
Permitting & Compliance · Weston, FL
HOA approval is not a permit.
Permits filed, HVHZ product approvals documented, inspections met on site, and the open or expired records that stall a Weston closing driven shut through the city's Building Code and Permitting Services Department. Licensed general contractor, Lic. CGC1539072.
Permitting & Compliance in Weston
Two approvals, and only one is a permit.
Weston is too young for the century-old mysteries that haunt older Broward addresses, and that lulls people. The houses here date from the mid-1980s through the 2000s, so the original paperwork is usually clean and the trouble arrived afterward. Roofs replaced across Emerald Estates and Country Isles following the 2005 hurricane season. Accordion shutters and impact glass swapped into openings in The Ridges. Pool cages, summer kitchens, paver driveways, water heaters and standby generators changed out by whoever was available that month. Second-generation work on a first-generation house is where the Weston record goes quiet.
Filing is a City of Weston matter. The Building Code and Permitting Services Department reviews and issues, submittals go in electronically and digitally signed and sealed, and whoever pulls the permit owns it until it closes. Above the city sits the county's code administration. The Broward County Board of Rules and Appeals adopts the county's amendments to the Florida Building Code, certifies the plans examiners and inspectors who will read your file, hears appeals of a code official's decision, and issues formal interpretations when a section is genuinely disputed. Broward is High-Velocity Hurricane Zone territory, so glass, doors and roofing carry HVHZ product approvals.
Every permit we file carries our license number, CGC1539072, which is what separates a general contractor from a filing service: the signature and the accountability arrive together. We read the address history before promising anything, engage the engineer, architect or surveyor a complete submittal genuinely requires, clear plan review comments in one round rather than three, and put a supervisor on site when the inspector arrives instead of a note on the door. More than twenty years building in South Florida, more than 150 remodels and additions, all of it permitted and inspected. A Weston job ends when the city's record for your address does.

Where we work in Weston
Elsewhere in Weston? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
Closing the gap in the record.
Half of this gets filed long before anyone breaks ground. Some of it gets excavated out of a twenty-year-old record two weeks before a closing. We take both.
Permits closed before resale
We pull the address history, sort each stale record by what it is actually short of, and take it to the inspection or the replacement permit that retires it.
Work nobody filed
Screen enclosures, generators, water heaters and window swaps done quietly over the years, documented as built, engineered where the structure asks for it, and inspected under current code.
Approved impact products
Windows, doors and roofing specified to approvals that hold inside the High-Velocity Hurricane Zone, with anchor details and installation instructions inside the submittal rather than scrambled for later.
Ready before the inspector arrives
Phased inspections called only when the work is genuinely ready, with a supervisor present to walk the inspector through it and correct anything minor on the spot.
Association review, then city
The architectural committee package and the permit set drawn from one set of plans, so your elevations, colors and product data never tell the city a different story.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Title turned up an open permit from 2011. Now what?
My HOA already approved the work. Do I still need a permit?
Does 40-year recertification apply to a house in Weston?
Which projects in Weston actually need a permit?
We close in a few weeks. Can this be sorted in time?
Contact
Association first, then the city
Give us the address and the closing date, or the plans you have not filed yet. You get a straight read of the record, in English o en español.