
Bathroom Remodeling · Southwest Ranches, FL
Baths built for well water and stone.
Primary suites, frameless showers and freestanding tubs for Southwest Ranches homes, with flood-tested waterproofing and a clear read on what your septic system can carry. Inspected and supervised daily by a licensed general contractor, Lic. CGC1539072.
Bathroom Remodeling in Southwest Ranches
Two baths for a five-bedroom ranch.
The math never worked. A 1980s ranch on two acres in Sunshine Ranches or Santa Fe Estates typically came with a compartmentalized primary bath, a tub nobody has filled in twenty years, and a hall bath doing far too much work. Owners here fix it by taking territory: annexing a bedroom or the outsized closet, building a wet room with a freestanding tub and a walk-in shower, then adding a proper pool bath so wet feet stop crossing the marble. On acreage, there is usually room to do it right.
Bath permits come from the Town of Southwest Ranches, with plumbing, electrical and mechanical inspections before tile hides anything. The part that catches people is downstream: most of the town runs on onsite septic rather than sewer, so adding fixtures can push a system past its permitted load and require review by the Florida Department of Health in Broward County, which also handles the well. If the scope touches an exterior wall or a new window, HVHZ product approvals apply, because Broward sits inside the High-Velocity Hurricane Zone.
Everything expensive in a bathroom sits on top of something invisible. Membranes get flood-tested before tile, slopes get verified with a level, blocking goes in behind every grab bar and glass panel, and exhaust gets ducted outside rather than into the attic. Slab work goes to fabricators who have been cutting book-matched stone for decades. You get the scope in writing, daily supervision, and protected pathways from the front door to the work zone, because a bathroom project should not redecorate the rest of the house.

Where we work in Southwest Ranches
Elsewhere in Southwest Ranches? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
What a Ranches bath remodel includes.
Nothing gets ordered until the drawing and the specification agree. Below are the elements that repeat across acreage bathrooms in this town.
Taking the adjacent bedroom
Turning a spare bedroom or an oversized closet into the suite the original plan never allowed, with framing, rough-in and drawings resolved before demolition.
Wet rooms and curbless entries
Recessed pans cut into slab where the structure allows, linear drains, and heavy glass anchored to real blocking so nothing shifts in year three.
Waterproofing you never see
Bonded membranes, sealed corners and a flood test held overnight before tile, since the only cheap time to catch a leak is now.
Fixture count and septic
A straight answer on whether new fixtures exceed what your onsite system was permitted for, and coordination of any Health Department review that follows.
Stone that survives the water
Marble and quartzite sealed for a hard-water house, with fixtures and finishes chosen so mineral staining does not become the room's main feature.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Can our septic handle another bathroom?
Do I need a permit for a bathroom remodel here?
Our well water leaves orange stains. Can that be solved before we tile?
Can we live in the house while the primary bath is rebuilt?
What does a primary suite bath cost at this level?
Contact
Take us to the primary bath
Tell us which room you avoid and why. We will measure, check the septic paperwork, and put a number on it, in English o en español.