
Home Additions · Coral Springs, FL
More square footage, same street.
Coral Springs houses grow four ways: out the back, up a floor, into the garage, or into a self-contained in-law suite. Engineered to Broward code, permitted through the city Building Department, supervised daily by a licensed general contractor.
Home Additions in Coral Springs
Building out when the city is built out.
Coral Springs stopped producing new residential lots in 2003, which changed the arithmetic for anyone who likes their street. Families in Kensington, Cypress Run and Shadow Wood who need a fourth bedroom, a working office or somewhere for a parent to live are extending instead of moving. The projects repeat: a rear family room and primary suite behind a 1970s ranch, a second story over a single-level house on a lot with nowhere left to go sideways, a garage converted into legal conditioned space. Setbacks and lot coverage decide which one you get.
An addition is the most reviewed thing you can build here. Community Development checks setbacks, lot coverage and any variance need before the Coral Springs Building Department reviews structure, and a current survey plus sealed engineering is not optional. Foundations, tie-beams and roof tie-ins get designed rather than assumed. Every new window and door carries a High-Velocity Hurricane Zone product approval, since Broward sits inside the HVHZ, and the county Board of Rules and Appeals is the authority that settles a code interpretation when a reviewer and an engineer read the same section differently. Gated communities stack architectural review on top.
The hard part of an addition is the seam. Matching a stucco texture floated in 1978, tying a new roof plane into old trusses, blending a tile profile nobody manufactures anymore: that is where additions either announce themselves or disappear. We keep the occupied half of the house livable while the new half goes up, with dust walls, mechanical continuity and a supervisor on site daily. Scope fixed in writing before the first footing is dug. More than 150 remodels and additions delivered across South Florida, all of them permitted and inspected.

Where we work in Coral Springs
Elsewhere in Coral Springs? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
Where the new square footage goes.
Every addition begins with a survey, an engineer and a clear read on setbacks. Below are the five shapes that come up most across Coral Springs.
Growing out the back
Family rooms, primary suites and enlarged kitchens added at the back on new footings, with tie-beam and roof joint drawn as a single package.
Second stories
The existing footings and block are load-checked before anything is drawn, then a full upper floor goes on with stair, mechanical risers and a matched roofline.
Garage conversions done legally
Turning a two-car garage into conditioned space with insulation, air conditioning, HVHZ-rated openings and parking resolved, so the square footage counts at resale.
Quarters for a parent
Independent bedroom, bath and kitchenette space for long-stay family, built to code and scaled so it reads as part of the house rather than an attachment.
Structural work below grade
Footings sized to the soil conditions, dowelling into existing foundations, and column work engineered before anyone puts a price on a finish.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
How much of my lot can I actually build on?
Can my single-story house take a second floor?
Does my HOA get a say in an addition?
Does an addition mean re-roofing the whole house?
Should we add on or move up to a bigger house?
Contact
Let's find the square footage
Send the survey and tell us what the house is missing. You will hear about feasibility, the review path and the real number, in English o en español.