Architectural floor plans and permit drawings — permitting & compliance in Southwest Ranches, Florida. Architectural rendering.

Permitting & Compliance · Southwest Ranches, FL

Private acre, public record.

Permit filing, HVHZ product approvals, inspections carried to a signed final, and the open or expired permits a prior owner left on a Southwest Ranches property. Filed with the Town by the licensed contractor on the job, Lic. CGC1539072.

Licensed & insured Lic. CGC1539072 Southwest Ranches · Broward County Hablamos español

Permitting & Compliance in Southwest Ranches

The desk on Griffin Road.

Most compliance calls out here start with a document nobody read until closing week. A title company runs the address, and the Town's file comes back with a permit still showing open, or a building on the survey the record has never heard of. The pattern repeats across Sunshine Ranches, Green Meadows and Country Estates: a pole barn finished into an office, a carport walled in as a bedroom, a generator on a new pad, a propane tank buried by whoever was cheapest that month. Code officers here work from complaints rather than patrols, so behind a fence none of it gets noticed for years.

Permits come from the Town of Southwest Ranches, whose building department at Town Hall on Griffin Road is staffed by CAP Government, and zoning review happens in the same building first. Filing is electronic, on the Broward County Uniform Building Permit Application, with a Notice of Commencement where one is required; county items like environmental review or an asbestos certificate move through Broward's ePermitsOneStop. Over all of it sits the county Board of Rules and Appeals, which you never file with directly: it maintains the amendments your plans examiner applies and certifies your inspector. All of Broward is High-Velocity Hurricane Zone, so openings and roofing need approved products.

Compliance work starts with reading, not demolition. We ask the Town's portal what was ever pulled on the address, set it against a current survey and what is standing, and price the gap. Where the answer needs a sealed drawing or a structural evaluation, we bring in the engineer or surveyor and coordinate them; PGX is the licensed general contractor on the permit, not a substitute for those seals. Septic capacity is a health department question, not a guess. Inspections are met on site by the supervisor who ran the work. Twenty-plus years in South Florida, more than 150 permitted and inspected projects, and nothing sold as a shortcut.

Architectural floor plans laid out for a permit submittal — architectural rendering

Where we work in Southwest Ranches

Sunshine Ranches Rolling Oaks Green Meadows Country Estates Ivanhoe Estates Landmark Ranch Estates Sterling Ranch Estates Santa Fe Estates Stone Creek at Sunshine Ranches Akai Estates Holatee Trail Appaloosa Trail Melaleuca Road

Elsewhere in Southwest Ranches? Call us — if it's in Miami-Dade or Broward, we probably build there.

What's included

The permit work an acre needs.

Some of this is filing a new job properly from the first drawing. The rest is cleaning up after somebody who did not. Both start with the record.

01

Files that never closed

Reading every permit ever pulled on the address, finding where the sequence stopped, then reviving, revising or re-inspecting it until the Town marks the record complete.

02

Legalizing what already stands

Barns, tack rooms, enclosed carports and converted garages documented as built, engineered where the structure demands it, then permitted and inspected against the code in force today.

03

Openings that carry approvals

Windows, doors and roof assemblies matched to products approved for the High-Velocity Hurricane Zone, installed to the anchor schedule the approval specifies and documented for the inspector.

04

Called, met and signed

Each phase requested from the Town's inspection desk when the house is genuinely ready, met on site by your supervisor, and carried through to a signed final.

05

Generators, propane and septic

The standby generator, buried tank, water treatment and septic modification that so often went in quietly, brought back onto a permit with the health department steps included.

Elevation drawings and plan set for a building permit — architectural rendering

How we work

A remodel is a promise. We keep it in writing.

20+
Years building in South Florida
150+
Remodels and additions delivered
100%
Permitted and inspected work
1
Team accountable from estimate to warranty

AFixed scope, honest pricing

A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.

BA superintendent on site, daily

Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.

CBuilt to code, warrantied in writing

HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.

How it goes

From first walk to final walk-through.

01

Walk-through & estimate

We visit, measure, listen, and come back with a real scope and a real number — not a teaser.

1–2 weeks
02

Design & permits

Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.

4–10 weeks
03

Construction

Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.

Per scope
04

Closeout & warranty

Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.

1–2 weeks

FAQ

Straight answers.

Title found an open permit on our property and we close next month. What now?
Read the Town's file before guessing at it. The address history shows what was pulled, which inspections were signed, and where it stopped. From there it is usually one of three things: the work is sound and the final was never called, what stands does not match the approved drawings, or the permit is still in the name of a contractor who is long gone, which the Town handles through a change of contractor filing. None of the three is a weekend, so call weeks ahead of your closing date.
Who issues permits in Southwest Ranches, and how do inspections get requested?
The Town does. Building permitting and inspection services are provided by CAP Government from Town Hall on Griffin Road, and zoning sits in the same building, so a fence, a driveway, a pool or a detached ancillary building clears zoning review before the building permit issues. Applications and plans are uploaded to the Town's online portal on Broward's uniform application. Inspections are requested by email to the Town's inspection desk, and the last one signed is what allows a certificate of completion or occupancy.
What actually needs a permit on a property like ours?
More than most owners assume. Roofing, windows and doors, electrical service and panels, generators and propane lines, water heaters, air conditioning change-outs, structural work, pools and decks, fences and walls, driveways, demolition and detached ancillary buildings all do, and taking down a protected tree needs its own approval from the Town plus a Broward County license. Paint, flooring over a sound slab and a like-for-like fixture swap generally do not. What tends to go unfiled out here is exactly what a buyer's inspector notices first.
Does 40 or 50-year recertification or a milestone inspection apply to us?
Almost certainly not. Broward runs its building safety inspection program through the county Board of Rules and Appeals; it triggers on the age of a building and exempts one- and two-family homes, which is essentially every roof in this town. Florida's milestone inspection and structural integrity reserve study rules reach condominium and cooperative buildings of three habitable stories or more, and that is not the housing stock here. If you own a unit in one elsewhere in Broward, those repairs are work we permit and build.
What does it cost to legalize work that was never permitted?
It turns on what sits behind the finish, so we open things up before putting a number on it. Sound construction that simply never had its final called is a small line and some waiting. A slab poured without engineering under a converted barn, or a bearing wall opened without a beam, can mean undoing part of it and rebuilding to today's code. The Town sets its own fees and they follow the value of the work, so they ride in the estimate as an allowance rather than a surprise.

Contact

Before the title company finds it

Send the address or the permit number. You get a written read of what is still open and what closing it takes, in English o en español.

Office
Miami, FL
Hours
Mon–Fri, 8:00–18:00
Opens your email app — nothing is stored on this site.