
Bathroom Remodeling · Doral, FL
Primary baths, minus the garden tub.
PGX remodels Doral primary baths into stone, glass, and quiet luxury — fully permitted with the City of Doral and waterproofed to standards nobody sees but everybody benefits from.
Bathroom Remodeling in Doral
What Doral bathrooms are hiding.
The primary bath in a 1990s or 2000s Doral home follows a formula: a corner garden tub nobody has filled since the housewarming, a small framed shower, cultured-marble counters, and a strip of Hollywood lights. Owners across Doral Isles, Costa del Sol, and Grand Bay Estates are trading that formula for the current one — a large curbless shower behind frameless glass, a freestanding tub if the room earns it, double vanities in real stone, and tile chosen by a human being.
Bathroom remodels in Doral pull permits through the City of Doral Building Department, with plumbing and electrical reviewed as separate sub-permits and inspections at the stages that matter — including the shower pan, which is tested before a single tile goes on. Relocating fixtures or adding a freestanding tub changes drain and supply runs, which is exactly the work you want inspected. Second-floor baths raise the stakes: a slow leak up there finishes the ceiling below in a way nobody ordered.
Waterproofing is where bathroom budgets are quietly won or lost, so PGX treats it as scope, not an afterthought: modern membrane systems, flood-tested pans, sealed niches and benches, all documented before tile hides the evidence. The rest of the job runs the PGX way — a fixed written price, materials confirmed before demolition, protected hallways in an occupied house, and a supervisor on site daily. One licensed team, Lic. CGC1539072, from the first measurement to the warranty call you probably will not need.

Where we work in Doral
Elsewhere in Doral? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
The bathroom scope, top to bottom.
Whether it is one primary suite or every bath in the house, the written scope covers these elements and more.
Showers in the tub's footprint
Frameless glass, linear drains, and slope built into the floor — the old corner tub almost always gives the new shower room to breathe.
The layer under the tile
Membrane systems and flood-tested pans installed to manufacturer spec and inspected by the city before tile goes down. Unseen, and non-negotiable.
Freestanding tubs, drawn first
Placed with the floor-mounted filler, reinforcement, and drain relocation planned in drawings first, so the showpiece never becomes a plumbing improvisation.
Tile layouts drawn before ordering
Porcelain slabs, natural stone, and large-format tile set flat and aligned, with the cuts planned so they land where they should.
Vanities and quiet ventilation
Custom double vanities, ventilation sized to the room, and layered lighting that flatters at 7 a.m. better than a Hollywood strip ever did.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Does remodeling a bathroom in Doral involve permits?
Can a garden tub be replaced with a walk-in shower?
How do you keep a second-floor bathroom from leaking?
How long is a primary bathroom out of service during a remodel?
How do your crews work inside a gated Doral community?
Contact
Begin where the day begins
One walk-through tells us what your bathroom can become and what it will take. Estimates are honest and bilingual — in English o en español.