Open-plan remodeled living space — home remodeling in Key Biscayne, Florida. Architectural rendering.

Home Remodeling · Key Biscayne, FL

Whole-home remodeling on the Key.

PGX Builders Group remodels Key Biscayne homes end to end — layout, structure, MEP, finishes — fully permitted through the Village and supervised daily by a licensed general contractor (Lic. CGC1539072).

Licensed & insured Lic. CGC1539072 Key Biscayne · Miami-Dade County Hablamos español

Home Remodeling in Key Biscayne

Remodeling rules change at the causeway.

Key Biscayne's housing stock tells the island's whole story: 1950s Mackle-built concrete block houses in the village core, later ranches off Fernwood Road, and waterfront estates on Mashta Island, Harbor Point, and Cape Florida. Most were drawn for a different era of island life — closed kitchens, one modest bathroom, no laundry worth the name. Because buildable land on the Key ran out decades ago, owners who love their street tend to remodel deeply rather than move: full gut renovations, new layouts, structural openings, complete electrical and plumbing updates, and impact windows throughout.

Remodeling here runs through the Village of Key Biscayne's Building, Zoning and Planning Department, a separate jurisdiction from Miami-Dade with its own contractor registration, electronic plan review, and inspectors who know the island lot by lot. Two rules shape every major project. First, all of Miami-Dade sits in the High-Velocity Hurricane Zone, so windows, doors, and roofing need county-approved products. Second, much of the Key sits in a FEMA flood zone, where the substantial-improvement rule means a remodel valued near half your structure's worth triggers full flood-elevation compliance. We run that math before you commit, not after.

Twenty-plus years of building in South Florida and more than 150 finished remodels and additions, each one permitted and inspected, have made PGX Builders Group hard to surprise. On Key Biscayne that experience shows up as a fixed written scope before demolition, a supervisor on your site daily, and finish protection that treats your terrazzo and your neighbors' driveway with equal respect. One accountable team carries the project from estimate to warranty, and the paperwork that keeps a remodel legal is our problem, not yours.

Remodelled living space viewed from the seating area — architectural rendering

Where we work in Key Biscayne

Cape Florida Mashta Island Smugglers Cove Harbor Point Holiday Colony Biscayne Key Estates Matheson Estates Key Colony Ocean Club Oceana Key Biscayne

Elsewhere in Key Biscayne? Call us — if it's in Miami-Dade or Broward, we probably build there.

What's included

What a whole-home remodel covers.

Every Key Biscayne remodel is scoped in writing before work begins. These are the moves we make most often on the island.

01

Gut renovations of Mackle houses

Taking a 1950s block house down to structure and rebuilding the interior around how your family actually lives on the island.

02

Beams where the walls were

Removing walls, adding beams, and opening closed floor plans — engineered, permitted through the Village, and inspected at every stage.

03

Systems sized for island humidity

New electrical, plumbing, and high-efficiency HVAC sized for island humidity, replacing systems that predate most of Crandon Boulevard's traffic lights.

04

Impact openings, Miami-Dade approved

Hurricane-zone-rated openings with Miami-Dade product approvals, installed with the anchoring and flashing details that matter more here than almost anywhere.

05

Millwork that survives salt air

Stone, tile, custom millwork, and paint specified to survive salt air, installed under daily supervision so the details land.

Open-plan living and kitchen after a full renovation — architectural rendering

How we work

A remodel is a promise. We keep it in writing.

20+
Years building in South Florida
150+
Remodels and additions delivered
100%
Permitted and inspected work
1
Team accountable from estimate to warranty

AFixed scope, honest pricing

A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.

BA superintendent on site, daily

Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.

CBuilt to code, warrantied in writing

HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.

How it goes

From first walk to final walk-through.

01

Walk-through & estimate

We visit, measure, listen, and come back with a real scope and a real number — not a teaser.

1–2 weeks
02

Design & permits

Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.

4–10 weeks
03

Construction

Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.

Per scope
04

Closeout & warranty

Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.

1–2 weeks

FAQ

Straight answers.

Do I need a permit to remodel my home in Key Biscayne?
Yes. The Village of Key Biscayne runs its own Building, Zoning and Planning Department, and it requires contractors to register with the Village before applying for permits. Structural changes, electrical, plumbing, mechanical, window replacement — all of it gets permitted and inspected. Unpermitted work has a way of surfacing at the worst time, usually during a sale or an insurance claim. PGX handles registration, submittals, and inspections as part of every project.
What is the FEMA 50 percent rule and will it affect my remodel?
Much of Key Biscayne sits in a FEMA flood zone, and the Village enforces the substantial-improvement rule: when the value of improvements approaches half the market value of the structure itself, the entire building must be brought into compliance with current flood-elevation standards. That can reshape a project's scope or budget dramatically, so we run the numbers with you before design gets far. Sometimes it changes the plan; it should never be a surprise.
How long does a whole-home remodel take on the island?
The honest answer depends on scope. Design and Village permitting typically take a few months for a major remodel, with construction running several more. Island logistics add real planning: one causeway on and off, and material deliveries scheduled so your street is not blocked for weeks. We build the timeline into the written scope and report progress regularly, so you always know where the project stands.
Should we remodel our 1950s Mackle house or tear it down and rebuild?
It depends on what you love about the house and what the flood math says. Many Mackle-era homes are solid concrete block worth keeping, and a deep remodel can deliver a modern home while preserving the scale of the street. But when the scope approaches the substantial-improvement threshold, a rebuild sometimes makes more sense. We give you a straight comparison — scope, numbers, tradeoffs — and we are comfortable either way, so the advice is not a sales pitch.
What does a high-end whole-home remodel cost in Key Biscayne?
There is no honest single number: a whole-home remodel spans a wide range depending on structural scope, systems, and finish level, and island projects carry real logistics costs. What we can promise is the shape of the number — a fixed written scope with allowances spelled out, so the price you sign is the price that governs. PGX is a high-end contractor, not the cheapest bid, and our clients hire us so the budget holds.

Contact

Show us the house

Tell us what the island house should have been all along. Free walk-through and written estimate, in English o en español — call (786) 273-2524.

Office
Miami, FL
Hours
Mon–Fri, 8:00–18:00
Opens your email app — nothing is stored on this site.