
Bathroom Remodeling · Victoria Park, FL
Bathrooms built to outlast the pipes.
Primary suites, frameless showers and freestanding tubs for Victoria Park homes, with waterproofing tested before a single tile lands and every trade permitted and inspected through Fort Lauderdale Building Services. Licensed and insured, Lic. CGC1539072.
Bathroom Remodeling in Victoria Park
New marble over ninety-year-old plumbing.
Count the bathrooms in an original Victoria Park cottage and you will usually reach one. Houses along the older blocks near Victoria Courts and NE 7th Street were built when a single tiled bath served the whole family, and the fifties ranches added a second that is still four feet wide. The fix is almost always annexation: borrow a small bedroom, a hall closet or a screened porch and turn the result into a primary bath with two sinks, a real shower and somewhere to put a towel.
Bathroom permits are issued by the City of Fort Lauderdale through Development Services, with plumbing, electrical and mechanical inspections along the way, all enforced under the Broward County amendments to the Florida Building Code that the Board of Rules and Appeals administers. The local complications are older than the code. Cast iron drains and galvanized supply lines are common in these houses, some sit on slab while others carry raised wood floors, and adding an exterior window for light means an HVHZ-approved impact unit rather than whatever matches.
Small room, zero forgiveness. Pans get flood-tested before tile, membranes get inspected instead of photographed, slopes get checked with a level, and exhaust gets ducted to the outside rather than into an attic where it will quietly ruin your framing. Every Victoria Park bath we build runs on a fixed written scope, daily supervision and protected pathways from your front door to the work zone. Licensed, insured and permitted on every job, with more than 20 years of South Florida work behind it.

Where we work in Victoria Park
Elsewhere in Victoria Park? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
Inside a Victoria Park bath remodel.
Waterproofing and plumbing decide whether the marble was worth it. Here is what we scope in writing before a single tile is ordered.
One less bedroom, one suite
Reworking bedrooms, closets and hallways into a genuine primary suite, with framing, plumbing rough-in and the permit drawings handled as one package.
Pans that hold water
Sloped pans, linear or center drains, and membranes water-tested and signed off by an inspector before tile, because the only cheap leak is the one that never happens.
Replacing what is behind
Cast iron and galvanized runs swapped for modern drain and supply while the walls are open, which never gets easier or cheaper than right now.
Stone, glass and heat
Large-format slabs and tile set on properly prepared substrates, heavy frameless glass anchored into blocking that was put there on purpose, and heated floors where the build-up allows.
Air that actually moves
Old houses vent badly, so the fan gets sized and ducted properly outdoors, and the light gets split between mirror, shower and room.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Can I put a curbless shower in a 1930s Victoria Park house?
The water pressure in my shower is terrible. Will a remodel fix it?
Do I need a permit just to retile a bathroom?
Can we stay in the house during a bathroom remodel?
What does a primary bath at this level cost?
Contact
The bathrooms, one at a time
Show us the bath that annoys you most. We will scope it properly, price it honestly, and answer questions in English o en español.