
Permitting & Compliance · Sunny Isles Beach, FL
Permits closed before the closing.
PGX files, builds and closes permits across Sunny Isles Beach: complete packages through the city's digital portal, Miami-Dade product approvals, inspections attended in order, and old permits cleared off a property before a sale stalls. Lic. CGC1539072.
Permitting & Compliance in Sunny Isles Beach
The record follows the address.
Sunny Isles Beach hides its permit problems well. A Collins Avenue residence that a previous owner reworked, rewired, or refloored three sales ago shows immaculate at the walk-through and still drags an unclosed permit through the city's records. West of Collins, the 1950s and 60s houses in Golden Shores and Atlantic Isle have collected enclosed carports, added bathrooms, and quiet weekend window swaps that no inspector ever saw. None of it appears on a survey. All of it appears the moment a title company or a refinance underwriter runs the address.
Permits inside the city limits are issued and inspected by the City of Sunny Isles Beach Building Department, and the whole cycle, from application through plan review, comments, inspections, and closeout, runs on the city's digital portal. Tower work collects more reviewers: a notarized association authorization naming the contractor, plus county Fire and DERM review depending on scope. Windows, doors, and roof assemblies need current Miami-Dade product approvals, because the city sits inside the High-Velocity Hurricane Zone. The same department administers building recertification, which arrives as a notice with a clock attached.
PGX Builders Group has spent more than twenty years building in South Florida, with over 150 remodels and additions delivered, every one permitted and inspected. We file under our own license, CGC1539072, and coordinate the engineer, architect, and product documentation each submittal needs. Scope goes in writing before anything is opened up, a supervisor is on site each day work moves, and the inspector is met by the person who built the wall. Nobody here will sell you a shortcut, only a complete package and a schedule your lender can read.

Where we work in Sunny Isles Beach
Elsewhere in Sunny Isles Beach? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
From application to final sign-off.
Whether the work starts next month or stalled years ago, these five fronts decide whether a Sunny Isles Beach property stays clean.
Unclosed permits, resolved
We pull the permit history, establish what each open or expired record actually covers, and carry it through re-inspection or a new permit until the file reads closed.
Submittals that clear review
Complete submittals through the city's digital portal, with drawings, calculations, and product data in the first upload, so review comments come back short.
High-rise glazing approvals
Impact glass, doors, and roofing specified with current Miami-Dade approvals and installed to the anchorage method those approvals document, because the inspector checks both.
Inspections taken in sequence
Rough-ins, framing, and finals requested in the right order and attended by the supervisor who ran the work, not by a phone number.
Recertification and milestone repairs
Concrete restoration, balcony and railing repair, waterproofing, and electrical corrections called for by a recertification or milestone report, built to your engineer of record and the board's calendar.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
A previous owner left an open permit on my Sunny Isles Beach property. What now?
Who issues building permits here, the city or Miami-Dade County?
Do I really need a permit to change windows, floors, or a bathroom in my unit?
Our building received a recertification notice. Can PGX do the repairs?
What does it cost to clear up a permit problem?
Contact
Send the unit and the address
Send the address and the date you are working against. We will read the file and tell you what closing it takes — in English o en español.