
Home Additions · Las Olas Isles, FL
Adding on to a finger island.
Rear extensions, second stories and garage conversions for Las Olas Isles homes, engineered for HVHZ wind loads, checked against flood and setback rules, permitted through Fort Lauderdale and supervised daily.
Home Additions in Las Olas Isles
Room to grow, on a narrow lot.
Las Olas Isles lots are long and narrow by design. The dredge cut them that way in the 1920s to maximize water frontage, which is wonderful for dockage and unforgiving for square footage. So additions on Coral Way, Riviera Isles or Royal Palm Drive tend to go up rather than out: a second story over a 1950s ranch, a primary suite above the garage, a rear extension squeezed between the side setbacks. Multigenerational households add ground-floor suites. Owners who love the street and the water build instead of moving.
Fort Lauderdale's Unified Land Development Regulations get specific about additions: setbacks, lot coverage, height and yard requirements for your zoning district, all reviewed by Development Services before the building permit issues. Structural engineering is not optional, since a second story means proving the existing block walls and footings can take it, and everything new must meet High-Velocity Hurricane Zone requirements under the Broward amendments to the Florida Building Code. Flood elevation matters too: an addition in a special flood hazard area has its own elevation and substantial-improvement math.
Twenty-plus years in South Florida and 150-plus remodels and additions have taught us where the money and the schedule hide: tying a new foundation to an old one on fill, matching stucco and roof so the seam disappears, and keeping half a house livable while the other half is scaffolded. Access on an isle is a project of its own, since a crane, a concrete pump and a lumber delivery all have to fit on one lane without blocking your neighbors. We plan that before we mobilize.

Where we work in Las Olas Isles
Elsewhere in Las Olas Isles? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
Adding on to an isle house.
Each of these starts with a survey, a structural engineer and a hard look at what the zoning district allows on your particular lot.
Going up over the block
Adding a full upper floor once the engineer confirms the existing walls and footings can carry it, with reinforcement designed in where they cannot.
Pushing out toward the canal
Living space extended within the setbacks, with new footings, tie-beams and roof tie-ins detailed so the addition never reads as bolted on.
Garage and carport conversions
Turning covered parking into conditioned rooms, insulated and mechanically served, permitted properly so the appraiser can count the space.
Ground-floor family suites
Ground-level quarters with a shower bath and compact galley for family or crew, permitted properly and scaled so they belong to the original house.
Foundations on fill
Footings, underpinning and tie-beam upgrades designed for soil that was dredged into place a century ago, which is the half of the budget nobody photographs.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Will a second story fly on a Las Olas Isles lot?
How close to the seawall can an addition go?
What is the realistic timeline from first meeting to finished addition?
Can we stay in the house while you build the addition?
Does adding on beat buying a bigger house on the isles?
Contact
Bring us the survey
We will look at the lot, the setbacks and the structure, then tell you what is buildable and what it costs, in English o en español.