
Kitchen Remodeling · Southwest Ranches, FL
A kitchen that fits the property.
Custom cabinetry, stone counters and real layout changes for Southwest Ranches kitchens, including the well-water treatment and propane work nobody mentions. Permitted through the Town and supervised daily by a licensed general contractor.
Kitchen Remodeling in Southwest Ranches
The kitchen at the end of the driveway.
Estate kitchens in Southwest Ranches were mostly drawn for a different life. The 1970s and 80s ranch houses across Green Meadows, Country Estates and Rolling Oaks came with a galley tucked behind a wall, one wall oven, and a pantry the size of a coat closet, inside a house clearly built to host. So the projects here run large: absorb the adjoining den, set a long island, add a scullery and a second dishwasher, and build the cold storage a family who shops once a week actually needs.
Nothing here is exempt: plumbing, gas, electrical and usually structure mean a permit from the Town of Southwest Ranches and inspections along the way, submitted electronically like everything else here. Interior-only work skips site-plan review; move an exterior wall or add a window and zoning looks first. Two local wrinkles: any new opening needs a High-Velocity Hurricane Zone product approval, since Broward is in the HVHZ alongside Miami-Dade, and adding a second dishwasher or a disposal on a septic property deserves a look at the system's permitted capacity.
Cabinet packages and stone slabs do not enjoy a mile of two-lane road and a gravel drive, so delivery and staging get planned like part of the build. We template stone after cabinets are set, never before. Selections are locked into a fixed written scope, a supervisor is on site every day, and the rest of the house stays sealed off and clean while the kitchen is open. Licensed and insured under Lic. CGC1539072, with 150-plus remodels and additions delivered across South Florida, all of them permitted.

Where we work in Southwest Ranches
Elsewhere in Southwest Ranches? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
A Ranches kitchen, itemized.
Every line is drawn and priced before a cabinet leaves the wall. These are the items that show up most in acreage kitchens west of Flamingo Road.
Cabinet runs made to fit
Built-to-order cabinet runs finished for Florida humidity, scaled to the walls and ceiling heights you actually have instead of chopped into stock boxes.
Islands built for slab weight
Quartzite, marble or granite templated in place, over framing built for the slab weight and for overhangs people will genuinely sit on.
Walls out, beams in
Removing the wall between kitchen and living space, with the beam, columns and sealed engineering the Town will want to see before demolition.
Propane, hoods and venting
Ranges fed from a buried propane tank where there is no gas main, with makeup air and hood runs sized properly rather than symbolically.
Water worth drinking
Filtration, softening and reverse osmosis at the sink and the ice maker, because well water and a new stone counter are not natural allies.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Is a permit required for a kitchen out here?
We are on a well. Will the water damage a new kitchen?
Can I have a gas range if there is no gas line to my house?
How long will a custom kitchen take?
Where does a Ranches kitchen budget actually go?
Contact
Bring us the kitchen problem
Show us the room, the appliance list and the way you actually cook. You get a written specification and a price that holds, in English o en español.