
Permitting & Compliance · Parkland, FL
Permits pulled before anything gets built.
We open the file, document the product approvals, meet every inspector and close the permit out. Parkland houses and acreage properties, filed with the city and cleared with your association, under one general contractor's license, CGC1539072.
Permitting & Compliance in Parkland
What a title search turns up.
Permit calls in Parkland split cleanly in two. Half are planning real work and want the file opened before anything gets built. The other half already have a problem. Most of the housing here went up from the mid-nineties on, so the production homes in Cypress Head, Parkland Isles and Heron Bay are on their second or third owner by now, carrying two decades of small jobs nobody filed. A re-roof with no final inspection. A screen enclosure rebuilt after a storm. A garage converted to a gym. Out on the acreage, a barn that simply appeared.
Parkland issues its own permits. Applications, drawings and inspection requests go through the Building Department inside Development Services at City Hall on University Drive, filed through the city's online permitting portal. Broward then adds the county to the picture: its Board of Rules and Appeals maintains the local amendments layered onto the Florida Building Code, certifies the plans examiner who reads your set and the inspectors who sign it off, and issues the formal interpretations that end arguments. Every opening and roof assembly needs documentation valid in the High-Velocity Hurricane Zone. Taking down a tree needs its own permit.
PGX Builders Group holds the general contractor's license, CGC1539072, so the name on the application is the name that answers for the work. We are not a permit expediting service. Where a submittal needs an architect, an engineer or a surveyor, we retain one and coordinate the set. Review comments get answered once and completely, because a second and third round costs weeks. A supervisor meets the inspector on site. In twenty-plus years here and 150-plus remodels and additions, all permitted and inspected, the expensive problems we have watched owners inherit were rarely structural. They were filing failures, and they sat quietly until someone ran a title search.

Where we work in Parkland
Elsewhere in Parkland? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
Permit work, before and after the fact.
Half of this gets filed before anything is built. The other half is cleanup, usually with a closing date on the calendar. Five jobs, either way.
Open permits before a sale
We pull the full history on the address, work out exactly what each dormant record is still missing, and take it through inspection, revision or a replacement permit.
Work that was never filed
Garage conversions, storm-rebuilt screen enclosures, summer kitchens and acreage outbuildings brought onto the record with as-built drawings, engineering where structure is involved, and an actual inspection.
Approved products, matched anchors
Windows, doors, garage doors and roof assemblies go into review with approval documents matched to the design pressures on that wall, not a generic sheet from a brochure.
Inspections called once
We request each phase when the work is genuinely ready and stand there while the inspector looks, because a failed call sets back every trade queued behind it.
The approvals running alongside
Tree removal permits, your architectural committee packet, and the county reviews that attach to wells, septic systems and lake or drainage easements on the older acreage.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
The title search turned up an open permit from 2007. What now?
Do I need a Broward County permit as well as a Parkland one?
My HOA approved the pergola. Is that the same as a permit?
Does my house need a milestone inspection or recertification?
What does permitting add to the schedule and the cost?
Contact
Open the file before the build
Send the address and the closing date, if you have one. You get the record read back plainly and a written scope to clear it, in English o en español.