
Home Additions · Victoria Park, FL
Room to stay on your street.
Rear extensions, second stories, garage conversions and in-law suites on Victoria Park's tight platted lots. Engineered, zoned, permitted through the city, and supervised daily by a licensed South Florida general contractor.
Home Additions in Victoria Park
Growing a house on a 1925 lot.
Alfred Kuhn platted Victoria Park in 1925 with curving and diagonal streets, which produced beautiful blocks and a fair number of awkward lots. Owners here rarely leave. They are minutes from Las Olas and a short walk from Holiday Park, so instead of moving they add: a rear family room and primary suite behind a cottage on NE 8th Street, a second story over a fifties ranch, a garage turned into a proper guest suite, or an in-law wing for parents who have decided Fort Lauderdale beats winter.
Fort Lauderdale's rules get specific once you add square footage, and the City's Development Services Department applies all of them at once. Zoning review under the city's land development regulations governs setbacks, lot coverage and the thirty-five-foot height limit that applies in the single-family districts covering most of Victoria Park. Structural drawings need an engineer, new openings need HVHZ product approvals, and work in a mapped flood zone brings an elevation certificate into the submittal. If your property sits in a special flood hazard area, the federal fifty-percent substantial improvement test can reshape the project, so we run that math before anyone draws.
New foundations next to ninety-year-old ones, tie-beams poured into walls that were never designed for them, roof tie-ins where stucco has to match a texture nobody makes anymore: that is the part of an addition you cannot see and cannot skip. PGX has delivered more than 150 remodels and additions across South Florida in over 20 years, all permitted and inspected. You get a fixed written scope, daily supervision, the occupied half of the house kept livable, and one accountable team from feasibility through warranty.

Where we work in Victoria Park
Elsewhere in Victoria Park? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
Adding on to a 1925 lot.
Every addition starts with a survey, a zoning read and an engineer. These are the five shapes Victoria Park projects usually take.
Rear extensions
Pushing the back of the house into the yard for a family room, a bigger kitchen or a primary suite, with the structure and roof tie-in engineered together.
Going up a floor
Second stories on houses that were never meant to carry one, starting with an engineer's verdict on the existing walls, footings and lateral system.
The garage, converted
Converting garages and carports into conditioned rooms with insulation, impact openings and legal mechanical extensions, permitted so the space is real square footage on paper.
A suite for long stays
A bath, kitchenette and private entry for parents or grown children who are staying a while, sized to what the lot and the zoning actually allow.
Ground you cannot see
New footings tied to old ones, underpinning where the soil demands it, tie-beam upgrades, and the flood-zone elevation work Fort Lauderdale checks before approving new floor area.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
How big an addition will my Victoria Park lot allow?
Does the FEMA fifty percent rule apply to my house?
Can a 1930s cottage take a second story?
There is a big oak where I want the addition. Can it be removed?
How long from first conversation to finished room?
Contact
Let's talk about the addition
Tell us what the house is missing. We will read the lot, the code and the budget out loud, in English o en español.