Architectural floor plans and permit drawings — permitting & compliance in Davie, Florida. Architectural rendering.

Permitting & Compliance · Davie, FL

Inherited work, finally on the record.

Permit applications, HVHZ product approvals, inspections carried through to a signed final, and the open or expired permits a previous owner left on your Davie property. Filed through the town's OAS portal by a licensed general contractor, Lic. CGC1539072.

Licensed & insured Lic. CGC1539072 Davie · Broward County Hablamos español

Permitting & Compliance in Davie

A town desk with rural rules.

Permit trouble in Davie is usually inherited, and it is usually big. A barn out on a Griffin Road acreage parcel grew an apartment for a working student. A lanai behind a Forest Ridge house was glassed in and quietly became a family room. A generator, a well pump house and a second panel arrived across three decades and two owners. The property shows beautifully. Then a buyer's title search or a lender's appraiser pulls the permit history on the address, and a project nobody planned starts on a deadline nobody chose.

Davie issues its own permits. The Town of Davie Building Division on Southwest 36th Street takes the Broward County Uniform Building Permit Application, and everything uploads through the town's OAS portal rather than crossing a counter. Status and inspection history stay attached to the folio, which is exactly where a title company looks. Davie also zones for horses and agriculture, so an acreage parcel raises setback, barn and accessory-structure questions a subdivision lot never sees. Broward sits above all of it through the Board of Rules and Appeals, and the whole county is High-Velocity Hurricane Zone, so glass, doors and roofing carry approved products.

Two decades of South Florida work and 150-plus remodels and additions, all of them permitted and inspected, teach you to price the record before you price the job. We list every permit the folio has ever carried, mark what was signed off and what stalled, and hand you that in writing. Where a barn, a guest suite or a well house has to be legalized, we retain the surveyor or engineer whose seal the town will actually accept. Septic capacity and flood elevation get checked early on an acre, because they decide what can be fixed on paper and what needs a machine. Lic. CGC1539072.

Architectural floor plans laid out for a permit submittal — architectural rendering

Where we work in Davie

Long Lake Ranches Long Lake Estates Forest Ridge Imagination Farms Stonebrook Estates Harmony Estates Grand Oaks Estates Riverstone Highland Ranch Estates Rolling Hills Pine Island Ridge Shenandoah Windfield Estates

Elsewhere in Davie? Call us — if it's in Miami-Dade or Broward, we probably build there.

What's included

Files we open, files we close.

Some of this starts as a drawing. Plenty of it starts as a letter from a title company. Both get the same first step: pull the record, then price the fix.

01

Permits open on acreage

The town's permit record read line by line against what is actually standing on the lot, then revived, amended or re-inspected until the town closes the file for good.

02

Work nobody ever filed

Glassed-in lanais, garage bedrooms, barn apartments and panels added off the books: surveyed as built, engineered where the structure needs it, then inspected against today's code.

03

HVHZ openings on paper

Windows, doors, garage doors and roof assemblies matched to a current Florida Product Approval or Notice of Acceptance, and anchored the way that approval actually specifies.

04

Inspections to a signed final

Each phase requested in an order the house can genuinely deliver, with a PGX supervisor on site to meet the inspector, so the last signature actually happens.

05

Septic, well and elevation

Added fixtures cleared with the county health office, well equipment verified, and finished-floor elevation documented before a floodplain question parks your permit in review.

Elevation drawings and plan set for a building permit — architectural rendering

How we work

A remodel is a promise. We keep it in writing.

20+
Years building in South Florida
150+
Remodels and additions delivered
100%
Permitted and inspected work
1
Team accountable from estimate to warranty

AFixed scope, honest pricing

A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.

BA superintendent on site, daily

Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.

CBuilt to code, warrantied in writing

HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.

How it goes

From first walk to final walk-through.

01

Walk-through & estimate

We visit, measure, listen, and come back with a real scope and a real number — not a teaser.

1–2 weeks
02

Design & permits

Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.

4–10 weeks
03

Construction

Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.

Per scope
04

Closeout & warranty

Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.

1–2 weeks

FAQ

Straight answers.

Our closing is coming up and there is an open permit on the house. What now?
Start with the file, not the wall. The address pulled up in the town's permit records shows every permit taken out, every inspection signed, and the point where somebody stopped calling. From there it is a diagnosis. The final may never have been requested. What stands may no longer match what was approved. The permit may belong to a contractor whose license lapsed years ago. Each has a path and none of them is fast, so make the call the day the title report lands, not the week of closing.
What actually needs a permit on a Davie property?
More than owners expect. Structure, roofing, windows and doors, electrical, plumbing, gas or LP, mechanical, pools, decks, fences, driveways and demolition all do, and adding fixtures on a septic property goes through the county health office first. Paint, flooring over a sound slab and a like-for-like swap generally do not. The Davie wrinkle is agricultural: state law exempts genuine nonresidential farm buildings on bona fide farm property, and that exemption is far narrower than owners assume. A barn with an apartment in it is not a farm building.
Does 40-year recertification or a milestone inspection apply to a Davie house?
Not to a house. Broward's building safety inspection program runs through the county Board of Rules and Appeals, keys off building age, and excludes one- and two-family dwellings: every house in Long Lake Ranches, Forest Ridge and the acreage. Florida's milestone inspection and structural integrity reserve study rules reach condominium and cooperative buildings of three habitable stories or more, a far shorter list here. Those reports are sealed by a licensed engineer or architect, not by us. We engage that professional, then permit and build the repairs it calls for.
We enclosed the lanai years ago without a permit. Do we have to tear it out?
Usually not. The normal path is an after-the-fact permit: an as-built survey and drawings, an engineer's evaluation of what is holding the roof up, selective demolition so an inspector can see framing, footings and wiring, then openings brought to current HVHZ approval and the electrical brought to code. Where it gets expensive is a room framed on a patio slab with no footing under it, or a bearing wall opened without a beam. Worth knowing: unpermitted square footage does not appraise, which is why lenders find it before buyers do.
What does it cost to legalize unpermitted work in Davie, and how long?
Both answers are behind the drywall. A permit missing only its final is a small line item. A guest suite framed over a patio slab with nothing engineered under it, or a roof laid with products that were never approved, can mean taking it apart and rebuilding to current code. Permit fees are set by the town and scale with the value of the work. Plan in weeks rather than days, start ahead of a closing date, and expect the number and the bad news in the same written scope.

Contact

Start with what the town has

Give us the address and whatever the town, the title company or a lender mailed you. You get a written path to a closed permit, in English o en español.

Office
Miami, FL
Hours
Mon–Fri, 8:00–18:00
Opens your email app — nothing is stored on this site.