Home Additions · Harbor Beach, FL
Grow the house, keep the dock.
Rear extensions, second stories and garage conversions in Harbor Beach, engineered for shallow coastal footings, checked against flood elevation rules, permitted by the City of Fort Lauderdale and built under the daily supervision of a licensed general contractor.
Home Additions in Harbor Beach
Why additions here start with elevation.
Lots in Harbor Beach are generous at the water and finite everywhere else, which is why the room you want usually goes up, back, or over the garage rather than sideways. The common projects: a second story over a single-level house on Del Lago Drive, a rear great room and primary wing pushed toward the canal on Laguna Terrace, a garage turned into a guest suite on East Lake Drive. Nobody trades dock frontage for square footage here, so an addition gets designed around the water instead of away from it.
Additions live or die on two numbers in Fort Lauderdale: what the Unified Land Development Regulations allow for setbacks, height and lot coverage in your zoning district, and where your finished floor sits against base flood elevation. Cross FEMA's substantial-improvement threshold and the whole structure must meet current flood construction standards, so we run that math before an architect draws. Plans go to Development Services for review; variances go to the Board of Adjustment; new footings, tie-beams and roof tie-ins get engineered and sealed. Every new opening needs HVHZ product approval, and removing a protected tree needs its own city permit.
The invisible half of an addition budget is what happens below grade and at the seams. On sandy coastal soil beside a seawall, new footings need real engineering and sometimes a geotechnical opinion; tying a second floor into fifty-year-old masonry needs a structural evaluation, not a guess. Matching stucco texture, tile profile and window sightlines is what keeps the addition from announcing itself. PGX carries all of it under one contract with a fixed written scope and a supervisor on site daily, and the family usually stays in the house while the other half goes up. Two decades of South Florida building sit behind that, under Lic. CGC1539072.

Where we work in Harbor Beach
Elsewhere in Harbor Beach? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
Directions an addition can go.
Each of these starts with an engineer and a flood elevation, not a sketch. Five shapes an addition takes on these isles.
Second floors over masonry
Existing walls and footings evaluated before anything is drawn, then an upper level designed with the columns, beams and tie-downs the engineer requires.
Rear wings toward the water
Great rooms and primary suites extended to the rear yard line, with new footings, roof tie-ins and a wall of impact glass facing the dock.
Garages turned into living space
Conditioning a garage or covered loggia properly: insulation, impact openings, mechanical extension and a permit trail that holds up at resale.
Guest and staff suites
Self-contained quarters with a shower bath and small galley for long-stay family, house managers or captains, scaled to the existing roofline.
Elevation and flood compliance
Raising floor levels, relocating mechanical equipment and detailing enclosures below base flood elevation when a project crosses into substantial improvement territory.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
How does the fifty percent rule affect an addition here?
Is there a design review board for Harbor Beach additions?
Can we stay in the house during a second-story addition?
How close to the seawall can we build?
How long from first meeting to finished addition?
Contact
Start with the elevation
Send the survey and tell us what is missing. We will come back with feasibility, flood implications and an honest cost band, in English o en español.