
Bathroom Remodeling · Pinecrest, FL
Primary baths worth the square footage.
Bathroom remodeling for Pinecrest homes — primary suites, frameless glass, freestanding tubs, and waterproofing done to spec. Licensed and insured (CGC1539072), permitted through the Village, and supervised every day it matters.
Bathroom Remodeling in Pinecrest
Sixty-year-old baths, modern standards.
A ranch-era Pinecrest house typically came with bathrooms that were generous for 1965 and comical now: a five-foot tub, a single sink, and tile the color of an avocado. Owners in South Pinecrest and Kendall Park Estates are rebuilding them as true primary suites — wet rooms with freestanding tubs, frameless showers lined in real slabs, double vanities with actual storage. Often the smartest move is borrowing space from an oversized closet or hallway, and on an acre lot there is usually somewhere for the square footage to come from.
Bathroom projects here are permitted through the Village of Pinecrest Building and Planning Department, with separate plumbing, electrical, and building inspections along the way. Two local realities matter. First, many original Pinecrest homes still run on cast-iron drain lines nearing the end of their service life — we camera-scope them rather than tile over a problem. Second, a fair number of properties in the village remain on septic systems, so relocating fixtures or adding a bathroom deserves a capacity check before plans are drawn.
Waterproofing is where bathroom remodels are won or lost, and it is invisible by the time anyone is admiring the marble. We put the whole assembly in writing — membranes, slopes, flood tests, movement joints — and a PGX supervisor verifies each step before tile goes on. Fixed scope, daily supervision, protected floors between the front door and the work zone, and one accountable team from first measurement to the warranty call you probably will not need.

Where we work in Pinecrest
Elsewhere in Pinecrest? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
What we rebuild behind the tile.
Complete bathroom construction, demolition to final caulk line — engineered, permitted, and inspected so the pretty parts last.
Suites built from borrowed space
Combining bedrooms, closets, and original baths into a true suite, with the structural and mechanical changes drawn and permitted.
Frameless glass, templated last
Walk-in showers built on fully waterproofed assemblies with linear drains, the glass templated only once tile is finished.
Freestanding tubs on a slab
Sculptural tubs with floor-mounted fillers roughed in exactly, because moving a drain in a concrete slab is a plan, not an improvisation.
Stone and tile, checked daily
Book-matched slabs, large-format porcelain, and mosaics set flat and aligned — checked daily by a supervisor with a level and opinions.
Plumbing and drain updates
Camera-scoping original cast-iron lines, repiping where needed, and ventilation that actually clears steam from an interior bath.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
How long does a primary bathroom remodel take in Pinecrest?
Should I replace the cast-iron drain lines during the remodel?
Do bathroom remodels in Pinecrest require permits?
Can I add a bathroom if my house is on septic?
What does a high-end bathroom remodel cost?
Contact
Start with the bath you use most
Show us the bathroom that annoys you daily. We'll design the one that will not — priced in writing, in English o en español.