Primary bathroom with freestanding tub and marble shower — bathroom remodeling in Hillsboro Beach, Florida. Architectural rendering.

Bathroom Remodeling · Hillsboro Beach, FL

Bathrooms engineered to stay dry.

Primary suites, frameless showers and freestanding tubs for Hillsboro Beach homes and condominiums, with waterproofing flood-tested before tile, permits pulled through the town, and a licensed general contractor accountable for every inspection.

Licensed & insured Lic. CGC1539072 Hillsboro Beach · Broward County Hablamos español

Bathroom Remodeling in Hillsboro Beach

Water is the whole job.

The bathrooms in Hillsboro Beach were mostly built for a different decade of expectations. Oceanfront units in buildings like Hillsboro Island House, Opal Towers and the Sea Club came with compact baths and a single vanity, and the estate houses on Hillsboro Mile tend to have plenty of bathrooms and not one primary suite anyone would design today. So the projects here are conversions as much as renovations: absorbing a closet or a small bedroom, replacing a tub nobody uses with a shower two people can stand in, and finishing it in stone that will survive the salt.

Bathroom work is permitted through the Town of Hillsboro Beach Building Department, with plumbing, electrical and mechanical inspections along the way, all under the Florida Building Code as administered by the Broward County Board of Rules and Appeals. In a condominium, add association approval, a certificate of insurance and agreed working hours. The buildings themselves are the bigger variable: original cast iron waste lines, galvanized supply, and post-tensioned or conventionally reinforced slabs that decide whether a curbless shower is possible or merely photogenic. We investigate that before design, not during demolition.

Everything that matters in a bathroom is buried by the time you see it, which is why we build the invisible half first. Waterproofing membranes are flood-tested and held overnight before tile is set. Shower slopes are checked with instruments. Blocking for heavy glass goes into the wall months before the glass arrives. The rest of your home is already finished, so it gets covered and protected from the front door in. Fixed written scope, a supervisor here daily, licensed and insured under Lic. CGC1539072.

Frameless glass shower and marble detailing in a primary bath — architectural rendering

Where we work in Hillsboro Beach

Hillsboro Mile Royal Flamingo Villas Hillsboro Island House Hillsboro Mile Ocean Club Opal Towers The Sea Club Port de Mer Kingsley Arms Hillsboro Windsor Recess

Elsewhere in Hillsboro Beach? Call us — if it's in Miami-Dade or Broward, we probably build there.

What's included

The pieces of an island bath.

Written down and priced before the tile order goes in. These five elements carry most Hillsboro Beach bathroom projects, whether estate house or oceanfront unit.

01

Primary suites, assembled

Borrowing a closet, a hall or a small bedroom to build the double vanity, water closet and dressing space the original plan never allowed for.

02

Showers with tested pans

Sloped pans and membranes flood-tested before any tile is set, linear drains where the layout wants them, and frameless panels anchored into purpose-built structure.

03

Old pipe, replaced now

Swapping cast iron waste and galvanized supply while the walls are already open, which is the least expensive hour that work will ever cost.

04

Stone and salt air

Marble, travertine and porcelain selected and sealed for coastal humidity, with fixtures and hardware finished to resist what the Atlantic does to chrome.

05

Ventilation that actually vents

Salt-air rated fans on a short, real duct run to the outside, sconces flanking the mirror, and switching that separates shower from vanity.

Double vanity and mirrors in a renovated primary bathroom — architectural rendering

How we work

A remodel is a promise. We keep it in writing.

20+
Years building in South Florida
150+
Remodels and additions delivered
100%
Permitted and inspected work
1
Team accountable from estimate to warranty

AFixed scope, honest pricing

A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.

BA superintendent on site, daily

Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.

CBuilt to code, warrantied in writing

HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.

How it goes

From first walk to final walk-through.

01

Walk-through & estimate

We visit, measure, listen, and come back with a real scope and a real number — not a teaser.

1–2 weeks
02

Design & permits

Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.

4–10 weeks
03

Construction

Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.

Per scope
04

Closeout & warranty

Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.

1–2 weeks

FAQ

Straight answers.

Is a permit required if I am only replacing the shower?
If the shower is being reframed, repiped, rewaterproofed or moved, yes. Replacing a valve trim or a shower door is maintenance; rebuilding a pan is regulated work with rough plumbing and waterproofing inspections attached. The Town of Hillsboro Beach permits and inspects it, and the inspection record is worth having. Unpermitted bath work has an unpleasant habit of resurfacing during a sale or an insurance claim.
Can I get a curbless shower in a condominium unit?
It depends on the slab, and nobody should promise before looking. Recessing a pan means removing concrete, which in a post-tensioned slab is a serious engineering conversation and in some buildings simply is not permitted. Where the structure will not cooperate, a very low curb with a properly sloped pan gets you most of the look and all of the performance. We get the building's structural drawings and the association's position before you commit to a rendering.
My building is going through milestone inspections. Should I wait?
Usually not, but ask the board what is coming. Milestone inspections and structural reserve studies apply to buildings of three habitable stories or more, and if your building is scheduled for balcony or structural repairs on your stack, sequencing your interior work around that is simply sensible. Sometimes the smart move is to finish your bath first so the finished surfaces are protected during the building's work. We will read the board's schedule with you.
Why does the plumbing keep coming up in your estimates?
Because in houses and buildings from the 1950s through the 1970s, the drain and supply lines are frequently at the end of their service life, and a new stone bathroom draining into a failing stack is an expensive way to postpone a problem. We camera the lines during the estimate so the decision is made on evidence. If the pipe is sound, we say so and leave it alone.
What does a primary bathroom cost at this level?
Stone, glass and fixtures are visible drivers; the drains, supply, waterproofing and ventilation behind them are the part owners underestimate. Two bathrooms of identical size can differ by a wide margin depending on whether the building cooperates. Rather than publish a range that means nothing for your unit, we walk the space, scope what it actually needs and issue a fixed written number. We compete on finish quality and certainty, not on being the cheapest of three.

Contact

Which bath goes first?

Show us the room, the plumbing and the ambition. You get a real scope and a real number, in English o en español.

Office
Miami, FL
Hours
Mon–Fri, 8:00–18:00
Opens your email app — nothing is stored on this site.