Renovated kitchen with marble island and custom cabinetry — kitchen remodeling in Upper East Side & Morningside, Florida. Architectural rendering.

Kitchen Remodeling · Upper East Side & Morningside, FL

Kitchens worthy of the house.

Custom kitchens for houses that predate the modern kitchen — cabinetry, stone, gas, and lighting built and permitted by a licensed Miami general contractor, with a PGX supervisor on site daily.

Licensed & insured Lic. CGC1539072 Upper East Side & Morningside · Miami-Dade County Hablamos español

Kitchen Remodeling in Upper East Side & Morningside

Kitchens these houses never had.

The original kitchens in Morningside, Palm Grove, and Belle Meade were designed to be hidden — small, closed rooms at the back of the house, built when nobody entertained in them. Today the kitchen is where these Upper East Side homes live, so owners open them to the dining room, add an island in honed stone, and commission cabinetry that holds its own next to ninety-year-old plaster and hardwood. Done well, a new kitchen feels inevitable in a 1938 house. Done poorly, it looks like a showroom crashed into it. We build the first kind.

A kitchen remodel here is a City of Miami permit job — building, electrical, plumbing, and mechanical — and in these houses it usually uncovers the original infrastructure: cloth-insulated wiring, galvanized supply lines, undersized panels. Removing the wall between kitchen and dining room means engineering, because most of these walls are load-bearing masonry. And if your street is inside the Morningside, Bayside, or Palm Grove historic district, any exterior change — a new window over the sink, a relocated vent — needs a Certificate of Appropriateness before it needs a permit. We handle both, in the right order.

Every PGX kitchen begins as a fixed written scope, allowances spelled out rather than discovered along the way. Our supervisor is on site daily, the cabinetry is measured after the walls are straightened rather than before, and the stone templating happens once the boxes are set — the sequence that separates a tight kitchen from an expensive one with gaps. With 150-plus remodels and additions delivered across South Florida, we have made peace with old houses. They still surprise us; they no longer surprise our budgets.

Marble backsplash and brass fittings in a renovated kitchen — architectural rendering

Where we work in Upper East Side & Morningside

Morningside Belle Meade Belle Meade Island Bay Point Bayside Palm Grove Shorecrest Magnolia Park Legion Park MiMo District

Elsewhere in Upper East Side & Morningside? Call us — if it's in Miami-Dade or Broward, we probably build there.

What's included

The full kitchen picture.

From cabinetry drawings to the final punch list, this is the work a PGX kitchen contract actually covers.

01

Cabinetry that holds its own

Shop-built boxes and fronts to your designer's or our drawings, scribed to plaster walls that have not been square since 1940.

02

Honed stone islands and counters

Marble, quartzite, or granite templated after cabinet set, with seams planned on paper first and fabricators we trust with the slabs.

03

Pro ranges and new gas runs

Panel-ready refrigeration, pro ranges, new gas runs and dedicated circuits — permitted and inspected rather than improvised behind a cabinet.

04

Opening the load-bearing masonry

Engineered removal of the masonry wall between kitchen and dining room, with beams sized and inspected — the move that transforms these floor plans.

05

New panel, layered lighting

Layered lighting on new circuits and a panel that can handle it, replacing whatever decades of prior owners left behind.

Stone island and seating in a remodelled kitchen — architectural rendering

How we work

A remodel is a promise. We keep it in writing.

20+
Years building in South Florida
150+
Remodels and additions delivered
100%
Permitted and inspected work
1
Team accountable from estimate to warranty

AFixed scope, honest pricing

A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.

BA superintendent on site, daily

Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.

CBuilt to code, warrantied in writing

HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.

How it goes

From first walk to final walk-through.

01

Walk-through & estimate

We visit, measure, listen, and come back with a real scope and a real number — not a teaser.

1–2 weeks
02

Design & permits

Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.

4–10 weeks
03

Construction

Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.

Per scope
04

Closeout & warranty

Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.

1–2 weeks

FAQ

Straight answers.

Do I need a permit for a kitchen remodel in Miami?
Yes. Anything beyond paint and swapping appliances in place — new circuits, moved plumbing, removed walls, relocated gas — requires City of Miami permits and inspections. Unpermitted kitchen work surfaces at the worst possible time: appraisal, insurance renewal, or closing. PGX permits every job, which is exactly what you want to be able to say when you eventually sell a house in this neighborhood.
Will historic district rules affect an interior kitchen remodel?
Usually not — the Morningside, Bayside, and Palm Grove designations govern exterior appearance, and a kitchen that stays inside the existing walls is reviewed like any other permit. The exceptions are changes visible from outside: a new or enlarged window, a relocated exterior door, a vent through a street-facing facade. Those need a Certificate of Appropriateness first, and we build that step into the schedule when it applies.
Can you open the kitchen to the dining room in an older masonry house?
Almost always, with engineering. Most interior walls in these 1920s-to-1940s houses are load-bearing masonry, so the opening gets a properly sized beam, shoring during the work, and city inspections — not a saw and confidence. It is the single most transformative move available in these floor plans, and it is the kind of structural work we do week in, week out.
How long does a custom kitchen take?
Construction itself typically runs a few months; the honest schedule driver is lead time — custom cabinetry and slab selection can take longer than the building work, and appliance deliveries have opinions of their own. We sequence ordering during permitting so the waiting overlaps, and we never demolish your kitchen until the long-lead items are confirmed. You get a schedule in writing and a supervisor who keeps it.
What does a high-end kitchen cost in this area?
It varies widely with cabinetry, stone, appliances, and how much structure and infrastructure the project touches — in these houses, panel upgrades and re-piping often ride along. We would rather scope your actual kitchen than quote a fantasy average. Expect a serious investment, expect it itemized line by line in writing, and expect the final number to match the contract. That last part is the one that matters.

Contact

Start with the kitchen walk-through

Show us the kitchen you have and describe the one you want — we'll answer with a written scope, in English o en español.

Office
Miami, FL
Hours
Mon–Fri, 8:00–18:00
Opens your email app — nothing is stored on this site.