
Kitchen Remodeling · Bal Harbour, FL
A kitchen that earns the view.
Kitchen remodeling for Bal Harbour houses and tower residences: custom cabinetry, stone counters, islands, and full layout changes, designed around how you cook and delivered permitted, inspected, and supervised by a licensed builder.
Kitchen Remodeling in Bal Harbour
Kitchens on a very small island.
Bal Harbour kitchens tend to predate the way their owners entertain now. In the estate section, houses along Camden Drive still carry galley kitchens walled off from the living space, while residences in older towers like the Kenilworth and the Tiffany of Bal Harbour often hold original builder layouts from their first decades. Owners here don't want a refresh; they want custom cabinetry, a real island, stone chosen at the slab yard, and a kitchen finally open to the water view they paid for.
A kitchen that stays within its footprint is usually an interior-only permit, filed directly with the Bal Harbour Village Building Department. Knock down the wall to the dining room and you're into structural review; move the kitchen across a condo unit and you're routing drains and vents through a concrete building, which takes engineering and association sign-off, not optimism. Older towers along Collins Avenue also sit in Florida's milestone-inspection era, so associations read renovation plans more carefully than they did a decade ago. We prepare packages built to clear both reviews without a second round.
A PGX kitchen job runs like a well-plated service: everything is decided before the heat comes on. Cabinetry shop drawings are approved before demolition, stone is at the fabricator while rough trades run, and appliance specs are locked so the electrician never guesses. Our site lead walks the job every day, floors and elevators get protected like they belong to someone we want to work for again, because they do, and the schedule you sign at contract is the schedule we actually manage to.

Where we work in Bal Harbour
Elsewhere in Bal Harbour? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
What the kitchen contract covers.
Five things we do constantly in Bal Harbour kitchens, each one priced, drawn, and scheduled before demolition day.
Cabinetry approved before fabrication
Built-to-order cabinetry with shop drawings you approve before fabrication, sized to the room and the ceiling, not to a catalog.
Stone chosen at the slab yard
Marble, quartzite, and porcelain slabs templated on site and installed with seams planned where you will not stare at them.
Galley walls opened to the water
Galley walls removed and sightlines opened toward the water, with any structural change engineered, permitted, and inspected.
Appliances moved, services rerouted
New positions for ranges, ovens, and refrigeration, with electrical, ventilation, and drainage rerouted correctly — the part you never see but always feel.
Lighting planned with the cabinetry
Layered task, ambient, and accent lighting planned with the cabinetry, so the island reads as furniture rather than a workstation.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Can I move my kitchen to a different part of my condo?
Does a kitchen remodel in Bal Harbour need Architectural Review Board approval?
How long does a kitchen remodel take in Bal Harbour?
What does a custom kitchen cost in this area?
Who handles my building's renovation requirements?
Contact
Start with a real kitchen plan
Tell us how you actually cook and entertain. We'll measure, listen, and come back with a real scope and number, in English o en español.