
Bathroom Remodeling · Weston, FL
Membranes tested before the marble.
Primary suites, frameless showers and freestanding tubs across Weston, with waterproofing that gets flood-tested before tile is ordered. Fully permitted and inspected, licensed and insured, supervised daily by the people who wrote the scope.
Bathroom Remodeling in Weston
The garden tub era is over.
Almost every primary bath built in Weston Hills, The Lakes or The Isles at Weston between 1990 and 2005 is the same room wearing different tile: a soaking tub sunk into a deck beneath a glass block window, a cramped separate shower with a molded pan, a cultured marble top carrying two oval bowls, and a closet-sized compartment for the toilet. It was a sensible plan in 1994. Today the tub deck is the first thing owners in Weston want gone, followed closely by the shower and the storage.
Weston's Building Code and Permitting Services Department permits the work, with plumbing, electrical and mechanical inspections at rough and again at final. Broward building departments work from one set of code amendments administered by the Board of Rules and Appeals, which also certifies the inspectors who show up at your rough-in. Owners in the Bonaventure condominiums and the country club villas have a second calendar to watch: Broward's Building Safety Inspection Program, which the Board administers, starts once a building reaches the age county policy sets for its location and then repeats on a fixed cycle, and it is the association's obligation rather than any individual owner's.
Tolerances in this room are tighter than anywhere else on the job. We flood-test pans and let them sit, slope to the drain rather than toward it, block walls before heavy glass is ordered, and vent to the outside instead of into an attic. Weston clients get a fixed written scope, daily supervision, protected pathways from the front door to the work zone, and crews who sign in at the gate and leave the street clean. Licensed and insured, Lic. CGC1539072.

Where we work in Weston
Elsewhere in Weston? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
The pieces of a bath rebuild.
From a powder room to a full primary suite, the specification is settled before tile is ordered. The usual components follow.
Losing the tub deck
Demolishing the tiled platform, rerouting the drain and supply, and reclaiming the floor area for a freestanding tub, a wider shower or actual storage.
Showers rebuilt and tested
Sloped pans, bonded membranes flood-tested and held before tile, linear drains where they help, and benches and niches framed rather than carved in later.
Vanities and real storage
Custom vanities sized to the wall instead of the catalog, drawer banks that hold what a bathroom actually holds, and stone tops with undermount bowls.
Glass block and daylight
Replacing dated glass block with impact-rated units or obscured glazing, which changes both the light in the room and the elevation your association reviews.
Ventilation and moisture control
Quiet fans ducted through the roof rather than into the attic, moisture-rated fixtures, and heavy glass hung on solid blocking installed while walls are open.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Our shower has leaked once already. What did the original build get wrong?
Can the garden tub go and the shower take the whole wall?
Which parts of a bath remodel actually need a permit?
Our building is due for its safety inspection. Does that stop our unit remodel?
What should a primary bath at this level cost?
Contact
Time the garden tub went
Show us the room and tell us what fails at seven in the morning. You get a scoped, fixed written estimate, in English o en español.