Primary bathroom with freestanding tub and marble shower — bathroom remodeling in Harbor Islands, Florida. Architectural rendering.

Bathroom Remodeling · Harbor Islands, FL

The bath your builder didn't build.

Primary suites, frameless showers, freestanding tubs and stone for Harbor Islands homes, with waterproofing flood-tested before tile. Fully permitted through the City of Hollywood, inspected, and supervised daily by a licensed contractor.

Licensed & insured Lic. CGC1539072 Harbor Islands · Broward County Hablamos español

Bathroom Remodeling in Harbor Islands

Second-floor baths, first-rate waterproofing.

The primary bath in a Harbor Islands house follows a script written around 1999: a corner tub with jets nobody has run in a decade, a glass block window, cultured marble tops, and a shower with a curb, a builder door and one sad niche. Owners in The Estates, Edgewater and Harborside are rewriting it into something calmer — a wet zone with a freestanding tub and a frameless walk-in shower, one long stone vanity, and a closet that finally makes sense with the bedroom next door.

Bathroom work here needs permits from the City of Hollywood Development Services Department, and the inspection sequence is the point rather than the obstacle: plumbing rough, electrical, and the shower pan flood test all get looked at before tile hides them. Broward's code amendments, administered by the Board of Rules and Appeals, govern the details, and any new or enlarged exterior window brings an HVHZ product approval and an association submittal. Nothing about an interior bath goes to architectural review, but everything about it goes past an inspector.

Most of these baths sit on the second floor, directly above a family room ceiling, which is why we treat waterproofing as structure rather than finish. Membranes are installed to the manufacturer's detail and flood-tested, slopes are verified with a level, blocking goes in before the heavy glass is ordered, and the exhaust actually reaches the outside. Scope is fixed in writing, one supervisor runs the job, and PGX has delivered more than 150 permitted and inspected remodels and additions across South Florida.

Frameless glass shower and marble detailing in a primary bath — architectural rendering

Where we work in Harbor Islands

The Estates Harborside Harbor Pointe Harborview Commodore Estates Admiral's Cove Edgewater Grand Harbor Estates Harbor Island Drive Harbor Court Windjammer Way Mariner Way Waterside Lane

Elsewhere in Harbor Islands? Call us — if it's in Miami-Dade or Broward, we probably build there.

What's included

How we rebuild a second-floor bath.

Every fixture, slab and membrane is named in the scope before demolition begins. These are the elements Harbor Islands owners ask for most.

01

Suites, not just baths

Reworking the bath, closet and bedroom wall into one suite, drawn and permitted before demolition so the plumbing lands where the layout wants it.

02

Frameless glass, solid backing

Heavy frameless panels hung on blocking installed during framing, with hinge and header locations set before the glass is ever measured.

03

Pans tested before tile

Bonded waterproofing carried up the walls and across the curb, filled with water and left overnight, because an upstairs leak finds the family room first.

04

Freestanding tubs, checked first

Tub placement verified against floor framing and drain routing, with fill and waste details resolved on paper before the stone ever arrives.

05

Ventilation and light

A fan that carries steam out through the roof rather than into the attic above it, and light at the mirror instead of only over your head.

Double vanity and mirrors in a renovated primary bathroom — architectural rendering

How we work

A remodel is a promise. We keep it in writing.

20+
Years building in South Florida
150+
Remodels and additions delivered
100%
Permitted and inspected work
1
Team accountable from estimate to warranty

AFixed scope, honest pricing

A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.

BA superintendent on site, daily

Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.

CBuilt to code, warrantied in writing

HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.

How it goes

From first walk to final walk-through.

01

Walk-through & estimate

We visit, measure, listen, and come back with a real scope and a real number — not a teaser.

1–2 weeks
02

Design & permits

Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.

4–10 weeks
03

Construction

Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.

Per scope
04

Closeout & warranty

Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.

1–2 weeks

FAQ

Straight answers.

Do bathroom remodels need permits in Hollywood?
Anything beyond swapping a vanity top or repainting does. Relocating a drain, adding circuits, changing ventilation or building a new shower requires permits and inspections through the City of Hollywood, on the same countywide Broward application. That inspection record is worth having: it is proof the waterproofing and rough plumbing were verified, which matters when the house eventually sells.
Can we do a curbless shower on the second floor?
Often yes, but it depends on how your second floor was built. Where the upper floor is framed, the structure can usually be dropped or modified to sink the pan; where it is a poured or precast concrete deck, the options narrow and the drain routing decides. On the ground floor, over a slab, it comes down to the waste line and how much concrete we can responsibly cut. We check the drawings and tell you which house you own before you commit.
How disruptive is this to the rest of the house?
Contained, if the contractor bothers. We seal the work zone, run a protected path from the door to the stair, cover finished floors and rails, and clean at the end of each day because in this community the neighbors are ten feet away. Water is shut down only for scheduled windows. Most families stay put, using a secondary bath, for the whole project.
How long does a primary bath take?
Six to twelve weeks of construction is a fair frame for a full primary bath, and it moves with selections. Stone slabs, custom vanities and specialty glass carry lead times that dwarf the labor, so we finalize choices before demolition rather than during it. Waiting on a tile decision with the room already open is how projects quietly double in length.
What does a bathroom at this level cost in Harbor Islands?
It ranges widely, because a guest bath refresh and a full primary suite with a stone wet room are not the same project. Slab selection, plumbing brand, glass and how far the plumbing moves are the real drivers. We would rather scope precisely than throw out a range you cannot rely on. Expect a high-end number, and expect it to be a fixed one.

Contact

Book the bathroom walk-through

Tell us what fails you every morning. We come look, measure, and put a real scope and a real number to it, in English o en español.

Office
Miami, FL
Hours
Mon–Fri, 8:00–18:00
Opens your email app — nothing is stored on this site.