
Home Additions · Weston, FL
Room to grow inside the plat.
Rear extensions, second stories, patio enclosures and in-law suites for Weston homes, engineered and permitted through the city, cleared with your association first, and built by a licensed general contractor under a fixed written scope.
Home Additions in Weston
Setbacks, easements and the lake behind you.
Additions in Weston begin with a survey rather than a sketch, because these lots were platted, not inherited. Homes in Savanna, The Ridges and Country Isles sit on tightly drawn parcels with side setbacks measured in single-digit feet and rear yards that end at a lake bank or a drainage easement. Estates in Windmill Ranch Estates and parts of Weston Hills have genuine room to move. The projects are the same either way: enclose the screened patio, push the family room back, build over the garage, or add a proper suite for a parent.
An addition draws the full review. The association sees elevations first, then the plan set goes to Weston's Building Code and Permitting Services Department, with the city's engineering and planning divisions involved when drainage, driveways or zoning setbacks come into play. Expect sealed structural drawings for footings and tie beams, HVHZ product approvals for every new opening, and a current survey showing easements most owners have never looked at. If a tree stands in the footprint, removal or relocation needs a city landscape permit, and that includes trees on association ground.
A builder's habits become permanent the day an addition is poured. We tie new footings to existing ones the way the engineer drew it, match stucco texture and roof tile so the seam stops announcing itself after a year, and keep the occupied half of the house sealed and livable while the new half goes up. The scope is fixed in writing before the first excavation, the site has a supervisor every working day, and the same team carries the job from feasibility to warranty.

Where we work in Weston
Elsewhere in Weston? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
Five kinds of Weston addition.
Every addition begins with a survey, an engineer and a look at the covenants. These are the five shapes Weston additions usually take.
Pushing into the platted yard
New living space built to the edge of the platted envelope, with footings, beams and the roof joint engineered as one package.
Second stories over the garage
Upper floors added where the existing footings and block walls check out, designed to sit inside the roof language your association already approved once.
Screened patio to conditioned room
Turning the cage into real interior space with impact glazing, insulation, mechanical extensions and a permitted roof, so the square footage counts at appraisal.
Quarters for long-stay family
Independent suites with bath, closet and kitchenette for long-stay family, built to code and detailed to read as original rather than attached.
Footings, tie beams and trusses
Underpinning, new footings, reinforced tie beams and truss modifications: the half of the budget nobody sees and the half that decides whether it lasts.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Can I turn the screened patio into a real room?
Will my association approve an addition at all?
How close to the lake or the golf course can I build?
Can a Weston house take a second story?
How long does an addition take end to end?
Contact
Bring the survey, we will bring questions
Twenty minutes on site tells us more than a week of guessing. Feasibility, setbacks and an honest range, in English o en español.