Permitting & Compliance · Plantation Acres, FL
The barn that never got a permit.
Permit filing, HVHZ product approvals, inspections run through to a signed final, and the open or unpermitted work sitting on a Plantation Acres property. Filed with the City of Plantation by the licensed contractor doing the job, Lic. CGC1539072.
Permitting & Compliance in Plantation Acres
Three desks, not one.
An acre buys privacy, and privacy is how work gets built without paperwork. In Plantation Acres the pattern repeats itself: an equipment barn behind the house off Old Hiatus Road, a screen enclosure added over the pool in Melaleuca Isles, a carport quietly walled in as a bedroom, a generator pad and propane tank, a second drive cut to the road, jalousies traded for glass over one long weekend. No neighbor sits close enough to notice. Then a title search, an appraiser or an insurance carrier opens the file, and the acre stops being private.
Three desks look at work out here. The Plantation Acres Improvement District normally stamps its approval before an application is accepted, since the canals, culverts and easements it maintains cut through these lots. The City of Plantation's Department of Building Safety then reviews and issues, filed digitally on the uniform building permit application Broward uses countywide. Above both sits the county Board of Rules and Appeals, which maintains the amendments your plans examiner applies, certifies the inspector who walks your job, and rules on disputed code sections. All of Broward is High-Velocity Hurricane Zone, so glass, doors and roofing travel with approved products and their anchor schedules.
We read the record before quoting anything. Twenty-plus years in South Florida and more than 150 permitted, inspected remodels and additions behind us, the first move on a compliance job never changes: pull the address history, walk the property with it in hand, and open up whatever the two disagree about. Where a sealed drawing, a boundary survey or an engineer's letter is required, we hire the professional rather than impersonate one. Septic capacity is a Florida Department of Health in Broward County question, not a guess. The supervisor who ran the work is the one who meets the inspector.

Where we work in Plantation Acres
Elsewhere in Plantation Acres? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
What gets filed, what gets legalized.
Two kinds of job land here: the one you are planning on the acre, and the one a previous owner left behind. Neither gets priced before the file is read.
The permit still showing open
Pulling the full permit history for the address, finding where the sequence stopped, then reviving, amending or re-inspecting until the city marks the file closed.
Work the file never saw
Barns, workshops, screen rooms, enclosed carports and poured slabs that were never filed: surveyed as built, engineered where the structure demands it, then permitted after the fact.
District review before the city
The Plantation Acres Improvement District's approval obtained first, with canal banks and maintenance easements located off a current survey instead of assumed from a plat.
Impact openings and their approvals
Windows, doors and roof assemblies matched to products approved for the High-Velocity Hurricane Zone and installed with the anchor schedule that approval actually specifies.
Inspections nobody has to repeat
Each phase called when the house is genuinely ready, a PGX supervisor on site to meet the inspector, and the final signed rather than left pending.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
We are refinancing and an old permit still shows open. Where do we start?
Who issues the permit here, and does the improvement district really come first?
There is a barn and a screened room out back that nobody permitted. Can they be legalized?
Does 40 or 50-year recertification or a milestone inspection apply to our house?
What does it cost to legalize a barn or an addition nobody permitted?
Contact
Send us the address and the survey
We will read what the city and the district hold on file, then put in writing what closing it out actually takes, in English o en español.