Permitting & Compliance · Hollywood Lakes, FL
Close out what the last owner left.
Permit filing, HVHZ product approvals, inspections through a signed final, and closeout of the open or expired permits a prior owner left on a Hollywood Lakes property. Licensed general contractor filing with the City of Hollywood, Lic. CGC1539072.
Permitting & Compliance in Hollywood Lakes
A city desk with a historic layer.
Hollywood Lakes hands its permit trouble down with the deed. A 1920s Mediterranean on Harrison Street changes hands three times, and somewhere in that chain a garage became a bedroom, jalousies became impact windows, and a Florida room appeared off the back with nothing in the city file to show for it. Nobody notices until a title search, an appraiser or a lender does, usually with a closing date already on the calendar. On the lots running east toward the Intracoastal, add a dock or a seawall repair built and never inspected. None of it is a construction problem. All of it is a records problem.
Permits come from the Building Division inside Hollywood's Development Services Department. Applications, uploads and inspection requests now run through the city's Accela Citizen Access portal, while anything pulled before that changeover still lives in the older system, where most inherited files turn up. Behind the city sits a countywide code layer: the Broward County Board of Rules and Appeals publishes the county amendments to the Florida Building Code and certifies the plans examiners and inspectors who read your file. Broward is High-Velocity Hurricane Zone territory, so openings and roofing need approved products. On a designated property, a Certificate of Appropriateness comes first.
Twenty-plus years in South Florida and more than 150 permitted, inspected remodels and additions mostly teach you to read a bad file quickly. We start with the record and a walk-through, open whatever has to be opened, and retain the engineer, architect or surveyor the city will want to see rather than claiming those licenses ourselves. Close to the Intracoastal we check the flood side early, since federal substantial improvement limits can reshape a scope before it is priced. The scope is fixed and written, a supervisor is on site daily, and whoever ran the work meets the inspector. Nobody here will offer you a shortcut.

Where we work in Hollywood Lakes
Elsewhere in Hollywood Lakes? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
First the file, then the work.
Some of this starts as a plan for new work. The rest starts as something a previous owner left behind. Both begin the same way, with the record read end to end.
Permits inherited with the deed
Pulling the full permit history for the address, matching it against what is physically standing, then reviving, amending or re-inspecting each one until the city calls it closed.
Unpermitted work, legalized
Conversions and extensions that never reached a plan sheet, surveyed and drawn as they actually exist, reinforced where an engineer says so, then inspected into the record.
Impact glass with approvals
Openings and roofing tied to approvals valid in the High-Velocity Hurricane Zone, with anchoring submitted and installed exactly as the approval reads rather than by habit.
Inspections, called and met
Trade and structural inspections sequenced so nothing gets covered too early, each met on site by the supervisor who ran the work, through to the last signature.
Recertification repairs, permitted
Concrete restoration, railings, waterproofing and electrical work that a safety inspection or milestone report puts on a building's list, priced, permitted and built as one package.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
There is an open permit on our Hollywood Lakes house and the closing is set. What now?
What actually needs a permit on a house like ours?
The windows were replaced without a permit and the house is in a historic district. How bad is that?
Does building recertification or a milestone inspection reach a house here?
What does it cost to clear all of this up?
Contact
Bring us the closing date
Send the number, the title report or just the address, and you get a written read on what it takes to clear the file, in English o en español.