
Bathroom Remodeling · Coral Springs, FL
Primary suites, properly sealed.
Primary suites, guest baths and powder rooms across Coral Springs, with frameless glass, stone, freestanding tubs and membranes that get flood-tested before tile. Permitted through the city Building Department and inspected at every rough.
Bathroom Remodeling in Coral Springs
Where the 1970s bathroom ends.
Ask a Coral Springs homeowner what bothers them and the bathroom answer arrives quickly. The city's original stock in Forest Hills, Maplewood and Ramblewood came with a hall bath and a modest primary, both planned around a sixty-inch tub and a single vanity. Even the roomier 1990s houses in Turtle Run and Wyndham Lakes handed you square footage without handing you a shower you would choose on purpose. Bathroom remodeling here is therefore a redistribution project: annexing a closet, shifting a doorway, and building the suite the plan never contained.
Permits come from the City of Coral Springs Building Department, and the inspection sequence of plumbing rough, electrical rough, then close-in is precisely why a properly built bath outlasts a cosmetic one. Adding or enlarging a window pulls in zoning review from Community Development, and any new exterior glazing carries a High-Velocity Hurricane Zone approval because Broward is inside the HVHZ. Behind the walls, expect what the era handed you: cast iron or early plastic drains, copper or polybutylene supply on some houses, and slabs poured with no thought of a curbless entry.
A bathroom is the least forgiving room in a house and the easiest one to get quietly wrong. Membranes get flood-tested and held before a single tile is set. Slopes are verified with a level, heavy glass hangs on blocking installed while the walls were open, and niches get framed where you will actually reach for them. Every finished surface between the front door and the work zone is protected, because the rest of your house is not a job site. Fixed written scope, daily supervision, inspections signed off in order.

Where we work in Coral Springs
Elsewhere in Coral Springs? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
What we rebuild behind the tile.
Nothing gets ordered until the written scope is agreed, whether it is a powder room or a full suite. These are the pieces that decide whether it lasts.
Borrowing a closet
Absorbing an adjacent closet or hallway to build a genuine primary suite, with framing, door relocation and plumbing rough-ins drawn and permitted as one job.
Pans filled and held
Membrane pans filled and held before any tile goes down, with linear or point drains set to a slope we measure rather than estimate by eye.
Curbless entries where possible
Recessing the pan into a slab or dropping second-floor framing when the structure allows, and saying plainly when a low curb is the better answer.
Repiping while it is open
Replacing aging supply and drain lines during the same demolition, which is the only moment in a house's life when that work is genuinely inexpensive.
Ventilation and layered light
A fan sized to the room and vented past the soffit, plus sconces at mirror height so nobody shaves under a single downlight.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Can I skip the permit if we are only replacing fixtures?
How do I know if my house has polybutylene supply lines?
Will the city or my HOA care what I do inside a bathroom?
Can two bathrooms be remodeled at the same time?
What actually drives the price of a primary bath?
Contact
Show us the 1978 bathroom
Fifteen minutes in the room tells us more than an hour of photographs. Book a walk-through and get a real scope, in English o en español.