Renovated kitchen with marble island and custom cabinetry — kitchen remodeling in Weston, Florida. Architectural rendering.

Kitchen Remodeling · Weston, FL

Your kitchen, off the builder's menu.

Custom cabinetry, stone counters and layout changes for Weston kitchens built between 1985 and 2005. Permitted through the city, inspected at every stage, and run by one supervisor who is on site every working day.

Licensed & insured Lic. CGC1539072 Weston · Broward County Hablamos español

Kitchen Remodeling in Weston

Where the 1990s kitchen finally ends.

Weston kitchens fail in remarkably similar ways, because so many were framed by the same builders inside a fifteen-year window. Walk through Savanna, The Falls, Country Isles or The Meadows and the plan repeats: a soffit hanging over the wall cabinets, a peninsula standing where an island belongs, a desk nook nobody has used since laptops arrived, and a pass-through cut into the family room wall. Most of these rooms were refinished once, somewhere around 2006, in granite. What owners want now is the room reorganized, not resurfaced again.

Kitchens pull in plumbing, electrical, mechanical and frequently structure, so the work is permitted through Weston's Building Code and Permitting Services Department and inspected as it goes. Drawings upload to the city ePermits portal, digitally signed and sealed, with file names matching the city convention, since a misnamed file gets a submittal rejected before a reviewer opens it. Florida's new exemption for small residential work is no help here either: electrical, plumbing, mechanical, gas and structural scopes are all carved out of it. Exterior venting or a new window goes to your association as well.

Square cabinets come from a build order nobody rushes. Cabinets are ordered against verified field dimensions, stone is templated after the boxes are set rather than before, and appliances are confirmed by model number before a filler strip is cut. Weston clients get a fixed written scope, one supervisor who is on site daily and answers the phone, and dust containment that treats the rest of the house as the finished work it is. Twenty-plus years of South Florida construction stands behind that.

Marble backsplash and brass fittings in a renovated kitchen — architectural rendering

Where we work in Weston

Weston Hills Country Club Windmill Ranch Estates The Ridges Savanna The Isles at Weston The Lakes Emerald Estates The Falls Country Isles Bonaventure Botaniko Weston Indian Trace The Meadows

Elsewhere in Weston? Call us — if it's in Miami-Dade or Broward, we probably build there.

What's included

Inside a Weston kitchen rebuild.

Cabinetry and stone set the schedule; the rest is sequencing. Five elements we handle on almost every Weston kitchen.

01

Cabinetry off the builder's menu

Cabinet packages ordered to verified field dimensions and finished for Florida humidity, running to the ceiling instead of stopping under a soffit nobody ever wanted.

02

Soffits, peninsulas and walls

Demolishing the soffit, retiring the peninsula, and where a wall carries load, replacing it with an engineered beam under a permitted structural drawing.

03

Stone islands, templated late

Quartzite, marble or porcelain templated once the cabinets are set, with island framing built for slab weight and any seated overhang carried properly.

04

Appliances that move

Relocating range, hood, refrigeration and dishwasher to where the plan actually wants them, with new circuits, water lines and exterior venting permitted and inspected.

05

Power the panel can carry

Dedicated circuits, panel capacity checked before an induction range or double oven is specified, and a layered lighting plan on controls that make sense.

Stone island and seating in a remodelled kitchen — architectural rendering

How we work

A remodel is a promise. We keep it in writing.

20+
Years building in South Florida
150+
Remodels and additions delivered
100%
Permitted and inspected work
1
Team accountable from estimate to warranty

AFixed scope, honest pricing

A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.

BA superintendent on site, daily

Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.

CBuilt to code, warrantied in writing

HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.

How it goes

From first walk to final walk-through.

01

Walk-through & estimate

We visit, measure, listen, and come back with a real scope and a real number — not a teaser.

1–2 weeks
02

Design & permits

Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.

4–10 weeks
03

Construction

Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.

Per scope
04

Closeout & warranty

Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.

1–2 weeks

FAQ

Straight answers.

Florida exempted small jobs from permits. Does that cover my kitchen?
No. The exemption that took effect on July 1, 2026 applies to single-family work valued under $7,500, and it specifically carves out electrical, plumbing, mechanical, gas and structural work, plus anything on property inside a flood hazard area. A kitchen touches most of that list on day one. The law also forbids splitting a project into pieces to slip under the threshold, and a building department can still ask you to document that the work qualifies. Wrong hill for a kitchen.
Does the association need to see an interior kitchen?
The room itself, rarely. The logistics, always. Most Weston communities want the contractor registered at the gate, work confined to posted hours, dumpsters and material staging handled a particular way, and vehicles parked where they will not generate a complaint by lunchtime. If your scope adds a hood vent through an exterior wall or enlarges the window over the sink, that becomes an exterior change and goes to architectural review with the rest of the elevations.
How long will we be eating takeout?
Custom cabinetry sets the clock. Quality packages take months to build, so we order early and leave your existing kitchen working while they are fabricated. On-site construction commonly runs a couple of months for a straightforward layout, longer when walls move, gas is added or the panel gets replaced. Before anything is demolished we set up a temporary kitchen somewhere sensible, which is the difference between an inconvenience and a grievance.
Can the wall between the kitchen and family room come out?
Often yes, and never on a hallway guess. In most Weston houses the exterior shell is concrete block while interior partitions are framed, which makes many of them non-bearing, but roof trusses and point loads do not care about probability. We open a small inspection, have an engineer look at what is actually up there, and if the wall carries load we detail a beam, seal the drawing and permit it.
What moves the number most on a Weston kitchen?
Cabinetry first, then stone, then appliances, and after that the items nobody photographs: relocating plumbing, adding circuits, replacing a panel, venting a hood through block. Two kitchens with identical footprints can land far apart depending on whether the layout stays put. We scope after a site visit and quote against a specification rather than a square-foot guess, because a per-foot number tells you nothing about what is behind the wall.

Contact

Start with the kitchen

Send photos and a plan, tell us what the room gets wrong, and we will come measure. Real numbers, in English o en español.

Office
Miami, FL
Hours
Mon–Fri, 8:00–18:00
Opens your email app — nothing is stored on this site.