Modern rear addition with floor-to-ceiling glass — home additions in Sunny Isles Beach, Florida. Architectural rendering.

Home Additions · Sunny Isles Beach, FL

The square footage you are missing.

PGX designs and builds additions for Sunny Isles Beach's single-family streets — engineered for the High-Velocity Hurricane Zone, permitted through the city, and supervised every working day by a licensed GC, CGC1539072.

Licensed & insured Lic. CGC1539072 Sunny Isles Beach · Miami-Dade County Hablamos español

Home Additions in Sunny Isles Beach

Room to grow west of Collins.

Nobody adds a wing to the 40th floor. Additions in Sunny Isles Beach happen on the single-family streets west of Collins Avenue, where Golden Shores fills the blocks between 186th and 191st Streets, and gated Atlantic Isle rings its own island with waterfront lots. The originals are mostly two- and three-bedroom houses from the 1950s and '60s — modest footprints on land whose value outgrew them decades ago. Owners who love the location extend toward the canal, go up a story, or convert the garage into a suite rather than trade away a bay view for square footage elsewhere.

Additions run through the City of Sunny Isles Beach Building Department, with structural plans, energy calculations, and Miami-Dade product approvals filed through the city's digital portal; larger projects also get Planning and Zoning attention before a permit is issued. On this barrier island, FEMA flood-zone math shapes the design itself: push an older house past the substantial-improvement threshold and the entire structure must meet current elevation rules. Setbacks, lot coverage, and seawall proximity on Atlantic Isle all get resolved on paper first, which is considerably cheaper than resolving them in the field.

An addition is structural work pretending to be lifestyle work, and PGX treats it that way: foundation assessment before promises, tie-beam and roof connections engineered to current wind code, and a written scope that fixes what the new square footage includes before the first saw cut. Your existing house stays livable and protected while we build. One licensed, insured team — CGC1539072, 20-plus years in South Florida — carries design coordination, permits, inspections, and warranty from start to finish.

Covered terrace joining a modern rear addition — architectural rendering

Where we work in Sunny Isles Beach

Golden Shores Atlantic Isle Poinciana Island Estates at Acqualina Porsche Design Tower Turnberry Ocean Club Jade Signature Ritz-Carlton Residences Residences by Armani/Casa Muse Residences Trump Towers Oceania Island Winston Towers

Elsewhere in Sunny Isles Beach? Call us — if it's in Miami-Dade or Broward, we probably build there.

What's included

Ways to add square footage here.

Extensions and conversions for Golden Shores and Atlantic Isle properties, engineered to current wind and flood standards from the footings up.

01

Glass-walled rooms toward the bay

Family rooms, primary suites, and glass-walled living space extended toward the canal or bay, tied structurally into the existing house.

02

Second floor where footings allow

A full upper floor where foundations allow it — structural analysis first, then new tie beams, stairs, and a roof built to hurricane-zone code.

03

Garages turned into real rooms

Garages turned into guest suites, offices, or gyms with real insulation, conditioned air, and legal egress — permitted, not improvised.

04

Suites with their own entrance

Separate-entry suites for long-stay family, a sensible investment in a neighborhood where relatives arrive in January and depart in April.

05

Engineered for wind and sand

Footings, stem walls, and reinforced tie beams engineered for coastal wind loads and the sandy soil this barrier island sits on.

Glass sliders and roofline of a new rear addition — architectural rendering

How we work

A remodel is a promise. We keep it in writing.

20+
Years building in South Florida
150+
Remodels and additions delivered
100%
Permitted and inspected work
1
Team accountable from estimate to warranty

AFixed scope, honest pricing

A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.

BA superintendent on site, daily

Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.

CBuilt to code, warrantied in writing

HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.

How it goes

From first walk to final walk-through.

01

Walk-through & estimate

We visit, measure, listen, and come back with a real scope and a real number — not a teaser.

1–2 weeks
02

Design & permits

Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.

4–10 weeks
03

Construction

Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.

Per scope
04

Closeout & warranty

Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.

1–2 weeks

FAQ

Straight answers.

Can I add a second story to my Golden Shores house?
Frequently, yes — but the existing foundation and masonry have to prove they can carry it, so we start with a structural evaluation rather than a sketch. Zoning height limits and setbacks apply, and the design has to meet current wind-load requirements throughout. When the numbers work, a second story is often the best way to gain real square footage on a Golden Shores lot without sacrificing the yard.
How does the FEMA 50 percent rule affect additions in Sunny Isles Beach?
If your addition and related improvements exceed half of the existing structure's market value, flood regulations require the whole home to comply with current elevation standards — a very different project. We run that valuation math in the first conversation, and where it is tight, we can phase scope or adjust the design so you know exactly which side of the line the project sits on before spending on engineering.
How long does an addition take from design to move-in?
Plan on a design and permitting phase measured in months — engineering, energy calculations, city review through the digital portal, and Planning and Zoning input on larger projects — followed by a construction phase that depends on size and structure. We give you the honest version at the walk-through, in writing, and we keep the existing house weathertight and livable for as much of the build as the scope allows.
Will my addition need Planning and Zoning review?
Setback, lot-coverage, and height rules apply to every addition, and the City of Sunny Isles Beach routes substantial projects through planning review before building permits are issued. That is not a reason to shrink your ambitions; it is a reason to prepare a complete package the first time. We assemble the drawings, surveys, and calculations so the review has something clean to approve.
Can you make the addition match the original house?
That is the test of whether an addition was built well. We match stucco textures, roof lines, fascia profiles, and window proportions so the house reads as if it was always this size — or, where the owner prefers contrast, we detail the new volume deliberately instead of accidentally. Either way, the transition is designed on paper, not negotiated by the stucco crew on a ladder.

Contact

More room is on the table

We will walk the lot, check the flood math, and tell you what is buildable — plainly, in English o en español.

Office
Miami, FL
Hours
Mon–Fri, 8:00–18:00
Opens your email app — nothing is stored on this site.