Permitting & Compliance · Pinecrest, FL
Two additions, one missing permit.
Permitting and compliance for Pinecrest homes: applications and plan review through the Village, HVHZ product approvals, inspections, and closing out open or expired permits that stall a sale. Licensed general contractor, Lic. CGC1539072.
Permitting & Compliance in Pinecrest
Old county permits, new village rules.
Pinecrest is a village of 1950s and 60s ranch houses on acre lots, and most of them have been added to at least twice. Screened patios became family rooms, garages became gyms, and summer kitchens and cabanas appeared behind the hedge in Devonwood, Suniland and North Pinecrest. Some of that work was permitted. Some of it was not, and nobody thinks about it until a title search, a lender or an insurance underwriter goes looking. That is usually the week our phone rings.
Permits here are filed with the Village of Pinecrest Building and Planning Department on Pinecrest Parkway, which takes plans digitally through its online permitting portal and requires contractors to be registered with the village before anything is issued. Electrical, plumbing, mechanical, roofing and window work each carry their own permit and their own inspections, tree removal has its own application, and every exterior opening or roof system needs product approval for the High-Velocity Hurricane Zone. Because Pinecrest only incorporated in 1996, the oldest permits on your house may still belong to Miami-Dade County, and the village has a specific procedure for closing those.
We treat permitting as construction management, not errands. PGX coordinates the architect, engineer or arborist a submittal actually needs, prepares the package so plan review has nothing to ask twice, and answers comments in writing instead of by phone rumor. Inspections are scheduled and attended by our own supervisor rather than left to a subcontractor's morning. You get one accountable team, a fixed written scope, and a file that holds up when a buyer's attorney reads it, backed by more than 20 years of permitted work in South Florida.

Where we work in Pinecrest
Elsewhere in Pinecrest? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
Permit work we handle in Pinecrest.
From a single window permit to a decade of unpermitted additions: filed, inspected and closed out under one licensed contractor.
Open and lapsed permits
We pull the permit history on your address, work out what each open record still needs, and take it through reactivation, inspection and final closeout.
Old Miami-Dade County permits
Permits issued before the village incorporated get closed through Pinecrest, and the route the Building Official sets depends on the type of work involved.
Legalizing unpermitted work
After-the-fact permits for the enclosed patio or converted garage: as-built drawings, engineering where required, and inspection of construction that is already standing.
Miami-Dade NOAs on file
Windows, doors, garage doors, shutters and roof systems documented with Miami-Dade Notices of Acceptance, so the inspector approves the installation and not just the invoice.
Every inspection, in order
Trade inspections scheduled, attended and passed in sequence, ending with the sign-off that leaves your file genuinely closed rather than merely quiet.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
I'm under contract in Pinecrest and title found an open permit. What now?
The permit is from Miami-Dade County, not Pinecrest. Who closes it out?
The previous owner enclosed the patio without a permit. Can that be legalized?
Do my windows need Miami-Dade approval, or is a Florida product approval enough?
Does the 40-year recertification apply to my house in Pinecrest?
Contact
Find out what your file says
Send us the address. We'll check the permit history and tell you plainly what is open and what it takes to close it, in English o en español.