
Bathroom Remodeling · Upper East Side & Morningside, FL
Bathrooms built for old houses.
Primary suites, frameless showers, and stone baths for the Upper East Side's older homes — fully permitted through the City of Miami, waterproofed correctly, and supervised daily by a licensed contractor.
Bathroom Remodeling in Upper East Side & Morningside
Modern baths in ninety-year-old houses.
The bathrooms that came with the Upper East Side's houses — in Morningside, Bayside, and Shorecrest alike — were an afterthought: one per floor, tiled in pastel, sized for people in a hurry. The remodel most owners want now is a true primary suite, with a bedroom or oversized closet converted into a bath holding a freestanding tub, a frameless shower, book-matched stone, and lighting that flatters rather than interrogates. In a 1930s house that transformation is as much plumbing strategy as design, and it rewards a contractor who has opened up these floors before.
Every bathroom remodel here is permitted through the City of Miami Building Department, with plumbing, electrical, and building inspections included. What the permit card doesn't show is what we find under it: original cast-iron drain lines near the end of their service life, galvanized supply pipes ready for retirement, framing that has hosted a leak or two since the Kennedy administration. We scope the house's plumbing honestly before we quote, because replacing a corroded stack mid-project is exactly the surprise a fixed contract exists to prevent. Interior work rarely involves historic review; changing exterior windows in a designated district does.
Waterproofing is where bathroom budgets go to be vindicated or embarrassed, usually years later. PGX installs full membrane systems behind every shower and flood-tests pans before a single tile goes down — details nobody photographs and nobody should ever have to think about again. Add daily site supervision, dust containment that respects the rest of an occupied home, and a written scope that names your fixtures and stone before demolition starts, and you get the version of a bathroom remodel that ends with everyone still on speaking terms.

Where we work in Upper East Side & Morningside
Elsewhere in Upper East Side & Morningside? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
What we build into every bath.
Five things your bathroom contract will name specifically — because the details that fail are the ones left vague.
A suite where a bedroom was
Bedrooms and closets reworked into full suites — bath, dressing area, and the new plumbing runs to serve them, engineered before demolition.
Frameless showers, curbless where possible
Curbless where the structure allows, with membrane waterproofing, linear drains, and glass measured after the tile is set, not before.
Heavy tubs, floors checked first
Cast or stone tubs placed where the floor structure supports them, with floor-mounted fillers roughed in exactly once.
Slab stone and mosaic floors
Book-matched slabs, mosaics, and large-format tile set flat on properly prepared substrates — the difference you can see from the doorway.
Exhaust that protects old framing
Quiet, ducted exhaust sized for Miami humidity, protecting the new finishes and the ninety-year-old structure around them.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Can you add a primary bathroom to a 1930s Upper East Side house?
Do bathroom remodels need permits in the City of Miami?
The house is on a slab — can the shower or drain move?
Will the historic district care about my bathroom remodel?
Why is waterproofing such a big deal in Miami bathrooms?
Contact
Your primary suite, on paper first
Book a walk-through and get an honest written estimate for your bathroom — in English o en español, at your convenience.