Renovated kitchen with marble island and custom cabinetry — kitchen remodeling in Miami Beach, Florida. Architectural rendering.

Kitchen Remodeling · Miami Beach, FL

Kitchens built for Miami Beach living.

Custom kitchens for Miami Beach homes and condo towers: cabinetry built to order, stone templated on site, layouts opened up legally — permitted, inspected, and managed by one licensed team every day.

Licensed & insured Lic. CGC1539072 Miami Beach · Miami-Dade County Hablamos español

Kitchen Remodeling in Miami Beach

From Flamingo Park galleys to island estates.

A Miami Beach kitchen has range in every sense. In Flamingo Park and the Deco streets of South Beach, owners are unwinding narrow 1930s galleys into rooms people actually gather in. On North Bay Road and the Sunset Islands, kitchens run to catering scale — double islands, wine walls, prep pantries — because the house hosts forty as often as four. And in the towers of South of Fifth, a full kitchen rebuild happens inside a condo's rules. We design and build for all three, with custom cabinetry and stone work as the constant.

Even an interior-only kitchen runs through the City of Miami Beach Building Department, because moving gas, relocating appliances, or touching a drain line means permits and trade inspections. In a condo, add the association layer: board approval of plans, insurance certificates, elevator reservations, and workday noise windows. In the post-milestone-inspection era, boards read renovation paperwork more carefully than ever. In historic-district houses, a new window over the sink brings the Historic Preservation Board into your kitchen. We have processed enough of these approvals to keep them boring.

What makes a PGX kitchen different is the discipline around it. The scope is fixed in writing — cabinetry line, stone slabs, appliance schedule, lighting plan — before we open a wall, so the budget does not drift with the tide. A site supervisor is there every day, protecting floors that are staying and neighbors who are not moving. Cabinetry is measured after the walls are true, not before, and stone is templated on site. For twenty-plus years and over 150 projects across South Florida, that sequence is why our kitchens finish level, plumb, and on speaking terms with their owners.

Marble backsplash and brass fittings in a renovated kitchen — architectural rendering

Where we work in Miami Beach

South of Fifth Flamingo Park North Bay Road Sunset Islands Palm Island Hibiscus Island Star Island La Gorce Island Allison Island Pine Tree Drive Bayshore Mid-Beach Normandy Isles Altos del Mar

Elsewhere in Miami Beach? Call us — if it's in Miami-Dade or Broward, we probably build there.

What's included

What we build into Miami Beach kitchens.

From Deco-cottage galleys to double-island estate kitchens, these are the five things we get asked to build most often on the Beach.

01

Cabinetry fitted to 1935 walls

Built-to-order boxes and fronts in humidity-stable finishes, fitted to walls that are rarely square in a 1935 house, with hardware that shrugs off salt air.

02

Stone islands scaled for fifty

Marble, quartzite, and porcelain slabs templated on site, with islands engineered for seating, storage, and the occasional buffet for fifty.

03

Galleys opened to the terrace

Opening galley kitchens to dining rooms and terrace views with engineered headers and proper permits, so the cook stops working in a hallway.

04

Appliance walls, gas rerouted

Rerouting gas, water, and ventilation for new appliance walls, permitted and inspected, and planned around riser realities when the kitchen lives in a tower.

05

Dimmable layers over the marble

Task light where you prep, ambient light where you gather, accents on the stone — every layer dimmable, because good marble deserves good light.

Stone island and seating in a remodelled kitchen — architectural rendering

How we work

A remodel is a promise. We keep it in writing.

20+
Years building in South Florida
150+
Remodels and additions delivered
100%
Permitted and inspected work
1
Team accountable from estimate to warranty

AFixed scope, honest pricing

A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.

BA superintendent on site, daily

Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.

CBuilt to code, warrantied in writing

HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.

How it goes

From first walk to final walk-through.

01

Walk-through & estimate

We visit, measure, listen, and come back with a real scope and a real number — not a teaser.

1–2 weeks
02

Design & permits

Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.

4–10 weeks
03

Construction

Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.

Per scope
04

Closeout & warranty

Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.

1–2 weeks

FAQ

Straight answers.

Do I need a permit to remodel my kitchen in Miami Beach?
If the project moves plumbing, gas, electrical, or walls — and a real kitchen remodel almost always does — yes, through the City of Miami Beach Building Department, with trade inspections along the way. Purely cosmetic swaps like counters or cabinet fronts on existing footprints may not require one. We permit everything that needs it, because unpermitted kitchen work has a way of surfacing at appraisal or closing, at the least convenient possible moment.
Can you renovate a kitchen in a South of Fifth or Collins Avenue condo?
Yes, condo kitchens are a regular part of our Miami Beach work. Expect association review of your plans, proof of licensing and insurance, elevator scheduling, and defined work hours; some buildings also restrict wet-over-dry layout changes, which limits where sinks and appliances can move. We read your building's alteration agreement before we design, so the kitchen you fall in love with is one your board will actually approve.
How long does a custom kitchen remodel take?
The honest driver is cabinetry lead time, which for true custom work is measured in months, not weeks, so we run design, permitting, and ordering in parallel. Site construction on a typical high-end kitchen spans several weeks to a few months depending on structural changes. What we do not do is demolish your kitchen and then start waiting on cabinets. Demolition begins when the long-lead items are real.
What does a high-end kitchen cost in Miami Beach?
Custom cabinetry, natural stone, and appliance packages set the range more than square footage does, and it is a wide range. We position ourselves at the craftsmanship end of the market, so our numbers reflect real custom work, licensed trades, and full permitting rather than a resurfacing job with new handles. After one walk-through we will give you a written scope with a fixed price — a more useful document than any ballpark.
Does salt air really affect kitchen materials this close to the ocean?
It does, and oceanside blocks feel it most. Standard steel hardware pits, budget appliance finishes corrode, and unsealed natural stone absorbs more than it should in constant humidity. We specify marine-grade stainless, quality plated or solid-brass hardware, and sealed or porcelain surfaces where exposure is high, especially in homes that open to terraces and let the outside in. The upgrade cost is modest; replacing corroded finishes in five years is not.

Contact

Start with the kitchen

Bring your inspiration photos and your building's rules if you have them. We will handle the rest — walk-throughs and estimates in English o en español.

Office
Miami, FL
Hours
Mon–Fri, 8:00–18:00
Opens your email app — nothing is stored on this site.