
Bathroom Remodeling · Miami Shores, FL
New bathrooms for old Miami Shores houses.
Primary suites, frameless marble showers, and freestanding tubs for Miami Shores homes, with prewar plumbing realities handled honestly and every project permitted through the Village and inspected at each stage.
Bathroom Remodeling in Miami Shores
Membranes before marble, always.
Most Miami Shores houses were generous about everything except bathrooms. A 1920s Mediterranean Revival near NE 96th Street might have one original bath serving four bedrooms, and the ranches near the Country Club settled for a hall bath and a sliver of a master. The bathroom remodeling owners here actually want is a primary suite: two rooms combined, a marble shower you can stand in with your elbows out, a freestanding tub, and storage that ends the hallway-closet shuffle. That conversion is most of our bath work in the Village.
Bathroom remodels are permitted through the Miami Shores Village Building Department, with plumbing, electrical, and inspections in sequence along the way. Prewar houses here often carry their original cast-iron drain stacks and galvanized supply lines, so we scope the plumbing honestly before you commit, because replacing pipe during the remodel costs far less than opening finished marble later. Purely interior work stays out of design review, but a new or enlarged window brings in the Village's harmony standards and an impact-rated, Miami-Dade approved unit. We work both sides of that line every week.
Waterproofing is the part of a bathroom nobody photographs, so it is the part we supervise hardest: membranes carried to the right height, pans flood-tested before tile, slopes checked before stone goes down. PGX Builders Group is a licensed general contractor, CGC1539072, and every bath we build is permitted and inspected, no exceptions. You get a fixed scope in writing, finish materials protected from the first day of demolition, and one team accountable from estimate through warranty.

Where we work in Miami Shores
Elsewhere in Miami Shores? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
What we build behind the marble.
Every bathroom scope covers the visible finishes and the invisible work that determines whether those finishes last for decades.
Two rooms into one suite
Combining small bedrooms, closets, and original baths into a genuine suite with double vanity, real storage, and a floor plan that finally works.
Frameless marble showers
Waterproofing membranes carried high, pans flood-tested before tile, and glass measured after stone: the sequence that keeps showers dry.
Tubs the floor can carry
Drain relocations and floor structure verified before the tub is ordered, so the centerpiece sits exactly where it should without compromise.
Tile set so nothing cracks
Slab, mosaic, and large-format installations over flat substrates with movement joints, the kind of craftsmanship you notice because nothing cracks later.
Repiping and drainage
Replacing galvanized supply lines and cast-iron stacks while the walls are open, the least expensive moment that work will ever have.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Do bathroom remodels in Miami Shores need permits and inspections?
What surprises hide in a 1920s bathroom remodel?
Can you turn two small rooms into a primary suite?
Does a new bathroom window need Village approval?
How much does a high-end bathroom remodel run?
Contact
The suite the house never had
Show us the bathroom you have and describe the one you want. Fixed written scope, real schedule, honest answers — in English o en español.