Modern rear addition with floor-to-ceiling glass — home additions in Upper East Side & Morningside, Florida. Architectural rendering.

Home Additions · Upper East Side & Morningside, FL

More house, same character.

Rear extensions, second stories, and new primary wings for Upper East Side homes — engineered, permitted through the City of Miami, cleared through historic review where required, and built under daily supervision.

Licensed & insured Lic. CGC1539072 Upper East Side & Morningside · Miami-Dade County Hablamos español

Home Additions in Upper East Side & Morningside

Adding on without selling out.

The Upper East Side has generous lots and, by today's standards, modest houses. A 1930s Morningside home often offers less space than its lot could gracefully carry — which is why rear extensions, primary-suite wings, and carefully judged second stories are how families stay in Belle Meade, Palm Grove, and Bayside instead of leaving them. The best additions here read as if the original architect returned with a bigger budget: same proportions, same materials, more house. That standard is the job.

An addition is where this area's rulebook earns respect. Inside the Morningside, Bayside, and Palm Grove historic districts, new construction needs a Certificate of Appropriateness from the City of Miami's Historic and Environmental Preservation Board — rear-facing additions that defer to the original street elevation have the smoothest path. Everywhere in the neighborhood, permits and inspections run through the City of Miami Building Department under Miami 21 zoning. And on bayfront lots in FEMA flood zones, we do the substantial-improvement math early, because it can decide how ambitious the project should be.

Structurally, additions in this neighborhood are marriages of 1930s masonry and current Florida Building Code — new foundations tied to old footings, tie beams and hurricane strapping the original builders never imagined, stucco profiles matched so the seam disappears. PGX has delivered 150-plus remodels and additions across South Florida, every one permitted and inspected. You get one contract, one accountable team, a supervisor on site daily, and — in Belle Meade and Bay Point — crews that treat the gate, the neighbors, and the schedule with equal care.

Covered terrace joining a modern rear addition — architectural rendering

Where we work in Upper East Side & Morningside

Morningside Belle Meade Belle Meade Island Bay Point Bayside Palm Grove Shorecrest Magnolia Park Legion Park MiMo District

Elsewhere in Upper East Side & Morningside? Call us — if it's in Miami-Dade or Broward, we probably build there.

What's included

Addition types we build here.

Different houses call for different footprints. These are the additions Upper East Side lots carry most gracefully.

01

Extensions the street never sees

Family rooms and kitchens extended toward the yard while the historic street elevation stays untouched — the shape historic review favors.

02

Upper floors on 1930s masonry

Full structural evaluation, new tie beams, and engineering that lets a 1930s house carry a modern upper floor safely.

03

Primary suite wings

A new bedroom, bath, and dressing suite added where the lot allows, tied cleanly into the original roof lines.

04

Garage and porch conversions

Underused square footage brought into conditioned space legally — permitted, insulated, and finished to match the rest of the house.

05

Foundation and tie-beam work

New footings doweled to old, tie beams and strapping to current code — the structure inspectors check and hurricanes test.

Glass sliders and roofline of a new rear addition — architectural rendering

How we work

A remodel is a promise. We keep it in writing.

20+
Years building in South Florida
150+
Remodels and additions delivered
100%
Permitted and inspected work
1
Team accountable from estimate to warranty

AFixed scope, honest pricing

A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.

BA superintendent on site, daily

Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.

CBuilt to code, warrantied in writing

HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.

How it goes

From first walk to final walk-through.

01

Walk-through & estimate

We visit, measure, listen, and come back with a real scope and a real number — not a teaser.

1–2 weeks
02

Design & permits

Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.

4–10 weeks
03

Construction

Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.

Per scope
04

Closeout & warranty

Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.

1–2 weeks

FAQ

Straight answers.

Can I add a second story in the Morningside historic district?
Sometimes — it depends on the house and the design. The Historic and Environmental Preservation Board reviews additions for compatibility, and second stories that overwhelm a contributing home's street presence get pushed back. Set-back upper floors and rear-facing massing have a far better record. We tell you early and honestly whether your concept is likely to pass review, because designing around the answer is cheaper than arguing with it.
How does the FEMA substantial-improvement rule affect additions here?
On lots in mapped flood zones — much of the bayfront in this neighborhood — if the value of the work crosses half the building's market value, current flood elevation requirements can apply to the whole structure. That can reshape a project or occasionally argue for a different one. We run this analysis during estimating, in writing, so the decision gets made at the kitchen table instead of at plan review.
Is building inside Belle Meade's gate complicated?
Less than people fear. Permits are still City of Miami — the gate changes logistics, not jurisdiction. We schedule deliveries tightly, keep the street clean, and make sure crews going in and out are expected, because a contractor's reputation inside a gated neighborhood is built one workday at a time. Neighbors talk on these streets. We would rather they talk about how quiet the job was.
How long does a home addition take from design to done?
Plan on a real timeline: design and engineering first, then historic review where it applies, then City of Miami permitting, then construction — several months at minimum, and longer for second stories or bayfront lots. What we control is honesty about the schedule and daily supervision once we are building. What kills addition timelines is usually the gap between phases, so we manage all of them under one roof.
Will the addition match the original house?
That is the craft. We match stucco textures, roof slopes, eave details, and window proportions so the addition reads as family, not a guest. In the historic districts, review standards actually ask new work to be subtly distinguishable from old — compatible, not counterfeit — and a good design does both. Either way, the goal is that in five years nobody remembers where the house used to end.

Contact

Room to grow, done properly

Tell us what the house is missing. We'll walk the lot, talk feasibility honestly, and follow up in writing — in English o en español.

Office
Miami, FL
Hours
Mon–Fri, 8:00–18:00
Opens your email app — nothing is stored on this site.