
Kitchen Remodeling · Sunny Isles Beach, FL
Kitchens worth the ocean view.
Custom cabinetry, stone counters, and rebuilt layouts for Sunny Isles Beach residences — permitted through the city, cleared with your association where one exists, and supervised daily by PGX Builders Group, Lic. CGC1539072.
Kitchen Remodeling in Sunny Isles Beach
Kitchens for towers and canal-front houses.
Kitchens in this city come with context. Tower residences at Jade Signature, Muse, and the Ritz-Carlton Residences were delivered with perfectly respectable builder kitchens that owners routinely replace with something personal — a larger island, integrated European appliances, stone with actual movement. In Golden Shores and on Atlantic Isle, the kitchen is often the last original room in a 1950s or '60s house, walled off from the water view the lot was bought for. Both jobs end the same way: a kitchen designed around the person cooking, not around a floor plan somebody else chose.
The City of Sunny Isles Beach Building Department reviews kitchen renovation permits digitally, and the drawings matter. Relocating appliances, gas, or plumbing in a tower means working within the building's risers and stacks, with association sign-off secured before the city's. Anything touching the envelope carries Miami-Dade product-approval requirements for the High-Velocity Hurricane Zone. In condo buildings, slab penetrations and wet-area changes get reviewed closely — which is exactly how it should be when your new drain line runs above someone else's dining room.
Shop drawings for the cabinetry, slabs approved in person before cutting, and a supervisor on site daily, including the morning the stone rides the service elevator: that is how PGX runs a kitchen. The scope is fixed in writing before demolition, and one licensed team owns everything from rough-in to final inspection, so the lighting plan, the millwork, and the inspection card all agree with each other.

Where we work in Sunny Isles Beach
Elsewhere in Sunny Isles Beach? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
What we build into a kitchen.
Complete kitchen construction — cabinetry, stone, systems, and lighting — scoped in writing and permitted with the city before a single cabinet comes off the wall.
Cabinetry installed dead level
Fully custom millwork or premium European lines, built from shop drawings and installed dead level in buildings where very little else is.
Slabs up the service elevator
Natural stone, quartzite, and porcelain slabs — templated on site, seams planned in advance, and brought up the service elevator without drama.
Layout and island changes
Walls opened between kitchen and living space in Golden Shores houses; islands and appliance walls reconfigured within a tower's riser constraints.
Appliances moved where you cook
Panel-ready refrigeration, wine storage, induction or gas ranges moved where the layout wants them, with electrical and ventilation permitted to match.
Task, cove, and decorative light
Layered task, cove, and decorative lighting on proper dimming, aimed so the stone looks as good at night as it does at noon.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Can I move my sink or appliances in a Sunny Isles Beach condo?
How long does a kitchen remodel take in Sunny Isles Beach?
Do you handle the condo association paperwork?
Do I need a permit just to replace cabinets and counters?
What does a custom kitchen cost at this level?
Contact
Let's talk about your kitchen
Bring the wish list and the floor plan. We will walk the space and come back with a real number — in English o en español.