
Bathroom Remodeling · Brickell, FL
Your floor is someone's ceiling.
Primary bath renovations for Brickell towers and townhomes: frameless showers, freestanding tubs, stone, and waterproofing treated as the main event. Permitted with the City of Miami and supervised daily. Lic. CGC1539072.
Bathroom Remodeling in Brickell
Waterproofing is the luxury nobody sees.
The primary baths in Brickell's eighties and nineties towers were built compartmentalized and beige: a tub deck here, a bidet room there, original tile throughout. Owners at Santa Maria, Bristol Tower, and across Brickell Key now rebuild them as open suites, with frameless glass showers, freestanding tubs set where the view earns them, book-matched stone, and vanities with actual storage. In the newer towers, the upgrade is from builder-standard to bespoke. Either way, a Brickell bathroom remodel is really two projects: the one you see, and the waterproofing underneath it that protects the unit below yours.
Bathroom work in Brickell needs City of Miami permits for plumbing and electrical, inspections that include the shower pan, and association approval before any of it. Building rules matter here more than anywhere: most towers restrict moving wet areas beyond their original footprint, hard flooring triggers sound-rated underlayment requirements, and older units can require an asbestos check before demolition. And because every bathroom in a tower sits above somebody's ceiling, associations increasingly ask exactly how yours will be waterproofed. We consider that a fair question with a documented answer.
PGX builds bathrooms in the order that prevents problems: substrate corrected, membranes installed and flood-tested, inspections passed, and only then the stone and glass everyone came for. A supervisor checks the site daily, finishes are protected from trade to trade, and the paperwork, from permits to product approvals, is closed out and handed over. After 20-plus years and more than 150 South Florida remodels, we can say the expensive bathroom failures are almost never the tile. They are the shortcuts under it, which is why we refuse to take any.

Where we work in Brickell
Elsewhere in Brickell? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
Bathroom work we take on in Brickell.
From full primary-suite rebuilds to precise powder-room upgrades, every bath gets the same waterproofing discipline and written scope.
Primary suite rebuilds
Combining compartmentalized eighties layouts into one open suite, with the tub, shower, and double vanity arranged around the light and the view.
Curbless showers where possible
Full-height glass, linear drains, and benches built on flood-tested pans, curbless where the slab allows the recess and low-profile where it does not.
Tubs, marble, and movement joints
Sculptural tubs, slab walls, and book-matched marble installed over correct substrates, with movement joints where South Florida humidity demands them.
Waterproofing and testing
Membranes, pans, and penetrations documented and flood-tested before tile: the details nobody admires and everybody in the unit below depends on.
Powder and guest baths
Compact renovations with outsized finish ambition, sequenced quickly so a small room does not occupy your freight elevator calendar for months.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Can I move or add a bathroom in my Brickell condo?
What does high-rise waterproofing involve that a house doesn't?
Can I get a curbless shower on a concrete slab?
Do I need permits for a bathroom remodel in Brickell?
How long will my bathroom be out of service?
Contact
Plan the bathroom properly
Walk us through the existing bath and the wish list, and we'll respond with a scope, a schedule, and a fixed price. English o español, your call.