
Permitting & Compliance · Upper East Side & Morningside, FL
The open permit nobody told you about.
We pull City of Miami permits for Upper East Side houses, meet the inspectors, and close the file — including the expired one a prior owner left behind. Licensed general contractor, CGC1539072, supervising every job daily.
Permitting & Compliance in Upper East Side & Morningside
Ninety years of permit history.
Houses in Miami's Upper East Side have been changing hands, and changing shape, since the 1920s. A Mediterranean Revival on a Morningside street, a Streamline Moderne behind Belle Meade's gate, a 1940s house in Palm Grove or Magnolia Park, a bayfront property in Shorecrest — most carry a permit history several owners deep, and somewhere in it sits a job that was never signed off. A roof, a window swap, a pool enclosure, a garage quietly turned into a guest room. None of it announces itself until a title search finds it, weeks before a closing or a refinance.
Work here is filed with the City of Miami Building Department, through the city's iBuild and ePlan systems under Miami 21 zoning — the first gate, not the only one. Morningside, Bayside and Palm Grove are locally designated historic districts, and the MiMo Biscayne Boulevard district runs along the corridor, so exterior changes there need a Certificate of Appropriateness from the Historic and Environmental Preservation Board. Windows, doors and roof assemblies need Miami-Dade product approvals for the High-Velocity Hurricane Zone. Bayfront lots add flood-zone review, and the apartment and condominium buildings around Shorecrest carry recertification and milestone obligations of their own.
PGX Builders Group is a licensed general contractor rather than a permit runner, and that distinction shows when a file has to be closed instead of merely opened. We begin by reading what the city and the county already hold on the property, then tell you plainly what is outstanding, how much of it is paperwork and how much is real work. Where the file needs an architect, a structural engineer or a surveyor, we engage and coordinate them. Scope is written before anything begins, a supervisor meets every inspector on site, and one team carries it from application to final approval.

Where we work in Upper East Side & Morningside
Elsewhere in Upper East Side & Morningside? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
From first filing to final sign-off.
New permits, stalled files, and whatever a previous owner left behind in the record — all of it handled by the contractor who also does the work.
Open permits, several owners deep
We pull the record, become the contractor of record where the original one has vanished, finish whatever is missing, and get the final inspection signed.
Filings, plans and historic review
Drawing sets assembled, applications submitted to the City of Miami, Certificate of Appropriateness packages where the district requires one, and reviewer comments answered until the permit issues.
Impact glass and its paperwork
Impact windows, doors and roof systems matched to current Miami-Dade approvals, with the Notice of Acceptance and anchor details filed alongside the drawings.
Inspections met on site
Phased inspections booked in the right sequence and met by a supervisor who has already checked what the inspector is coming to look at.
Recertification and milestone work
For older apartment and condominium buildings around Shorecrest: the concrete, waterproofing, balcony and electrical repairs an engineer's report calls for, permitted and closed out.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
A title search on our Morningside house found an open permit. What now?
Who issues building permits for the Upper East Side?
Does historic designation change the permit process in Morningside?
The previous owner closed in the garage without a permit. Can that be legalized?
Our building near Shorecrest received a recertification notice. Do you handle the repairs?
Contact
Let's read the whole history
Give us the address. We will read what the city has on file, then tell you what clearing it actually takes — in English o en español.