwasher. Where the space truly resists, a peninsula and a smarter layout beat a bad island.
How long does the kitchen stay out of service?
Custom cabinetry drives the calendar. Quality packages take months to fabricate, so we order early and hold demolition until the shop confirms delivery. On-site work generally runs a couple of months, longer when a structural opening or a service upgrade is involved. Seasonal owners often schedule the whole thing for summer and return in November to a finished room. We set up a temporary kitchen either way.
What actually drives the price of a kitchen at this level?
Cabinetry and stone lead, appliances follow closely, then come the invisible items: the structural opening, the panel upgrade, the plumbing you are relocating. Two quotes for the same kitchen usually differ because one of them assumed the electrical was fine. We walk it, scope it, and set a fixed number against a written specification. Certainty is what we sell, rather than being the lowest of three numbers.

Contact

Measure the kitchen with us

Show us the room and the view it is currently hiding. We send back a fixed written scope, in English o en español.

Office
Miami, FL
Hours
Mon–Fri, 8:00–18:00
Opens your email app — nothing is stored on this site.