Modern rear addition with floor-to-ceiling glass — home additions in Wilton Manors, Florida. Architectural rendering.

Home Additions · Wilton Manors, FL

More room on a small lot.

Rear extensions, second stories, carport conversions and in-law suites in Wilton Manors: engineered, zoned, permitted through Community Development Services and built by a licensed, insured general contractor who is on site daily.

Licensed & insured Lic. CGC1539072 Wilton Manors · Broward County Hablamos español

Home Additions in Wilton Manors

Where the addition can actually go.

Wilton Manors covers 1.97 square miles, platted for single-story houses on modest lots, which makes a home addition a puzzle before it is a project. The moves that work are well known by now: pushing a family room and primary suite into the rear yard, converting the carport everyone parks in front of anyway, adding a second story over a ranch in Highland Estates or Coral Estates, or building a self-contained in-law suite. On the water in Jenada Isles and along Middle River Manor, the addition wants to face the river and the glass follows it.

Zoning is the first gate, not the last. Wilton Manors caps impervious coverage in its single-family districts, at 50 percent of the lot in RS-5, so new roof area, a wider driveway and a pool deck all compete for the same allowance, and a signed impervious calculation is part of the submittal. Community Development Services also wants a sealed survey under two years old, soil tests, an elevation certificate with base flood elevation, sealed wind-load calculations, and, where it applies, approval from the Broward County Environmental Protection and Growth Management Department. Anything needing a variance or site plan goes to the Development Review Committee and the Planning and Zoning Board.

You can read a builder's habits straight off an addition. New footings have to marry old ones, the tie-beam has to run continuous, and the seam where fresh stucco meets 1950s stucco should be impossible to find in raking afternoon light. We stage the work so the family keeps a working kitchen and bathroom, hold the site to the city's construction hours, and hand back a house that reads as one building rather than two. Fixed written scope. Daily supervision. One accountable team carrying the job from feasibility study to final inspection to warranty.

Covered terrace joining a modern rear addition — architectural rendering

Where we work in Wilton Manors

Wilton Manors East Three Bridges Central Area Westside Highland Estates Jenada Isles Coral Estates Middle River Manor Wilton Drive Colohatchee Edgewater Estates Coral Point NE 26th Street

Elsewhere in Wilton Manors? Call us — if it's in Miami-Dade or Broward, we probably build there.

What's included

How Island City houses grow.

Every addition starts with a current survey, an engineer and an honest look at the coverage limits. These are the five we build most often.

01

Pushing into the back yard

The rear of a small house extended on new footings, with tie-beam continuation and the roof joint drawn into one coordinated permit set.

02

Carports turned into rooms

Converting the open carport most 1950s plans included into conditioned space, with insulation, impact openings, mechanical extension and square footage that legally counts.

03

Building a second story

Testing existing footings and block walls first, then designing an upper level the engineer, the zoning reviewer and the roofline can all live with.

04

Self-contained family suites

Independent bedroom, bath and kitchenette wings for parents or long-staying relatives, built to code and detailed so the addition never announces itself from the street.

05

Coverage and drainage math

Impervious calculations, swales and site drainage resolved before design locks, since a driveway and a pool deck spend the same allowance the addition needs.

Glass sliders and roofline of a new rear addition — architectural rendering

How we work

A remodel is a promise. We keep it in writing.

20+
Years building in South Florida
150+
Remodels and additions delivered
100%
Permitted and inspected work
1
Team accountable from estimate to warranty

AFixed scope, honest pricing

A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.

BA superintendent on site, daily

Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.

CBuilt to code, warrantied in writing

HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.

How it goes

From first walk to final walk-through.

01

Walk-through & estimate

We visit, measure, listen, and come back with a real scope and a real number — not a teaser.

1–2 weeks
02

Design & permits

Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.

4–10 weeks
03

Construction

Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.

Per scope
04

Closeout & warranty

Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.

1–2 weeks

FAQ

Straight answers.

How much of my lot can I actually build on in Wilton Manors?
Less than most owners assume, and the binding number is usually impervious coverage rather than the building footprint alone. In the RS-5 single-family district the city allows 50 percent of the property to be impervious, and the permit package includes a signed impervious and pervious calculation. Roof area, driveway, walkways, patio, pool and slabs all count toward it. We run that math at feasibility so nobody designs a wing the site cannot carry.
Do I have to raise my seawall if I add on to a waterfront house?
Very possibly. The city's 2020 seawall ordinance requires waterfront owners to bring seawalls up to the city's standard when new construction or substantial renovation takes place, and separately when tidal flooding or erosion starts spilling onto a neighbor or the roadway. Seawall work also carries its own permit path through Broward County environmental licensing on top of the city permit. Budget it as part of the addition rather than discovering it at plan review.
Can my 1950s block house take a second story?
Sometimes yes, sometimes with reinforcement, occasionally not without spending more than the space is worth. A structural engineer evaluates the existing footings, block and tie-beam, and whether the roof framing can come off cleanly. We get that answer early, with numbers attached, and we will tell you plainly when a rear extension buys the same square footage for materially less. Guessing at this stage is how projects go sideways.
Will an addition go before a city board?
Only if it needs something discretionary. A conforming addition that respects setbacks, height and coverage is reviewed by building and zoning staff without a hearing. Ask for a variance, a site plan approval, a rezoning or a plat change and it goes to the Development Review Committee, which meets monthly, and then the Planning and Zoning Board. Board months add real calendar time, so we design toward conformity wherever the program allows it.
How long from first sketch to finished addition?
Design and engineering typically run two to three months. Permitting adds more, depending on submittal quality and any board hearings. Construction on a substantial addition commonly runs six months or beyond, and waterfront lots carrying county environmental review take longer still. We put the whole sequence in the written schedule that comes with the estimate, including the stretches that sit in someone else's hands.

Contact

How much can you build?

Send the address and the idea. Coverage, setbacks and structure get checked before a dollar goes to drawings, in English o en español.

Office
Miami, FL
Hours
Mon–Fri, 8:00–18:00
Opens your email app — nothing is stored on this site.