Permit applications, HVHZ product approvals, inspections and the open-permit cleanup that surfaces at closing, handled for Las Olas Isles homes through Fort Lauderdale Development Services by a licensed general contractor, Lic. CGC1539072.
Permitting & Compliance in Las Olas Isles
Fort Lauderdale files it, Broward stands behind it.
Most permitting calls from Las Olas Isles arrive with a closing date attached. A title search on a Nurmi Isles house turns up a reroof permit from 2004 that never got its final. A dock on Hendricks Isle was rebuilt with nothing in the file. A Florida room on Isle of Venice was enclosed one weekend in the 1970s and never mentioned again. Waterfront records run long here, and canal-side work has always been the easiest to do quietly. The other half of these calls come from owners planning real work who want it filed correctly the first time.
The permit is a City of Fort Lauderdale matter, filed with Development Services and its Building Services Division through LauderBuild. Behind it sits the county layer: the Broward County Board of Rules and Appeals, which certifies every building official and inspector who will touch your file, keeps the county amendments to the Florida Building Code current, hears the appeals and writes the interpretations that end code arguments. Broward is High-Velocity Hurricane Zone territory, so glass, doors and roofing need approvals valid for the HVHZ, and on a flood-zone isle lot the substantial improvement threshold shapes how much you can do at once.
PGX Builders Group is the licensed general contractor whose name goes on the permit, Lic. CGC1539072, not a paperwork broker, so the responsibility comes with the application. We bring in the architect, engineer or surveyor a complete file actually requires, answer plan-review comments in one round instead of three, and have a supervisor on site when the inspector arrives, which on a one-lane isle matters more than it sounds. Twenty-plus years in South Florida and 150-plus remodels and additions, every one permitted and inspected, taught us that a job is not finished when the paint dries. It is finished when the file reads closed.

Where we work in Las Olas Isles
Elsewhere in Las Olas Isles? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
From application to a closed file.
Filed ahead of a remodel or opened up years after the fact, these five fronts decide whether an isle property reads clean on paper.
Permits left without a final
We pull the address history at the city, establish what each open record still owes, and carry it through re-inspection, revision or a replacement permit.
Seawall, dock and lift filings
Waterfront structures permitted properly, with the county environmental review that canal work triggers coordinated alongside the city permit instead of discovered halfway through.
Approved openings, documented
Windows, doors and roofing matched to approvals valid inside the High-Velocity Hurricane Zone, with anchor details and installation instructions in the set before anything ships.
Inspections called in sequence
Phased inspections requested when the work is genuinely ready and met on site by a supervisor, because a re-inspection on a one-lane island costs a week.
Legalizing unpermitted work
Enclosed carports, added baths, swapped glass and rebuilt docks brought back through as-built drawings, engineering and inspection against the code in force today.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
We close in six weeks and title found an open permit. Can it still be cleared?
Do I file with the city or with Broward County?
Does a seawall, dock or boat lift need a permit?
Our building has a milestone inspection coming. Can PGX do the repairs?
How long does plan review take, and what does permitting add to the budget?
Contact
Ahead of the lien search
Send the address and whatever the title search turned up. You get a straight read on where you stand and the fix in writing, in English o en español.