
Bathroom Remodeling · Coral Ridge, FL
Baths built to stay dry.
Primary suites, guest baths, and powder rooms in Coral Ridge houses, built with stone, frameless glass, and a waterproofing system that gets flood-tested before tile. Permitted through the city, inspected at every stage, supervised by a licensed general contractor.
Bathroom Remodeling in Coral Ridge
Two baths, one 1957 assumption.
An original Coral Ridge house came with two bathrooms, sometimes two and a half, sized for a family that showered quickly and did not own a hair dryer. The primary bath is typically a five-by-eight box with a tub, one sink, and a window that faces the neighbor. Owners along Bayview Drive and in Coral Ridge Country Club Estates fix that by annexing a bedroom or a closet: one real primary suite with a double vanity, a walk-in shower, and a tub that is there because someone wanted it.
Bath work is permitted by the City of Fort Lauderdale, with plumbing, electrical, and mechanical inspections booked before anything gets covered. That sequence is the whole value. Inspectors carry certification from Broward County's Board of Rules and Appeals, and their visit lands while the rough plumbing and the membrane are still visible. The local wrinkle is what these houses are made of: slab-on-grade floors and original cast iron drains. Cutting a slab for a curbless pan is routine here; finding a failing stack afterward is not a good day.
Think of it as a waterproof box holding expensive things; we build it that way. The membrane is flood-tested and photographed before any tile lands, slopes get checked with a level, niches are formed inside the waterproofing rather than carved in afterward, and heavy glass hangs on blocking put there deliberately. Then the ordinary manners: dust walls, protected routes, a supervisor daily, and a written scope agreed before selections are ordered. Coral Ridge humidity punishes shortcuts, so we do not take them.

Where we work in Coral Ridge
Elsewhere in Coral Ridge? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
Behind the tile and stone.
Bath scopes are settled on paper before selections are ordered. Below is what a Coral Ridge primary suite or guest bath usually involves.
Annexing a bedroom
Annexing a bedroom, hall closet, or linen alcove to create a real primary suite, with framing, rough plumbing, and the permit all in one package.
Curbless on a slab
Saw-cutting and recessing the slab where the structure allows, linear drains set to true slope, and pans flood-tested before a tile is placed.
Cast iron retired
Replacing original drains and galvanized supply while walls and floor are open, which is the only moment this ever costs a reasonable number.
Stone, glass, and hardware
Slab vanities and shower walls, heavy frameless glass on solid blocking, and coastal-rated hardware chosen to survive salt air off the Intracoastal.
Exhaust that leaves the building
Exhaust sized correctly and ducted outside, moisture-rated fixtures, and light placed where people actually shave and apply makeup instead of one ceiling glare.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Will a curbless shower work over a mid-century slab?
Should the old cast iron drains go while the bath is open?
How do inspections work on a bathroom permit in Fort Lauderdale?
Do we have to move out while the suite is torn up?
Why is one bathroom quote double another?
Contact
Pick the bath that annoys you
Send photos or show us in person. Back comes a scope, a schedule, and a price we will stand behind, in English o en español.