
Bathroom Remodeling · Plantation Acres, FL
Primary suites carved out of spare rooms.
Guest baths and primary suites throughout Plantation Acres: freestanding tubs, frameless glass, stone, and waterproofing proved with a flood test. Permitted by the City of Plantation and run by a licensed, insured contractor with a supervisor on site.
Bathroom Remodeling in Plantation Acres
Four bathrooms, none of them right.
A 1978 house in Plantation Acres often has four bathrooms and no primary suite. The arithmetic was different then: a compartment toilet, a fiberglass tub-shower, a four-foot vanity, and a closet sized for a coat rack. What owners in Melaleuca Isles, Plantation Acres Estates and the older sections along NW 118th Avenue do now is annex the adjoining bedroom or an oversized hall closet, build one genuine suite, and then bring the guest baths up to the same standard so the house reads as one house instead of four decades.
Bathroom permits come from the City of Plantation, and the plumbing, electrical and mechanical inspections happen before anything gets closed in. The Acres adds two considerations most Broward neighborhoods skip entirely. Where a home runs on an onsite septic system rather than city sewer, increasing fixture count gets reviewed by the Florida Department of Health in Broward County, which handles septic permitting and inspection here. And any new or enlarged bathroom window needs an HVHZ product approval, since Broward sits inside the High-Velocity Hurricane Zone.
No room punishes shortcuts faster, so we build it in the right order and prove the parts nobody will ever see. Pans get filled and left to sit overnight before a single tile is set. Slopes are checked with a level. Heavy glass hangs on blocking installed while the wall was open, not on a hope and a toggle bolt. The scope is written and signed, a PGX supervisor is here every working day, and the route from your front door to the work gets covered. Insured, and licensed as CGC1539072, with every project on this list permitted and inspected.

Where we work in Plantation Acres
Elsewhere in Plantation Acres? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
The bath scope, itemized.
Written down before the tile is ordered, because a change made after the waterproofing goes in is not a change. It is a redo.
Suite made from two rooms
Combining a bedroom, a hall bath and closet space into one primary suite, with layout, rough-ins and permit drawings handled as a single package.
Showers on a slab
Recessed pans and linear drains cut into slab-on-grade where structure allows, water-tested before tile, and a shallow curb where the slab honestly will not cooperate.
Freestanding tubs, supported
Tub placement checked against floor structure and drain location first, then stone and tile surfaces sealed to survive daily use in Broward humidity.
Old pipe, gone for good
Replacing galvanized supply and tired cast iron while the walls stand open, which is the only moment in this house's life when it is cheap.
Layered light, real exhaust
Bigger rooms need bigger fans, so we size them and duct them out through the roof, then light the mirror from both sides instead of overhead.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Does a new bathroom mean a bigger drainfield?
Do bathroom remodels in Plantation need permits?
Can I get a curbless shower in a 1970s slab house?
How long will we be without the primary bath?
What does a high-end primary bath cost?
Contact
Pick a bathroom, any bathroom
Point at the room that annoys you every single morning. We will scope it honestly and quote it in writing, in English o en español.