
Permitting & Compliance · Surfside, FL
Paperwork that survives a title search.
PGX handles Surfside permitting end to end: complete applications to the town, Miami-Dade product approvals, phased inspections, and old permits closed out before they threaten a sale. Licensed general contractor, CGC1539072, supervising the work that goes with them.
Permitting & Compliance in Surfside
The town that reads every page.
Most permit problems in Surfside were created long before the current owner arrived. The 1940s and 50s houses along Abbott, Byron, Carlyle, Dickens, and Hawthorne have each passed through several hands, and somewhere in that history a carport became a room, a bathroom appeared where a closet used to be, or windows were changed on a quiet weekend. None of that shows on a survey. All of it shows on a permit search, which is exactly what a title company or a refinance underwriter runs before the money moves. In the Collins Avenue towers the same question arrives addressed to a board instead.
Permits in Surfside are issued and inspected by the Town of Surfside Building Department on Harding Avenue, not by the county, although Miami-Dade rules follow the work anyway. Exterior changes and substantial renovations go to the Planning and Zoning Board for design review, with complete drawings due well ahead of a meeting date. Windows, doors, and roofing need current Miami-Dade product approvals, because the whole town sits in the High-Velocity Hurricane Zone. Buildings other than houses and duplexes fall under the county recertification code, handled here through the Building Department's Governmental Compliance Section, and condominium boards now carry milestone inspections and structural integrity reserve studies as well.
PGX Builders Group has more than twenty years in South Florida and over 150 remodels and additions delivered, every one of them permitted and inspected. We file under our own license, CGC1539072, and coordinate the engineer, architect, and product documentation each submittal needs, rather than leaving an owner to assemble it. The scope goes in writing before demolition, a supervisor is on site every day work moves, and inspections are met by someone who can answer for the wall in question. We do not promise shortcuts. We promise complete packages, honest sequencing, and a schedule you can hand to a lender.

Where we work in Surfside
Elsewhere in Surfside? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
What we file, and what we close.
Whether the work starts Monday or stopped years ago, these are the five fronts that stand between a Surfside property and a clean record.
Open permits closed out
We pull the full address history from the Town of Surfside, establish what each open permit actually covers, and take it through re-inspection, revision or a replacement permit until the file reads closed before closing.
Applications and plan review
Complete submittals to the Town of Surfside Building Department, with drawings, calculations, and code references in the first package, so review comments come back short.
Glazing and roofing approvals
Windows, doors, and roofing specified with current Miami-Dade approvals and installed to the documented method, because the inspector reads the paperwork against the wall.
Inspections walked with the town
Foundation, rough-in, framing and final booked in sequence and walked with the Town of Surfside inspector by the supervisor who built the work, not by a phone number on a form.
Milestone repairs, permitted properly
Structural, electrical, and waterproofing repairs called for by a recertification report or a milestone inspection, coordinated with your engineer of record and the board calendar.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
There is an open permit on my Surfside house from a previous owner. What now?
Who issues building permits in Surfside, the town or Miami-Dade County?
Do I need a permit to replace windows or the roof in Surfside?
Our building received a recertification notice. Can PGX do the repair work?
What does it cost to fix a permit problem?
Contact
Let us pull the permit history
Send the address. We will check what is open, tell you what closing it takes, and put the number in writing, in English o en español.