
Permitting & Compliance · Coral Gables, FL
Records that match the house.
Permit applications, Board of Architects submittals, HVHZ product approvals and inspections in Coral Gables — plus closing out the open permits a prior owner left behind. Licensed general contractor, Lic. CGC1539072.
Permitting & Compliance in Coral Gables
How work gets approved in the Gables.
Most people do not go looking for a permitting contractor until something forces the issue. A title search on a Riviera bungalow turns up a 1990s addition permit nobody ever closed. A refinance on a Cocoplum waterfront house stalls because the generator and the pool heater were never inspected. A buyer's inspector notices that the enclosed Florida room on a Country Club Section home appears nowhere in the city's records. Coral Gables housing stock is old enough, and trades hands often enough, that this happens constantly, and it always surfaces at the least convenient hour.
Work here is filed electronically with the City of Coral Gables Development Services Department and reviewed by its Building Division. Anything visible from the street, from windows and doors to roofs, driveways and even exterior paint colors, goes to the Board of Architects first, and designated historic properties need a Certificate of Appropriateness before permits move. Windows, doors and roofing systems require Miami-Dade product approvals for the High-Velocity Hurricane Zone, installed exactly as the approval reads. On the water in Gables Estates, Tahiti Beach or Deering Bay, the city's floodplain administrator also weighs whether a project counts as substantial improvement.
Compliance work rewards contractors who read the file before they promise anything, and PGX has been reading South Florida files for over 20 years, across more than 150 remodels and additions, all of them permitted and inspected. We coordinate the engineer or architect a record requires instead of pretending to be one, we open up what needs to be seen before we scope it, and one supervisor calls the inspections and is standing there when they happen. Nobody here will tell you a shortcut exists, because in the Gables it does not.

Where we work in Coral Gables
Elsewhere in Coral Gables? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
The compliance work we take on.
Some clients call before a project starts. Some call the morning a title company flags something. Both get the same answer: a written plan for the file, not a reassuring phone call.
The open permit problem
Pulling the full permit history, establishing what was actually built, then filing, correcting or re-inspecting whatever each one needs before it can be closed.
Applications the Gables accepts
Electronic submittals to Development Services, Board of Architects packages for anything the street can see, and comment responses written to end the review loop instead of extending it.
Miami-Dade product approvals
Windows, doors and roofing carrying Miami-Dade approvals for the High-Velocity Hurricane Zone, installed to the fastening schedule the approval names, because inspectors read that page.
Ready before the inspector arrives
Trades sequenced so every phased inspection is genuinely ready, someone from PGX on site when the inspector arrives, and corrections cleared rather than argued.
Building recertification repairs
Concrete restoration, structural repairs and electrical work called out by a recertification, milestone inspection or reserve study, permitted and inspected as one package.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
There is an open permit on my Coral Gables house and I am trying to sell. What now?
Can you close out a permit that another contractor pulled?
Does the Board of Architects get involved in a permit cleanup?
Our condo board received a recertification notice. Is that work PGX does?
How much does it cost to legalize unpermitted work in Coral Gables?
Contact
Let us read the record
Send the permit number, the title report, or the notice you just received. We will tell you in writing what it takes, in English o en español.