
Home Additions · Pompano Beach, FL
Add on instead of moving on.
Rear extensions, second stories, garage conversions and in-law suites for Pompano Beach homes: engineered, permitted through Development Services, floodplain-reviewed where required, and built under daily supervision by a licensed general contractor.
Home Additions in Pompano Beach
Where a Pompano lot has room.
Pompano Beach lots from the canal-subdivision era are wider than they look and shallower than you would like, which makes an addition a design problem before it becomes a construction problem. The usual moves are familiar: a rear great room and primary suite pushed toward the water in Harbor Village or Snug Harbor, a second story over a single-story ranch in Santa Barbara Shores where the lot has nothing left to give, a garage or carport turned into a guest suite around Old Pompano, and full in-law wings on the deeper lots west of Federal Highway.
Nothing the City of Pompano Beach issues on a house is heavier than an addition permit. Development Services wants a signed and sealed plan set with survey, foundation plan, elevations, structural details and a window and door schedule, plus a geotechnical report with foundation recommendations, truss engineering, energy calculations and Manual J loads, a zoning compliance application, a tree permit if anything is growing near the work, and a floodplain application. Broward County environmental review enters where site work and drainage do. Inspections open at footings and formboard survey and close with a final survey and elevation certificate.
The half of an addition budget nobody photographs is footings, steel and tie-beams, and it decides whether the seam between old and new ever shows. We tie new foundations into existing ones correctly, match stucco texture and roof profile so the addition does not announce itself from the street, and keep the occupied portion of the house sealed off, powered and livable while the new part goes up. Everything is priced off a written specification, a superintendent runs the site daily, and one team carries the job from feasibility through warranty. That is how 150-plus remodels and additions have gone out the door, all of them permitted and inspected.

Where we work in Pompano Beach
Elsewhere in Pompano Beach? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
The addition types we build.
Each of these starts with an engineer and a survey rather than a rendering. They are the additions Pompano Beach homes ask for most often.
Adding onto the rear
Great rooms and primary suites taken out to the rear setback, with new footings and the roof joint drawn as one coordinated permit set.
Second floors over 1960s block
Structural evaluation of the existing walls and footings first, then an upper floor with stair, framing and shear detailing designed to what the building can carry.
Enclosing the garage legally
Turning a garage or carport into finished living space with insulation, impact-rated openings, extended mechanicals and permits, so it counts on the appraisal.
In-law quarters, permitted
A separate wing with its own bath and small galley, laid out for privacy and permitted as living space instead of framed in over a long weekend.
What holds the addition up
Geotechnical work, new footings, columns and tie-beam upgrades, plus the special inspector reports Broward requires when piles or threshold conditions come into play.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
How long from first meeting to a finished room?
Will FEMA rules stop me adding on to a canal house?
Does a second story need a brand new foundation?
Does anyone besides the city have to approve this?
What happens to the rest of the house while you build?
Contact
Tell us what you need
Bring the survey and the plan you have been sketching for two years. You get a feasibility read and a written number, in English o en español.