
Kitchen Remodeling · Coral Gables, FL
Kitchens worthy of a Gables address.
Custom cabinetry, stone counters, and structural openings for Coral Gables kitchens — designed around how you cook, permitted through the city, and supervised daily by a licensed general contractor.
Kitchen Remodeling in Coral Gables
The kitchen your 1926 floor plan never imagined.
The classic Coral Gables kitchen problem is architectural. Merrick-era homes in Riviera, the Country Club Section, and the French Village were designed when kitchens were service rooms, tucked behind the dining room and sized for one cook who was not the homeowner. Today the kitchen is where everyone stands. So the high-end kitchen remodeling project here is usually a rescue mission: absorbing a butler's pantry or breakfast room, opening a masonry wall to the dining room, and putting a proper island where a bank of 1950s cabinets used to be.
An interior-only kitchen remodel in Coral Gables goes to the city's Development Services Department for permits and plan review without a stop at the Board of Architects. Change anything visible from outside, such as enlarging the window over the sink, venting through the facade, or cutting a new door to the terrace, and Board review comes first. Kitchens in designated historic homes may also need a Certificate of Appropriateness for exterior changes. Then there is the unglamorous part: plenty of older Gables houses need electrical service upgrades before they can run a modern appliance package, and we fold that work into the same permit.
PGX builds kitchens the way cabinetmakers wish contractors would: measured twice, sequenced properly, stone templated after the cabinets are set rather than before. You get a fixed written scope, a supervisor on site every day, and dust protection that treats the rest of your house as the finished product it is. Over 20-plus years in South Florida we have delivered more than 150 remodels and additions, all permitted and inspected, and a Gables kitchen gets nothing looser than that standard.

Where we work in Coral Gables
Elsewhere in Coral Gables? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
What we build into a Gables kitchen.
Every kitchen is scoped line by line before demolition starts. These are the elements that come up most often in Gables homes.
Cabinetry, not catalog sizes
Built-to-order cabinet packages with proper face frames or European boxes, finished to survive Miami humidity, and sized to older ceilings rather than stock dimensions.
Islands that carry the stone
Marble, quartzite, or granite templated in place, with island structures engineered for weight and seating overhangs supported correctly instead of hopefully.
Wall openings and structure
Load calculations, engineered beams, and permits for opening the wall between a closed 1920s kitchen and the rooms people actually use.
Ranges, ovens, and gas lines
Moving ranges, ovens, and refrigeration where the layout wants them, with new gas lines, venting, and dedicated circuits permitted and inspected.
Lighting and electrical upgrades
Layered lighting design, plus the panel and service upgrades many older Gables homes need before an induction range or wine room shows up.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Do I need a permit to remodel a kitchen in Coral Gables?
Will the Board of Architects need to see my kitchen plans?
How long will a custom kitchen remodel take?
Can you make a new kitchen fit a 1920s Mediterranean home?
What does a high-end kitchen remodel cost in Coral Gables?
Contact
Ready when your kitchen is
Schedule a walk-through and get a fixed-scope written estimate for the kitchen, in English o en español, whichever language you cook in.