
Home Additions · Upper East Side & Morningside, FL
More house, same character.
Rear extensions, second stories, and new primary wings for Upper East Side homes — engineered, permitted through the City of Miami, cleared through historic review where required, and built under daily supervision.
Home Additions in Upper East Side & Morningside
Adding on without selling out.
The Upper East Side has generous lots and, by today's standards, modest houses. A 1930s Morningside home often offers less space than its lot could gracefully carry — which is why rear extensions, primary-suite wings, and carefully judged second stories are how families stay in Belle Meade, Palm Grove, and Bayside instead of leaving them. The best additions here read as if the original architect returned with a bigger budget: same proportions, same materials, more house. That standard is the job.
An addition is where this area's rulebook earns respect. Inside the Morningside, Bayside, and Palm Grove historic districts, new construction needs a Certificate of Appropriateness from the City of Miami's Historic and Environmental Preservation Board — rear-facing additions that defer to the original street elevation have the smoothest path. Everywhere in the neighborhood, permits and inspections run through the City of Miami Building Department under Miami 21 zoning. And on bayfront lots in FEMA flood zones, we do the substantial-improvement math early, because it can decide how ambitious the project should be.
Structurally, additions in this neighborhood are marriages of 1930s masonry and current Florida Building Code — new foundations tied to old footings, tie beams and hurricane strapping the original builders never imagined, stucco profiles matched so the seam disappears. PGX has delivered 150-plus remodels and additions across South Florida, every one permitted and inspected. You get one contract, one accountable team, a supervisor on site daily, and — in Belle Meade and Bay Point — crews that treat the gate, the neighbors, and the schedule with equal care.

Where we work in Upper East Side & Morningside
Elsewhere in Upper East Side & Morningside? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
Addition types we build here.
Different houses call for different footprints. These are the additions Upper East Side lots carry most gracefully.
Extensions the street never sees
Family rooms and kitchens extended toward the yard while the historic street elevation stays untouched — the shape historic review favors.
Upper floors on 1930s masonry
Full structural evaluation, new tie beams, and engineering that lets a 1930s house carry a modern upper floor safely.
Primary suite wings
A new bedroom, bath, and dressing suite added where the lot allows, tied cleanly into the original roof lines.
Garage and porch conversions
Underused square footage brought into conditioned space legally — permitted, insulated, and finished to match the rest of the house.
Foundation and tie-beam work
New footings doweled to old, tie beams and strapping to current code — the structure inspectors check and hurricanes test.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Can I add a second story in the Morningside historic district?
How does the FEMA substantial-improvement rule affect additions here?
Is building inside Belle Meade's gate complicated?
How long does a home addition take from design to done?
Will the addition match the original house?
Contact
Room to grow, done properly
Tell us what the house is missing. We'll walk the lot, talk feasibility honestly, and follow up in writing — in English o en español.