Home Additions · Plantation Acres, FL
Additions the lot can actually take.
Rear extensions, second stories, guest houses and garage conversions in Plantation Acres, engineered for the lot, coordinated with septic and drainage, permitted by the City of Plantation, with a licensed contractor and a daily supervisor.
Home Additions in Plantation Acres
An acre is not automatically buildable.
Additions make more sense in Plantation Acres than almost anywhere else in Broward, because the land is already yours. A seventies ranch on a one-acre parcel off Old Hiatus Road can take a rear great room, a detached guest house or a second floor without crowding a thing. The briefs repeat themselves: a primary wing with its own entrance, an in-law suite for parents moving down from the north, a garage bay long enough for the boat, and studios or workshops the original builder never contemplated.
The City of Plantation permits the work, but an addition here involves more than a permit application. Parts of the Acres carry the city's rural estate zoning, which is why horses and outbuildings are contemplated at all and why setbacks and lot coverage behave differently than in a platted subdivision. The Plantation Acres Improvement District maintains the canals, culverts and pump stations draining roughly 2,000 acres out here, reviews permits ahead of the city, and holds easements along its banks that a footprint has to respect. Add tree removal permits and, on septic properties, drainfield location, and the site plan matters as much as the floor plan.
The half of an addition budget nobody photographs is the half we care most about: footings tied into a forty-year-old foundation, tie-beams and truss connections that satisfy Broward's amendments to the Florida Building Code, and a roof tie-in that will not telegraph a seam in five years. More than 150 remodels and additions built over two decades in South Florida, none of them without a permit. A written scope you sign, one supervisor who does not rotate off, and the same team answering for the job from the first sketch through the final inspection.

Where we work in Plantation Acres
Elsewhere in Plantation Acres? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
How these houses gain rooms.
Every addition starts with a survey, an engineer and a hard look at where the drainfield and the easements sit. Then we draw.
Rear wings and great rooms
Family rooms and primary suites pushed out into the yard, with the footings, tie-beams and roof connection detailed by an engineer and permitted in a single set.
Upper floors on old walls
The existing block walls and footings get evaluated before anything else, then an upper level is designed to the loads Broward's code amendments actually require.
A separate guest house
Separate suites and casitas the rural estate zoning here can accommodate, with utilities, septic capacity and setbacks confirmed before anyone draws an elevation.
Garages, barns and workshops
Deep garages, equipment barns and workshops built on acreage, engineered for wind load and detailed so they look intentional from the road rather than improvised.
Foundations and underpinning
New footings, steel, filled cells and tie-beam work: nobody photographs any of it, and it decides whether the addition ages with the house or against it.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Can I build a detached guest house on my Plantation Acres lot?
How does the Plantation Acres Improvement District affect my addition?
Will an addition force us onto a bigger septic system?
How long will the whole process take?
Should we add on, or just buy something bigger?
Contact
Let's see if the lot allows it
Send over the survey and whatever you have in mind. Zoning, septic, drainage and real numbers get settled before anyone draws, in English o en español.