
Home Additions · Hollywood Lakes, FL
More square feet, same street.
Rear extensions, second stories, garage conversions and in-law suites for Hollywood Lakes homes, with foundations and tie-beams engineered, historic review handled where required, permits through the City of Hollywood and daily site supervision.
Home Additions in Hollywood Lakes
Adding on inside a historic district.
Hollywood Lakes was platted on fifty-foot lots with garages at the back and service alleys running behind every street. A 1920s two-bedroom on Tyler Street or a compact ranch on Jackson Street usually has room behind it and a way to get materials there without parading them past the front door, which is why so many owners here extend rather than list. The common projects are a rear family room and primary suite pushed into the back yard, a second story added over an original single-story plan, a garage turned into conditioned space, and an in-law suite for a household that has grown in both directions.
Hollywood's Building Division looks hard at exactly this kind of work. Zoning setbacks, lot coverage and height are reviewed by the Division of Planning and Urban Design, the Building Division permits the construction, and on a designated property inside a historic district the Historic Preservation Board weighs massing and materials through a Certificate of Appropriateness. Expect sealed structural engineering for footings, tie-beams and uplift, HVHZ product approvals for every new opening, and for lots near the Intracoastal, a hard look at flood zone and federal substantial improvement limits before anyone draws a wall.
Additions are where two decades of South Florida work actually shows. Tying a new footing to a 1920s foundation, matching stucco texture and barrel tile so the seam disappears, and keeping the occupied half of the house livable while the other half has no roof are all learned skills. PGX runs the project on a fixed written scope with a supervisor on site daily, coordinates the engineer and the reviews, and keeps one accountable team from the first feasibility conversation through final inspection and warranty.

Where we work in Hollywood Lakes
Elsewhere in Hollywood Lakes? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
Ways a Lakes house grows.
Each of these starts with engineering and an honest read of the review it will face. We would rather kill a bad idea in week one than at plan check.
Extending off the back
Family rooms, primary suites and enlarged dining space pushed into the yard, with foundation, tie-beam and roof tie-in designed and permitted as one package.
Second stories over old walls
Existing masonry and footings evaluated by an engineer first, then an upper floor designed to satisfy both the structure and the district's massing expectations.
Garage and carport conversions
Turning unconditioned space into legal living area, insulated and conditioned, with openings and mechanical work permitted so it counts when you sell.
A private family wing
Independent suites with bath, closet and kitchenette for long-stay family, scaled to the original architecture instead of appearing to have landed there.
Footings, tie-beams and uplift
Underpinning, new footings, steel and continuous load path work: the invisible half of the budget, and the half that decides whether the addition lasts.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Does an addition in Hollywood Lakes need Historic Preservation Board approval?
Can a 1920s masonry house carry a second story?
How does the flood zone affect an addition near the water?
How long does an addition take start to finish?
What does an addition cost per square foot here?
Contact
Come measure the back yard
Show us the lot, the survey and what you are missing. You get a candid feasibility read and honest numbers, in English o en español.