Primary bathroom with freestanding tub and marble shower — bathroom remodeling in Coral Gables, Florida. Architectural rendering.

Bathroom Remodeling · Coral Gables, FL

Primary baths, engineered behind the marble.

Primary-suite and guest bath remodels across Coral Gables — frameless glass, stone, freestanding tubs, and waterproofing done to spec — fully permitted, inspected, and supervised daily by a licensed general contractor.

Licensed & insured Lic. CGC1539072 Coral Gables · Miami-Dade County Hablamos español

Bathroom Remodeling in Coral Gables

Old Gables plumbing meets new Gables marble.

Bathrooms are where Coral Gables homes show their age first. Merrick-era houses near the Biltmore came with one modest bath per floor, and even the mid-century homes out in Gables by the Sea and Snapper Creek Lakes predate the idea of a primary suite with a double vanity, a freestanding tub, and a shower you can stand in without negotiating. So owners here remodel: combining a small bedroom and a hall bath into a real suite, or taking a dated eighties renovation down to the studs and doing it properly in stone.

Bathroom remodeling in Coral Gables is permitted through the city's Development Services Department, with plumbing, electrical, and mechanical inspections along the way. Purely interior work skips the Board of Architects; add or enlarge a window for natural light and the Board weighs in before the Building Division does. The bigger local issue is what sits behind the walls: original cast iron drains, galvanized supply lines, and slabs poured decades before anyone dreamed of a curbless shower. We scope those realities up front, because discovering them mid-demolition is how other people's projects lose their schedules.

PGX treats a bathroom as a small building with unforgiving tolerances. Waterproofing membranes get flood-tested before a single tile goes down, slopes get checked with a level rather than optimism, and stone is handled by installers who have earned the right to touch it. You get a fixed written scope, daily supervision, and protection for every finished surface between the front door and the work zone. Licensed and insured, Lic. CGC1539072, every project permitted and inspected, because a beautiful bathroom that leaks is just an expensive one.

Frameless glass shower and marble detailing in a primary bath — architectural rendering

Where we work in Coral Gables

Riviera Country Club Section French Village Cocoplum Tahiti Beach Gables Estates Gables by the Sea Old Cutler Bay Snapper Creek Lakes Sunrise Harbour Journey's End Hammock Oaks Deering Bay

Elsewhere in Coral Gables? Call us — if it's in Miami-Dade or Broward, we probably build there.

What's included

What a Gables bath remodel covers.

From powder rooms to full primary suites, the scope is settled in writing before the tile is ordered. The usual elements below.

01

Bedroom and hall bath, combined

Reworking bedrooms, closets, and hall baths into a true suite, with layout, plumbing rough-ins, and permits handled as one package.

02

Showers the slab can take

Curbless or low-curb entries where the slab allows, flood-tested pans, linear drains, and heavy glass hung on solid blocking rather than hope.

03

Tubs the floor can hold

Tub placement with floor structure verified, plus marble and quartzite surfaces sealed and installed to survive daily use in Miami humidity.

04

Full plumbing replacement

Swapping original cast iron and galvanized lines for modern drains and supply while the walls are open, the cheapest moment you will ever do it.

05

Quiet exhaust, layered light

Quiet exhaust routed properly to the exterior, moisture-rated fixtures, and lighting layered for actual grooming instead of a single ceiling glare.

Double vanity and mirrors in a renovated primary bathroom — architectural rendering

How we work

A remodel is a promise. We keep it in writing.

20+
Years building in South Florida
150+
Remodels and additions delivered
100%
Permitted and inspected work
1
Team accountable from estimate to warranty

AFixed scope, honest pricing

A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.

BA superintendent on site, daily

Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.

CBuilt to code, warrantied in writing

HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.

How it goes

From first walk to final walk-through.

01

Walk-through & estimate

We visit, measure, listen, and come back with a real scope and a real number — not a teaser.

1–2 weeks
02

Design & permits

Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.

4–10 weeks
03

Construction

Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.

Per scope
04

Closeout & warranty

Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.

1–2 weeks

FAQ

Straight answers.

Do I need a permit for a bathroom remodel in Coral Gables?
Yes, for anything beyond cosmetics. Moving or replacing plumbing, altering electrical, or changing ventilation all require permits through Coral Gables Development Services, with inspections before things get closed up. That inspection sequence is your friend: it means the waterproofing and rough plumbing were verified before tile hid them. We pull the permits, schedule the inspections, and keep the paper trail you will want at resale.
My house still has original cast iron drains. Should we replace them now?
If the walls and floors are open anyway, almost always yes. Cast iron from the 1920s through the 1950s is at or past the end of its service life, and a beautiful new bathroom draining into a failing stack is a bad bet. We scope camera inspections early so you decide with facts, and replacement happens while access is free instead of after the marble is down.
Can I have a curbless shower in an older Coral Gables home?
Often, but it depends on the structure. On a slab, recessing the pan takes careful cutting and sometimes rerouted plumbing; on wood-framed second floors, we adjust framing to sink the pan. When the structure genuinely will not cooperate, a low-profile curb with a properly sloped pan is the honest alternative. We will tell you which one your floor supports before you fall in love with a photo.
Does the Board of Architects care about my bathroom?
Only when it shows from outside. An interior bath remodel goes through plan review without Board involvement; enlarging or adding a window, or venting through a visible facade, brings the Board in first. On designated historic homes, exterior changes need a Certificate of Appropriateness as well. Most bathroom scopes stay interior, so most of our Gables bath projects skip design review entirely, and we confirm which case is yours at the walk-through.
What does a primary bath remodel cost at this level?
Stone, glass, and plumbing fixtures set the tone, and the behind-the-wall work of new drains, supply, and ventilation is the part people underestimate. Rather than quote a fantasy range, we walk the space, scope what the building actually needs, and give you a fixed written number. As a high-end contractor we compete on certainty and finish quality, not on being the lowest of three bids.

Contact

Start with the bathroom that bothers you

Tell us what you want fixed and we will put a real scope and a real number on it, in English o en español.

Office
Miami, FL
Hours
Mon–Fri, 8:00–18:00
Opens your email app — nothing is stored on this site.