
Bathroom Remodeling · Wilton Manors, FL
One bathroom was never enough.
Primary suites, frameless showers and freestanding tubs for Wilton Manors homes built when one bath per house was standard. Waterproofed to spec, permitted, inspected, and supervised by the licensed contractor who signed the estimate.
Bathroom Remodeling in Wilton Manors
Small baths on a 1950s slab.
The typical Wilton Manors house arrived with one full bath and, if the original owners were feeling generous, a half off the hall. That worked in 1957. It does not work for anyone who has since seen a modern primary suite. So the common project across Westside, the Central Area and the Three Bridges streets is subtraction and addition at once: a third bedroom or an oversized closet gives up floor area, the hall bath grows into it, and what emerges is a suite with a double vanity, a shower you can turn around in, and a tub that stands on its own.
Bathroom remodeling in Wilton Manors is permitted through Community Development Services, and the job gets inspected by discipline as it goes: plumbing, electrical, mechanical. That sequence is the whole point, because waterproofing is verified before tile hides it. The local complication is the slab. These houses sit on grade with cast iron drains cast into concrete, so a relocated toilet or a recessed curbless pan means saw-cutting, re-routing and re-pouring. Add a window for daylight and Broward's High-Velocity Hurricane Zone product rules apply to the unit and to how it is fastened.
No room in the house is smaller or less forgiving. Pans are flood-tested and left overnight before anyone opens a box of tile. Slopes get checked with a level rather than a hopeful glance. Blocking goes into the walls for heavy glass and for grab bars you may not want yet. Every job carries a fixed written scope, a supervisor who shows up daily, and a license and insurance that are current, Lic. CGC1539072, with permits and inspections on all of it. Beautiful tile over bad waterproofing is a countdown, not a renovation.

Where we work in Wilton Manors
Elsewhere in Wilton Manors? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
The bath scope on a slab house.
Scoped in writing before the tile order goes in, because changing your mind at rough-in is the expensive kind of change. The usual components below.
Bedroom traded for a suite
Reworking bedroom, closet and hall bath into one suite, with new rough-ins, framing and a permit set drawn to match the plan you actually approved.
Curbless pans in a slab
Recessing the pan into a 1950s slab where the drain line and structure allow, with a linear drain, and a low-profile alternative offered honestly when they do not.
Membranes filled and tested
Bonded sheet or liquid membranes with corners and penetrations detailed, then filled and left overnight so any leak announces itself before the marble arrives.
Heavy glass on real blocking
Frameless enclosures hung from blocking installed during framing, with hinge locations set before drywall closes rather than negotiated with a glazier afterward.
Exhaust routed outside
Quiet fans ducted through a low-slope mid-century roof to a proper cap, so humidity leaves the building instead of touring the attic space.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Which parts of a bathroom job get inspected?
Is a curbless shower realistic on a slab house?
The house still has cast iron drains. Do we replace them?
Can we add a window without triggering a hurricane-code problem?
How much does a primary bath at this level cost?
Contact
Let's add the second bath
Show us the room, the plumbing wall and the wish list. Back comes the scope, the sequence and the price, in English o en español.