Primary bathroom with freestanding tub and marble shower — bathroom remodeling in Upper East Side & Morningside, Florida. Architectural rendering.

Bathroom Remodeling · Upper East Side & Morningside, FL

Bathrooms built for old houses.

Primary suites, frameless showers, and stone baths for the Upper East Side's older homes — fully permitted through the City of Miami, waterproofed correctly, and supervised daily by a licensed contractor.

Licensed & insured Lic. CGC1539072 Upper East Side & Morningside · Miami-Dade County Hablamos español

Bathroom Remodeling in Upper East Side & Morningside

Modern baths in ninety-year-old houses.

The bathrooms that came with the Upper East Side's houses — in Morningside, Bayside, and Shorecrest alike — were an afterthought: one per floor, tiled in pastel, sized for people in a hurry. The remodel most owners want now is a true primary suite, with a bedroom or oversized closet converted into a bath holding a freestanding tub, a frameless shower, book-matched stone, and lighting that flatters rather than interrogates. In a 1930s house that transformation is as much plumbing strategy as design, and it rewards a contractor who has opened up these floors before.

Every bathroom remodel here is permitted through the City of Miami Building Department, with plumbing, electrical, and building inspections included. What the permit card doesn't show is what we find under it: original cast-iron drain lines near the end of their service life, galvanized supply pipes ready for retirement, framing that has hosted a leak or two since the Kennedy administration. We scope the house's plumbing honestly before we quote, because replacing a corroded stack mid-project is exactly the surprise a fixed contract exists to prevent. Interior work rarely involves historic review; changing exterior windows in a designated district does.

Waterproofing is where bathroom budgets go to be vindicated or embarrassed, usually years later. PGX installs full membrane systems behind every shower and flood-tests pans before a single tile goes down — details nobody photographs and nobody should ever have to think about again. Add daily site supervision, dust containment that respects the rest of an occupied home, and a written scope that names your fixtures and stone before demolition starts, and you get the version of a bathroom remodel that ends with everyone still on speaking terms.

Frameless glass shower and marble detailing in a primary bath — architectural rendering

Where we work in Upper East Side & Morningside

Morningside Belle Meade Belle Meade Island Bay Point Bayside Palm Grove Shorecrest Magnolia Park Legion Park MiMo District

Elsewhere in Upper East Side & Morningside? Call us — if it's in Miami-Dade or Broward, we probably build there.

What's included

What we build into every bath.

Five things your bathroom contract will name specifically — because the details that fail are the ones left vague.

01

A suite where a bedroom was

Bedrooms and closets reworked into full suites — bath, dressing area, and the new plumbing runs to serve them, engineered before demolition.

02

Frameless showers, curbless where possible

Curbless where the structure allows, with membrane waterproofing, linear drains, and glass measured after the tile is set, not before.

03

Heavy tubs, floors checked first

Cast or stone tubs placed where the floor structure supports them, with floor-mounted fillers roughed in exactly once.

04

Slab stone and mosaic floors

Book-matched slabs, mosaics, and large-format tile set flat on properly prepared substrates — the difference you can see from the doorway.

05

Exhaust that protects old framing

Quiet, ducted exhaust sized for Miami humidity, protecting the new finishes and the ninety-year-old structure around them.

Double vanity and mirrors in a renovated primary bathroom — architectural rendering

How we work

A remodel is a promise. We keep it in writing.

20+
Years building in South Florida
150+
Remodels and additions delivered
100%
Permitted and inspected work
1
Team accountable from estimate to warranty

AFixed scope, honest pricing

A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.

BA superintendent on site, daily

Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.

CBuilt to code, warrantied in writing

HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.

How it goes

From first walk to final walk-through.

01

Walk-through & estimate

We visit, measure, listen, and come back with a real scope and a real number — not a teaser.

1–2 weeks
02

Design & permits

Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.

4–10 weeks
03

Construction

Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.

Per scope
04

Closeout & warranty

Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.

1–2 weeks

FAQ

Straight answers.

Can you add a primary bathroom to a 1930s Upper East Side house?
Yes — it is our most requested project in Morningside and Bayside. The design question is where the plumbing can run: these houses sit on slabs or shallow floor structures, so drain routing gets planned before anything is promised. A bedroom or generous closet usually donates the space. We handle the engineering, the City of Miami permits, and the reality that no two of these houses were built quite alike.
Do bathroom remodels need permits in the City of Miami?
Yes — moving fixtures, altering plumbing or electrical, or changing walls all require permits and inspections. A tile-and-vanity refresh with everything staying in place is lighter, but most remodels worth doing here go further than that. Permitted work protects you at resale and keeps your insurer friendly. We pull every permit and meet every inspector; it is in the contract, not an upsell.
The house is on a slab — can the shower or drain move?
Yes. We saw-cut the slab, re-route the drain lines, and pour back — routine work when it is planned, miserable when it is improvised. In houses of this age we also scope the existing cast-iron lines while the slab is open, because that is the cheapest moment you will ever have to replace them. It adds a line to the scope and subtracts a future emergency.
Will the historic district care about my bathroom remodel?
Interior bathroom work does not go through historic review, even in Morningside or Palm Grove. It only enters the picture if the project changes the exterior — enlarging a window for the new shower wall, say, or adding a vent visible from the street. If your design touches the facade, we prepare the Certificate of Appropriateness paperwork; if it doesn't, the district won't slow you down at all.
Why is waterproofing such a big deal in Miami bathrooms?
Humidity, hard use, and — in this neighborhood — old structures that have already survived one era of leaks. Behind our showers goes a full membrane system, sloped and flood-tested before tile; around the room goes ventilation sized for actual South Florida moisture. None of it shows in photographs, and all of it decides whether the bathroom still looks new in a decade. We consider that the point.

Contact

Your primary suite, on paper first

Book a walk-through and get an honest written estimate for your bathroom — in English o en español, at your convenience.

Office
Miami, FL
Hours
Mon–Fri, 8:00–18:00
Opens your email app — nothing is stored on this site.